PlanningRegister.ie
Planning report · Cork County Council · 2000 m around the house · the last 12 months · 23 Oct 2026, 22:09

Carrigtohill ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland

51.92311, -8.26403

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (100%). 43 homes approved 1.6 km away haven't started.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings10house; Garrancloyne House
Monuments44Ringfort - rath; Fulacht fia
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 20 on the draft 2027 map; 20 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 74% approved.

New house in a garden or site23 decided · more info asked 0%
74% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 23 nearby, 8,048 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 51–62 (n=31)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated31 decided home extensions, 6 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 1 in the last 12 months
    • 500753 Granted with conditions · Castlelake Avenue, Cork Road, Carrigtohill, Carrigtwohill, Co.Cork · 1.5 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher22 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 4

    What's changing around you?

    Street map around Carrigtohill ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApproved
    1. 1Ard na Sailí/Castlelake, Terry's-land and Carrigtohill (Townlands) 26/2599No decision yet · 973 m
    2. 2Tibbotstown, Carrigtwohill 26/2509No decision yet · 1.5 km
    3. 3Ballynoe, Terrysland 26/0637Approved with conditions · 813 m
    4. 4IDA Industrial Estate, Anngrove Townland 26/1764Approved with conditions · 1.7 km
    5. 5Station Road Carrigtwohill Carrigtohill 21/6240Approved, not started, approval runs out within a year · 1.3 km
    6. 6Main Street Carrigtohill Carrigtwohill Co.Cork 22/4440Approved, not started, approval runs out within a year · 1.6 km
    7. 7Elmbury Carrigtohill Carrigtwohill Co Cork 24/6016Approved, no sign building has started · 1.8 km
    8. 8Elmbury 26/1130Approved, no sign building has started · 1.9 km
    9. 92.5 ha zoned for homesEmpty land zoned for homes · 775 m
    10. 1013.0 ha zoned for homesEmpty land zoned for homes · 804 m
    11. 112.2 ha zoned for homesEmpty land zoned for homes · 985 m
    12. 123.0 ha zoned for homesEmpty land zoned for homes · 1.1 km
    13. 130.6 ha zoned for homesEmpty land zoned for homes · 1.2 km
    14. 141.0 ha zoned for homesEmpty land zoned for homes · 1.2 km
    15. 156, An Cuasan 26/1252Approved with conditions · 998 m
    Figure 4

    The next 30 days

    4 deadlines within 2.0 km; the first closes 27 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-27 26/1764: Grant with Conditions — Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for Planning Permission for an amendment to a previously pe; 2026-10-27 26/0637: Grant with Conditions — Construction of two new detached dwelling houses, installation of two wastewater treatment systems with percolation area; 2026-11-02 26/2509: application received — Permission to decommission existing septic tank and install a new sewerage treatment system to serve existing dwelling; 2026-11-16 26/2599: application received — a Large-Scale Residential Development (LRD) comprising alterations to the Strategic Housing Development (SHD) permitted today28 Oct2 Nov7 Nov12 Nov17 Nov22 Nov26/1764: Grant with Conditions — Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for Planning Permission for an amendment to a previously pe · 1.7 km away · 2026-10-2726/0637: Grant with Conditions — Construction of two new detached dwelling houses, installation of two wastewater treatment systems with percolation area · 813 m away · 2026-10-2726/2509: application received — Permission to decommission existing septic tank and install a new sewerage treatment system to serve existing dwelling · 1.5 km away · 2026-11-0226/2599: application received — a Large-Scale Residential Development (LRD) comprising alterations to the Strategic Housing Development (SHD) permitted · 973 m away · 2026-11-16
    Comments closeTime to appeal ends
    • Time to appeal ends 27 Oct 20264 days left
      426/1764 · Grant with Conditions — Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for Planning Permission for an…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.7 km away
    • Time to appeal ends 27 Oct 20264 days left
      326/0637 · Grant with Conditions — Construction of two new detached dwelling houses, installation of two wastewater treatment…
      €220 to An Coimisiún Pleanála (€110 observer) · 813 m away
    • Comments close 2 Nov 202610 days left
      226/2509 · application received — Permission to decommission existing septic tank and install a new sewerage treatment system to…
      €20 to the council · 1.5 km away
    • Comments close 16 Nov 202624 days left
      126/2599 · application received — a Large-Scale Residential Development (LRD) comprising alterations to the Strategic Housing…
      €20 to the council · 973 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 5

    Approved, stalled or planned, not built yet

    43 homes 1.6 km away were approved Oct 2022 with no start notice yet; the permission runs to Oct 2027.

    Main Street Carrigtohill… · 43 homes: 43 homes approved, not started; runs out Oct 2027; Station Road… · 38 homes: 38 homes approved, not started; runs out Jan 2027; Elmbury · 28 homes: 28 homes approved Sep 2026, not started; Elmbury Carrigtohill… · 16 homes: 16 homes approved Feb 2025, not started20222023202420252026202720282029203020312032Main Street Carrigtohill… · 43 homes1.6 km · 22/444043 homes approved, not started; runs out Oct 202743 homes approved, not started; runs out Oct 2027Station Road… · 38 homes1.3 km · 21/624038 homes approved, not started; runs out Jan 202738 homes approved, not started; runs out Jan 2027Elmbury · 28 homes1.9 km · 26/113028 homes approved Sep 2026, not started28 homes approved Sep 2026, not startedElmbury Carrigtohill… · 16 homes1.8 km · 24/601616 homes approved Feb 2025, not started16 homes approved Feb 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 14 within 2.0 km

    Approved, not started, approval running out 2

    Approved, not started 2

    Empty land zoned for homes 10

    • 92.5 ha zoned for homes · no homes built on it yet · 775 m
    • 1013.0 ha zoned for homes · no homes built on it yet · 804 m
    • 112.2 ha zoned for homes · no homes built on it yet · 985 m
    • 123.0 ha zoned for homes · no homes built on it yet · 1.1 km
    • 130.6 ha zoned for homes · no homes built on it yet · 1.2 km
    • 141.0 ha zoned for homes · no homes built on it yet · 1.2 km
    • 0.1 ha zoned for homes · no homes built on it yet · 1.2 km
    • 3.0 ha zoned for homes · no homes built on it yet · 1.2 km
    • 3.0 ha zoned for homes · no homes built on it yet · 1.3 km
    • 0.5 ha zoned for homes · no homes built on it yet · 1.4 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 6

    Applications within 500 m, by year

    2021: 2, 2023: 105102021: 2 approved2’21*2023: 1 approved1’23
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 33 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Building work nearby 21 in the last 12 months
    2 signed off as finished14 not signed off5 no sign-off needed
    • Terrysland, Cork · 23 Oct 2026 · 663 homes · start notice not signed off · ABP-313827-22 · 1.1 km
    • Cork Road, Carrigtwohill, Cork · 21 Oct 2026 · 7-day notice not signed off · 24/05931 · 1.6 km
    • Cork Road, Carrigtwohill, Cork · 19 Oct 2026 · 7-day notice not signed off · 24/05931 · 1.3 km
    • 29 Castleview, Carrigtohill, Cork, T45 VA09 · 20 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 26/0573 · 1.3 km
    • Gortnamucky, Carrigtwohill, Cork · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 21/07412 · 320 m
    • GE Healthcare, IDA Industrial Estate, Carrigtwohill, Cork · 27 May 2026 · start notice not signed off · 25/4506 · 1.9 km
    • IDA Industrial Estate, Carrigtohill, Cork, T45K202 · 15 May 2026 · start notice not signed off · 256759 · 1.6 km
    • Terrysland, Cork · 29 Apr 2026 · 663 homes · 7-day notice not signed off · ABP-313827-22 · 1.2 km
    • Terrysland, Cork · 29 Apr 2026 · 663 homes · 7-day notice not signed off · ABP-313827-22 · 1.0 km
    • IDA Business Park, Terry's-Land, Carrigtwohill, Terrysland, Cork, T45 H210 · 25 Mar 2026 · 7-day notice signed off · 1.6 km
    • The Meadows, Elmbury, Carrigane Road, Carrigtwohill, Cork · 20 Mar 2026 · 10 homes · start notice not signed off · 24/06020 · 1.7 km
    • Woodstock, Carrigtwohill, Cork, T45 RX29 · 19 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 254820 · 1.5 km
    • East End, Carrigtwohill, Cork · 20 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 216372 · 1.6 km
    • Elmbury Estate, Carrigtwohill, Cork · 5 Jan 2026 · start notice signed off · 23/04313 · 1.6 km
    • The Meadows, Elmbury, Carrigane Road, Carrigtwohill, Cork · 5 Jan 2026 · 28 homes · start notice not signed off · 24/06020 · 1.6 km
    • Terrysland, Station Bridge, Cork · 2 Jan 2026 · 663 homes · start notice not signed off · ABP-313827-22 · 916 m
    • Garrancloyne, Carrigtwohill, Cork · 2 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 245862 · 887 m
    • GE Healthcare, IDA Industrial Estate,, Carrigtwohill, Cork · 2 Jan 2026 · start notice not signed off · 254506 · 1.9 km
    • 60-A Main Street, Carrigtwohill, Cork, T45 KV05 · 30 Dec 2025 · 1 homes · start notice not signed off · 1.5 km
    • GE Healthcare, IDA Industrial Estate, Carrigtwohill, Co. Cork, T12 HP7R, Cork · 4 Nov 2025 · start notice not signed off · 25/04506 · 1.9 km
    • IDA Industrial Estate, Carrigtwohill, Co. Cork, T12 HP7R, Cork · 27 Oct 2025 · start notice not signed off · 25/04506 · 1.9 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:22
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Homes coming 125 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Wendy House Montessori School · Crèche9 Nov 2023 · report · Tusla Early Years Inspectorate970 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here668
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    76% owner-occupied (council 73%).

    Homes built before 1971
    27% · council 28%
    Homes built since 2001
    26% · council 36%
    Owner-occupied
    76% · council 73%
    Rented
    16% · council 22%
    Children under 15
    20% · council 21%
    Aged 65 and over
    19% · council 16%
    Households with 2+ cars
    56% · council 52%
    Work mainly from home
    7% · council 12%
    This small area (301 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047077005

    Train
    765 m
    Carrigtwohill · Mallow - Cobh
    Nearest school
    1.1 km
    Carrigtwohill Post Primary, 912 pupils
    Schools, stops and the council

    Schools

    • Carrigtwohill Post Primary · postprimary · 912 pupils · 1.1 km
    • East Cork Community Special School · primary · 32 pupils · 1.1 km
    • Scoil Mhuire Naofa · primary · 396 pupils · 1.2 km
    • St Aloysius College · postprimary · 765 pupils · 1.5 km
    • Scoil Chlochair Mhuire National School · primary · 245 pupils · 1.5 km
    • Carrigtwohill Community National School · primary · 443 pupils · 1.8 km

    Stops 10

    • Carrigtwohill · Mallow - Cobh · 4/hour at peak · 765 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 02:42
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Council consultation portalsPublic23 Oct 2026, 01:47open
    Council meetings (ModernGov)Public23 Oct 2026, 02:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 973 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Fahydorgan
    Electoral division
    Carrigtohill
    Electoral area
    Cobh
    Council
    Cork County Council
    Everything we found, as a list 8 lines
    • No vacant land tax.
    • 14 sites nearby could change: 4 approved schemes, 10 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 16 Nov 2026.
    • 125 homes approved nearby, not started; largest 43 at Main Street Carrigtohill Carrigtwohill….
    • No morning-peak service within 500 m; nearest is Carrigtwohill, 764 m away (4 an hour).
    • Here (2022 census): 76% owner-occupied (council 73%); 11% of homes empty (council 13%); most built 1971–1980; 72% drive to work (council 66%); population up 12% since 2016.
    • Around here the council decides in a median 80 days (about 11 weeks).
    • Homes started within 1 km: 665 in the last year, 1 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
    www2.courts.ie—© the publisher22 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 23 Oct 2026, 22:09 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.