PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 26 Oct 2026, 01:03

Cluain Ard, Bweeng

52.04497, -8.72016

Homes here mostly date from the 2000s.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Beennamweel WestBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 5 files on Beennamweel West2024: 1 file on Beennamweel West2025: 5 files on Beennamweel West11 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Bweeng and Environs (419 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Beennamweel West, file by file since 2022

New houses in side gardens or on sites: 3 of 3.

11 planning files on Beennamweel West since 2022, by kind and decision.20222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2024 · other work · undecided · 24/6536No number · 2025 · other work · undecided · 25/4267No number · 2025 · other work · refused · 25/4531No number · 2025 · other extension · undecided · 25/5074New house in a side gardenNo number · 2022 · new house · undecided · 22/4335No number · 2022 · new house · undecided · 22/4536No number · 2022 · new house · undecided · 22/4772No number · 2022 · new house · approved · 22/5081No. 2 · 2022 · new house · approved · 22/6262No number · 2025 · new house · approved · 25/5304No. 40 · 2025 · new house · undecided · 25/6625
ApprovedRefusedWithdrawn or invalid

11 files with "Beennamweel West" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Cluain Ard, Bweeng with 1 numbered planning items
    ⌖ the houseNo decision yet
    1. 1Beennamweel East, Bweeng 26/1654No decision yet · 450 m
    Figure 3

    What happens to applications within 500 m

    Permission isn't building. Of 4 permissions since 2016, 1 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    13 applications lodged within 500 m. Council: 4 approved, 1 refused. After appeals: 4 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 0 started, 3 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT4: lodged → approved1: lodged → refused8: lodged → undecided4: approved → approved1: refused → refused8: undecided → undecided3: approved → no start notice found1: approved → built, owner opted out13 lodged13 lodged4 approved4 approved1 refused1 refused8 undecided8 undecided4 approved4 approved1 refused1 refused8 undecided8 undecided3 no start notice found3 no start notice found1 built, owner opted out1 built, owner opted out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured13 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 4

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 5

      Applications within 500 m, by year

      Between 1 and 5 a year; busiest 2025. 80% of decisions were approvals.

      2022: 6, 2024: 1, 2025: 5, 2026: 105102022: 3 approved2022: 3 undecided6’22*2024: 1 undecided1’242025: 1 approved2025: 1 refused2025: 3 undecided5’252026: 1 undecided1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2022 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Kids Corner Pre- School · Crèche25 Feb 2025 · report · Tusla Early Years Inspectorateapprox. 665 m
      Playdays Pre-School · Crèche4 Mar 2025 · report · Tusla Early Years Inspectorate980 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area About as busy as most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here1
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Question 5

      What's the area like?

      Figure 6

      This street block against the council

      9% of homes built before 1971 (council 28%). 82% owner-occupied (council 73%).

      Homes built before 1971
      9% · council 28%
      Homes built since 2001
      73% · council 36%
      Owner-occupied
      82% · council 73%
      Rented
      11% · council 22%
      Children under 15
      32% · council 21%
      Aged 65 and over
      6% · council 16%
      Households with 2+ cars
      67% · council 52%
      Work mainly from home
      7% · council 12%
      This small area (415 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047140003/01

      Bus
      643 m
      Bweeng · 243
      Nearest school
      816 m
      S N Moing na Miol, 113 pupils
      Schools, stops and the council

      Schools

      • S N Moing na Miol · primary · 113 pupils · 816 m

      Stops 2

      • Bweeng · 243 · 0/hour at peak · 643 m
      • Bweeng · 243 · 0/hour at peak · 660 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Moing na Miol · 816 m-10.3% pupils (113)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 00:55
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Council consultation portalsPublic26 Oct 2026, 00:55open
      Council meetings (ModernGov)Public25 Oct 2026, 01:51open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Beennamweel West
      Electoral division
      Dromore
      Electoral area
      Mallow
      Council
      Cork County Council
      Everything we found, as a list 7 lines
      • No vacant land tax.
      • Nothing nearby looks set to change.
      • No morning-peak service within 500 m; nearest is Bweeng, 643 m away (5 a day).
      • Here (2022 census): 82% owner-occupied (council 73%); 5% of homes empty (council 13%); most built 2001–2010; 81% drive to work (council 66%); population up 13% since 2016.
      • The council decides in a median 66 days (about 9 weeks).
      • 2 applications nearby in the last 12 months.
      • 1 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 3 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.025 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
      www2.courts.ie—© the publisher25 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public25 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.025 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 26 Oct 2026, 01:03 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.