Planning report · Waterford City And County Council · 500 m around the house · the last 12 months · 23 Oct 2026, 21:19

Clashmore

52.01031, -7.82002

Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2025.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 2 planning files on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 2 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of ClashmoreBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: 2560124 · extension, approved2025: 2560119 · extension, withdrawn or invalid2021: 1 file on Clashmore2023: 2 files on Clashmore2025: 1 file on Clashmore2026: 1 file on Clashmore5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2560124 · extension · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  2. 2025
    2560119 · extension · withdrawn
    approved?started?signed off?
  • 6 Jun 2025 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
On this site
M4
Zoning · Major town centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningM4 · Major town centre
What it says

RV: Protect and promote the character of the Rural Village and promote a vibrant community appropriate to available physical and community infrastructure.

The main town centre — retail, offices, civic uses, apartments.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Protected building1 within 100 m Detached two-bay double-height rubble stone single-cell Board of First Fruits Church of Ireland church, built 1813, with single-bay three-stage entrance tower to west on a square plan. Derelict, 1977. Extensively renovated, 2000, to accommodate use as h
Heritage inventory3 within 100 m Clashmore House; Clashmore House
Monument zone4 within 100 m Bullaun stone, Clashmore; Cross, Clashmore

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Clashmore (552 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings23The Thatch; Clashmore Bridge
Monuments9R130885; R130887
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved, and 67% are asked for more information.

New house in a garden or site6 decided · more info asked 67%
83% · council 82%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 1,549 council-wide

Figure 3

Clashmore, file by file since 2021

3 of 3 decided extensions on the road were approved.

5 planning files on Clashmore since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · two-storey rear · approved · 21194No number · 2025 · single-storey side · approved · 2560124No number · 2026 · single-storey rear · approved · 2611Porches, roofs, otherNo number · 2023 · other work · approved · 23166No number · 2023 · other work · approved · 23303New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Clashmore" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Clashmore with 1 numbered planning items
    ⌖ the houseApproved
    1. 1Chapel Lane, Coolboa 2611Approved with conditions · 355 m
    Figure 4

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 5

      Applications within 500 m, by year

      Between 1 and 2 a year; busiest 2023. 100% of decisions were approvals.

      2021: 1, 2023: 2, 2025: 1, 2026: 105102021: 1 approved1’21*2023: 2 approved2’232025: 1 approved1’252026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      • 1Chapel Lane , Coolboa , Clashmore Approved with conditions
        to demolish existing side extension and to construct a first floor extension over existing ground floor which…
        261117 Sept 20261 homes355 m
      • Chapel Lane , Coolboa , Clashmore Withdrawn or not valid
        demolish existing side extension and to construct a first floor extension over existing ground floor which…
        26120 Jan 2026354 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:28
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area About as busy as most of Waterford City and County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here3
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
      National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
      Question 5

      What's the area like?

      Figure 6

      This street block against the council

      62% of homes built before 1971 (council 29%). 60% owner-occupied (council 65%).

      Homes built before 1971
      62% · council 29%
      Homes built since 2001
      19% · council 30%
      Owner-occupied
      60% · council 65%
      Rented
      38% · council 29%
      Children under 15
      22% · council 19%
      Aged 65 and over
      17% · council 17%
      Households with 2+ cars
      33% · council 41%
      Work mainly from home
      13% · council 11%
      This small area (99 people)Waterford City And

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 227022002/02

      Bus
      227 m
      Clashmore · 357 · busiest stop within 500 m: 0 an hour at peak
      Nearest school
      112 m
      S N An Chlais Mhor, 76 pupils
      Schools, stops and the council

      Schools

      • S N An Chlais Mhor · primary · 76 pupils · 112 m

      Stops 2

      • Clashmore · 357 · 0/hour at peak · 227 m
      • Clashmore · 357 · 0/hour at peak · 227 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N An Chlais Mhor · 111 m-6.2% pupils (76)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 02:42
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
      Council consultation portalsPublic23 Oct 2026, 01:47open
      Council meetings (ModernGov)Public23 Oct 2026, 02:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Extension (2560124) approved 2025, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Clashmore
      Electoral division
      Clashmore
      Electoral area
      Dungarvan
      Council
      Waterford City And County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2560124, approved 2025, not started, runs out 2030.
      • Zoned M4 (major town centre); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • Clashmore (bus 357) 227 m away: 6 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 60% owner-occupied (council 65%); 19% of homes empty (council 11%); most built before 1919; 64% drive to work (council 63%); population up 15% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 40% are asked for more information.
      • 2 applications nearby in the last 12 months.
      • 3 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 4 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
      www2.courts.ie—© the publisher22 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
      services-eu1.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 23 Oct 2026, 21:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.