Planning report · Cork City Council · 2000 m around the house · the last 12 months · 25 Oct 2026, 14:38

Old Blarney Road

51.91947, -8.55819

Homes here mostly date from the 1970s. 246 homes approved 1.9 km away haven't started.

See on the mapWatch this area

Not held yet for Cork City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 94 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
P5
Zoning · Rural and agricultural
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningP5 · Rural and agricultural
What it says

City Hinterland: To protect and improve rural amenity and provide for the development of agriculture.

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

cork city development plan 2022 2028 variation no 3 npf implementation · 8 Aug 2022 – 8 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings33Alverna; Church of the Resurrection (Garrycloyne)
Monuments72Mill - woollen; Castle - tower house
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 873 on the draft 2027 map; 798 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 80% approved.

New house in a garden or site5 decided · more info asked 0%
80% · council 66%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 5 nearby, 323 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 94 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 94 days; Appeal window: 4 weeks; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 94 days, middle half 56–106 (n=19)94 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 118 days after permission (n=10)118 days after permissionSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated19 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 502060 Invalid · Kerry Pike, Carrigrohane, Co. Cork · 1.5 km
    • 324508 Pending · Lands at Milboro, Kerry Pike, Cork City. · 1.2 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher24 Oct 2026, 23:01open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 4

    What's changing around you?

    Street map around Old Blarney Road with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homesApproved
    1. 1Ringwood, Shean Upper and Shean Lower 25/44406Approved with conditions · 1.3 km
    2. 2Ringwood 2443031Approved, no sign building has started · 1.9 km
    3. 31.3 ha zoned for homesEmpty land zoned for homes · 962 m
    4. 40.4 ha zoned for homesEmpty land zoned for homes · 975 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 1.0 km
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 1.0 km
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 1.0 km
    8. 80.1 ha zoned for homesEmpty land zoned for homes · 1.0 km
    9. 9Rosebank, Killard 2544302Approved with conditions · 568 m
    10. 10Turret House, Blarney Castle Estate 25/44372Approved with conditions · 648 m
    11. 11Sunnybank, Killard 26/44499Approved with conditions · 711 m
    12. 12Ballycannon, Kerrypike 26/44871Approved with conditions · 1.1 km
    13. 13Existing Former Stables, Blarney Castle Estate 26/44841Approved with conditions · 1.2 km
    14. 14Site adjacent to Lisalea, Upper Leemount 25/44443Approved with conditions · 1.2 km
    15. 15Ballycannon, Kerrypike 26/44570Approved with conditions · 1.3 km
    Figure 5

    The next 30 days

    2 deadlines within 2.0 km; the first closes 27 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-27 25/44406: Conditional Permission — Permission for a Large-Scale Residential Development (LRD); 2026-11-03 ACP 502060: Invalid - no acknowledgement of local submission S.127(1)etoday30 Oct4 Nov9 Nov14 Nov19 Nov24 Nov25/44406: Conditional Permission — Permission for a Large-Scale Residential Development (LRD) · 1.3 km away · 2026-10-27ACP 502060: Invalid - no acknowledgement of local submission S.127(1)e · 1.5 km away · 2026-11-03
    Time to appeal endsHigh Court window ends
    • Time to appeal ends 27 Oct 20262 days left
      125/44406 · Conditional Permission — Permission for a Large-Scale Residential Development (LRD)
      €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away
    • Time to ask the High Court for a review ends 3 Nov 20269 days left
      Invalid - no acknowledgement of local submission S.127(1)e
      1.5 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    246 homes 1.9 km away were approved May 2025 with no start notice yet; the permission runs to May 2030.

    Ringwood · 246 homes: 246 homes approved May 2025, not started20242025202620272028202920302031Ringwood · 246 homes1.9 km · 2443031246 homes approved May 2025, not started246 homes approved May 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 12 within 2.0 km

    Derelict building 1

    • 20 Muskerry Terrace, Blarney · derelict since Nov 2021 · 1.8 km

    Approved, not started 1

    • Ringwood · 246 homes approved May 2025, not started · 1.9 km

    Empty land zoned for homes 10

    • 31.3 ha zoned for homes · no homes built on it yet · 962 m
    • 40.4 ha zoned for homes · no homes built on it yet · 975 m
    • 50.2 ha zoned for homes · no homes built on it yet · 1.0 km
    • 60.2 ha zoned for homes · no homes built on it yet · 1.0 km
    • 70.1 ha zoned for homes · no homes built on it yet · 1.0 km
    • 80.1 ha zoned for homes · no homes built on it yet · 1.0 km
    • 0.2 ha zoned for homes · no homes built on it yet · 1.0 km
    • 0.3 ha zoned for homes · no homes built on it yet · 1.0 km
    • 0.1 ha zoned for homes · no homes built on it yet · 1.0 km
    • 2.9 ha zoned for homes · no homes built on it yet · 1.0 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Every application within 2.0 km 20 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    Building work nearby 8 in the last 12 months
    3 not signed off5 no sign-off needed
    • SUNBERRY COTTAGE, THE HILL, BLARNEY, CO. CORK, Cork · 5 Aug 2026 · 1 homes · short notice no sign-off needed · 26/44505 · 1.8 km
    • Windmill View House, Upper Leemount, Carrigrohane, Cork, T23 XHH3 · 15 May 2026 · 1 homes · start notice, opted out no sign-off needed · 23/42372 · 1.5 km
    • 2 The Square, Blarney, Cork, T23 HF78 · 4 May 2026 · 1 homes · start notice not signed off · 25/43711 · 1.6 km
    • millboro, coolymurraghue, upper leemount, kerry pike, cork., Kerry Pike, Cork · 21 Apr 2026 · start notice not signed off · ABP-314905-22 & 22/40976 · 1.4 km
    • Liscahane Woods, Woodside, Kerry Pike, Cork · 23 Mar 2026 · 29 homes · start notice not signed off · 24/43381 · 1.4 km
    • COURTBRACK, Cork · 13 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 25/04595 · 1.6 km
    • Edgewood, 14 Sunberry Drive,, Blarney, Cork, T23 T276 · 15 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 25 / 44040 · 1.9 km
    • 33 The Groves, Shean Lower, Blarney, T23 XH36, Cork, T23 XH36 · 18 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 25/44014 · 1.4 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    Homes coming 246 not started
    • 2Ringwood · 246 homes · not started · runs out 6 May 2030 · 1.9 km
    • Kilronan · 60 homes · building started · 1.1 km
    • Coolymurraghue · 41 homes · building started · 1.3 km
    • Woodside · 26 homes · building started · 1.6 km
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Who applies most nearby

    • Glenwood Property Development Ltd — 2 applications, latest 16 Jun 2026
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Source: Applicant organisations (from the CRO) · fetched 18 Oct 2026, 23:06
    SourceLicenceFetchedLink
    Applicant organisations (from the CRO)Derived by Planning Register18 Oct 2026, 23:06—
    How busy is this area Quieter than most of Cork City Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here1
    Council middle43
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    24% of homes built before 1971 (council 36%). 82% owner-occupied (council 56%).

    Homes built before 1971
    24% · council 36%
    Homes built since 2001
    17% · council 24%
    Owner-occupied
    82% · council 56%
    Rented
    13% · council 38%
    Children under 15
    18% · council 17%
    Aged 65 and over
    20% · council 15%
    Households with 2+ cars
    62% · council 36%
    Work mainly from home
    14% · council 12%
    This small area (412 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047298005

    Nearest school
    1.2 km
    Clogheen Mxd NS, 181 pupils
    Schools, stops and the council

    Schools

    • Clogheen Mxd NS · primary · 181 pupils · 1.2 km
    • Scoil Mhuire gan Smal · postprimary · 1124 pupils · 1.4 km
    • Gaelscoil Mhuscraí · primary · 195 pupils · 1.6 km
    • Scoil Chroí Íosa · primary · 286 pupils · 1.9 km

    Stops 10

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 25 Oct 2026, 01:51
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic25 Oct 2026, 01:52open
      Council meetings (ModernGov)Public25 Oct 2026, 01:51open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned P5 (rural and agricultural), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      St. Mary's (West)
      Electoral area
      Cork City North West
      Council
      Cork City Council
      Everything we found, as a list 8 lines
      • Zoned P5 (rural and agricultural); not protected; no vacant land tax.
      • 12 sites nearby could change: 1 derelict, 1 approved scheme, 10 empty zoned plots.
      • 246 homes approved nearby, not started; largest 246 at Ringwood.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 82% owner-occupied (council 56%); 1% of homes empty (council 6%); most built 1971–1980; 67% drive to work (council 54%).
      • The council decides in a median 56 days (about 8 weeks); 1 in 8 is asked for more information.
      • 20 applications nearby in the last 12 months; 100% approved (council 93%); 15% for work already built (council 19%).
      • 1 homes started within 1 km in 3 years (council middle 43).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.025 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public25 Oct 2026
      www2.courts.ie—© the publisher24 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public25 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.025 Oct 2026
      organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register18 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence25 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 25 Oct 2026, 14:38 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.