PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 10 Oct 2026, 17:59

Bartlemy Hill

52.04425, -8.26557

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2015.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 199 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2015.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of GarryantaggartBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2015: 15/4057 · new house, withdrawn or invalid2014: 14/6637 · new house, withdrawn or invalid2004: 3 files on Garryantaggart2007: 1 file on Garryantaggart2009: 2 files on Garryantaggart2010: 1 file on Garryantaggart2012: 2 files on Garryantaggart2014: 1 file on Garryantaggart2015: 3 files on Garryantaggart2021: 1 file on Garryantaggart2022: 1 file on Garryantaggart2023: 5 files on Garryantaggart2025: 2 files on Garryantaggart22 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2015
    15/4057 · new house · withdrawn
    approved?started?signed off?
  2. 2014
    14/6637 · new house · withdrawn
    approved?started?signed off?
On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Bartlemy (152 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Saint Bartholomew's Church
Monuments8Enclosure; Souterrain
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, epa_leap, rzlt, constraints, constraints.niah, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 9 Oct 2026, 23:23
SourceLicenceFetchedLink
bcmsCC-BY-4.09 Oct 2026, 23:23open
npadCC-BY-4.010 Oct 2026, 01:42open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved.

New house in a garden or site6 decided · more info asked 0%
100% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 8,048 council-wide

Figure 3

Garryantaggart, file by file since 2004

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 5.

22 planning files on Garryantaggart since 2004, by kind and decision.200420062008201020122014201620182020202220242026Extensions, atticsNo number · 2022 · attic conversion / dormer · undecided · 22/6179No number · 2023 · single-storey rear · undecided · 23/4764No number · 2023 · single-storey rear · approved · 23/5021Porches, roofs, otherNo number · 2004 · other work · approved · 04/1481No number · 2004 · other work · undecided · 04/6622No number · 2004 · other work · approved · 04/6886No number · 2007 · other work · approved · 07/11232No number · 2009 · other work · undecided · 09/6541No number · 2009 · other work · approved · 09/7028No number · 2010 · other work · approved · 10/5148No number · 2012 · other work · undecided · 12/4594No number · 2012 · other work · approved · 12/4765No number · 2015 · other work · approved · 15/6402No number · 2025 · other work · undecided · 25/6051New house in a side gardenNo number · 2014 · new house · undecided · 14/6637No number · 2015 · new house · undecided · 15/4057No number · 2015 · new house · approved · 15/6339No number · 2021 · new house · approved · 21/5198No number · 2023 · new house · undecided · 23/4197No number · 2023 · new house · approved · 23/4410No number · 2023 · new house · approved · 23/5453No number · 2025 · new house · approved · 25/5099
ApprovedRefusedWithdrawn or invalid

22 files with "Garryantaggart" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2004–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 10 Oct 2026, 01:42
    SourceLicenceFetchedLink
    npadCC-BY-4.010 Oct 2026, 01:42open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    npadCC-BY-4.010 Oct 2026, 01:42open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 199 days.

    Comments open: 5 weeks · €20; Council decision: 199 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 199 days, middle half 67–320 (n=9)199 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeks

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated9 decided home extensions, 0 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Bartlemy Hill with 1 numbered planning items
    ⌖ the houseApproved
    1. 1Bishop O'Brien National School, Bartlemy 26/1466Approved with conditions · 265 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 16 permissions since 2016, 0 show a start notice and 0 have a completion certificate.

    33 applications lodged within 500 m. Council: 16 approved, 0 refused. After appeals: 16 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 0 started, 16 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT16: lodged → approved17: lodged → undecided16: approved → approved17: undecided → undecided16: approved → no start notice found33 lodged33 lodged16 approved16 approved17 undecided17 undecided16 approved16 approved17 undecided17 undecided16 no start notice found16 no start notice found

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured33 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Applications within 500 m, by year

      Between 2 and 10 a year; busiest 2023. 100% of decisions were approvals.

      2017: 2, 2018: 2, 2021: 4, 2022: 6, 2023: 10, 2024: 2, 2025: 5, 2026: 205102017: 2 undecided2’17*2018: 2 approved2’182021: 1 approved2021: 3 undecided4’212022: 1 approved2022: 5 undecided6’222023: 6 approved2023: 4 undecided10’232024: 2 approved2’242025: 3 approved2025: 2 undecided5’252026: 1 approved2026: 1 undecided2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 10 Oct 2026, 01:42
      SourceLicenceFetchedLink
      npadCC-BY-4.010 Oct 2026, 01:42open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.09 Oct 2026, 23:23open
      Building work nearby 2 in the last 12 months
      2 not signed off
      • Pairc an Tobair, Ballynakilla, Bartlemy, Cork · 12 Dec 2025 · 1 homes · start notice not signed off · 23/05346 · 450 m
      • Pairc an Tobair, Ballynakilla, Bartlemy, Cork · 12 Dec 2025 · 8 homes · start notice not signed off · 25/04759 · 443 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 9 Oct 2026, 23:23
      SourceLicenceFetchedLink
      bcmsCC-BY-4.09 Oct 2026, 23:23open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Bartlemy Preschool · Crèche4 Mar 2026 · report · Tusla Early Years Inspectorate486 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
      SourceLicenceFetchedLink
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here14
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.09 Oct 2026, 23:23open
      npadCC-BY-4.010 Oct 2026, 01:42open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      77% owner-occupied (council 73%).

      Homes built before 1971
      35% · council 28%
      Homes built since 2001
      41% · council 36%
      Owner-occupied
      77% · council 73%
      Rented
      14% · council 22%
      Children under 15
      23% · council 21%
      Aged 65 and over
      13% · council 16%
      Households with 2+ cars
      61% · council 52%
      Work mainly from home
      14% · council 12%
      This small area (262 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047168002

      Nearest school
      333 m
      Bartlemy NS, 89 pupils
      Schools, stops and the council

      Schools

      • Bartlemy NS · primary · 89 pupils · 333 m

      Stops 0

        Schools growing or shrinking planning in 3 years · pupils last year

        Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
        SourceLicenceFetchedLink
        gtfsCC-BY-4.04 Oct 2026, 23:41open
        schoolsCC-BY-4.027 Sept 2026, 23:32open
        npadCC-BY-4.010 Oct 2026, 01:42open
        consultpublic10 Oct 2026, 01:23open
        moderngovpublic10 Oct 2026, 01:24open
        lda_landsCC-BY-4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Garryantaggart
        Electoral division
        Gortroe
        Electoral area
        Fermoy
        Council
        Cork County Council
        Everything we found, as a list 8 lines
        • 2 applications on this site; latest 15/4057, withdrawn.
        • No vacant land tax.
        • Nothing nearby looks set to change.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 76% owner-occupied (council 73%); 7% of homes empty (council 13%); most built 2001–2010; 65% drive to work (council 66%); population up 7% since 2016.
        • The council decides in a median 66 days (about 9 weeks).
        • 2 applications nearby in the last 12 months.
        • Bartlemy NS, 333 m away: temporary classrooms approved (2026). Pupils down 5% last year.
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 27
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.09 Oct 2026
        data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
        dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public10 Oct 2026
        www2.courts.ie—all-rights-reserved10 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
        data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
        transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
        lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)public10 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.010 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…10 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
        gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
        gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 10 Oct 2026, 17:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.