Planning report · Kerry County Council · 500 m around the house · the last 12 months · 27 Oct 2026, 10:44

Castle Falls

52.04877, -9.51435

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (98%). 134 homes approved 338 m away haven't started.

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BunrowerBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 1 file on Bunrower2022: 4 files on Bunrower2023: 1 file on Bunrower6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G4
Zoning · Open space
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningG4 · Open space
What it says

Active Open Space is intended solely for the provision of recreational uses

Open space and recreational amenity, to be preserved as such.

killarney municipal district settlements plan variation 2 kerry cdp 2022 2028 · 19 Jan 2026 – 14 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Killarney (719 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Reen Cottage
Monuments11Enclosure; Excavation - miscellaneous
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 22 on the draft 2027 map; 22 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 98% approved, and 1 in 3 is asked for more information.

New house in a garden or site43 decided · more info asked 40%
98% · council 86%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 43 nearby, 1,899 council-wide

Figure 3

Bunrower, file by file since 2021

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

6 planning files on Bunrower since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2022 · attic conversion / dormer · approved · 22218No. 9 · 2022 · side · approved · 22314Porches, roofs, otherNo number · 2021 · other work · approved · 21153No number · 2022 · other work · approved · 2268New house in a side gardenNo. 3 · 2022 · new house · approved · 222833No. 1 · 2023 · new house · approved · 23581
ApprovedRefusedWithdrawn or invalid

6 files with "Bunrower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 108 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 160 days; Appeal window: 4 weeks; Building starts: 186 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=62)55 daysIf more info asked (1 in 4)With further information: median 160 days (n=20)160 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 186 days after permission (n=32)186 days after permissionSigned off79% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated82 decided home extensions, 33 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 3 appealed refusals became permissions. 6 of 21 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed21 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501441 Granted with conditions · Killarney Race Course , Ross Road , Killarney · 42 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 4

    What's changing around you?

    Street map around Castle Falls with 15 numbered planning items
    ⌖ the houseApproved, not startedAppealEmpty land zoned for homesBuilding startedApprovedNo decision yet
    1. 1Scrahane 2460277Approved, no sign building has started · 312 m
    2. 2Ross Road 2560682Approved, no sign building has started · 338 m
    3. 3Killarney Race Course, Ross Road 501441Appeal: approved with conditions · 42 m
    4. 46.7 ha zoned for homesEmpty land zoned for homes · 44 m
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 105 m
    6. 663 Ross Road, Killarney 26/60255Building started · 121 m
    7. 70.4 ha zoned for homesEmpty land zoned for homes · 138 m
    8. 80.7 ha zoned for homesEmpty land zoned for homes · 202 m
    9. 90.3 ha zoned for homesEmpty land zoned for homes · 265 m
    10. 101.6 ha zoned for homesEmpty land zoned for homes · 281 m
    11. 1163 Castle Falls, Ross Road 2660255Approved with conditions · 102 m
    12. 12Priory Grove, Muckross Rd 2660769No decision yet · 276 m
    13. 138 The Lodges Ross Road, Killarney 2660365Approved with conditions · 293 m
    14. 14No. 4 Ross Avenue, Ross Road Killarney 2561208Approved with conditions · 298 m
    15. 155 Priory Grove, Muckross Road 2660767No decision yet · 333 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 41 permissions since 2016, 19 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    41 applications lodged within 500 m. Council: 41 approved, 0 refused. After appeals: 41 approved. Of those: 1 signed off, 13 built with the owner's opt-out, 5 started, 20 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT41: lodged → approved41: approved → approved20: approved → no start notice found13: approved → built, owner opted out5: approved → started, not signed off1: approved → signed off2: approved → ran out41 lodged41 lodged41 approved41 approved41 approved41 approved20 no start notice found20 no start notice found13 built, owner opted out13 built, owner opted out5 started, not signed off5 started, not signed off1 signed off1 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured41 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 29 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-29 ACP 501441: Grant permission with revised conditionstoday1 Nov6 Nov11 Nov16 Nov21 Nov26 NovACP 501441: Grant permission with revised conditions · 42 m away · 2026-10-29
    High Court window ends
    • Time to ask the High Court for a review ends 29 Oct 20262 days left
      Grant permission with revised conditions
      42 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    134 homes 338 m away were approved Sept 2025 with no start notice yet; the permission runs to Feb 2031.

    Ross Road · 134 homes: 134 homes approved Sep 2025, not started; Scrahane · 14 homes: 14 homes approved Aug 2024, not started202420252026202720282029203020312032Ross Road · 134 homes338 m · 2560682134 homes approved Sep 2025, not started134 homes approved Sep 2025, not startedScrahane · 14 homes311 m · 246027714 homes approved Aug 2024, not started14 homes approved Aug 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 2

    • Scrahane · 14 homes approved Aug 2024, not started · 311 m
    • Ross Road · 134 homes approved Sep 2025, not started · 338 m

    Empty land zoned for homes 9

    • 46.7 ha zoned for homes · no homes built on it yet · 44 m
    • 50.4 ha zoned for homes · no homes built on it yet · 105 m
    • 70.4 ha zoned for homes · no homes built on it yet · 138 m
    • 80.7 ha zoned for homes · no homes built on it yet · 202 m
    • 90.3 ha zoned for homes · no homes built on it yet · 265 m
    • 101.6 ha zoned for homes · no homes built on it yet · 281 m
    • 0.6 ha zoned for homes · no homes built on it yet · 305 m
    • 0.3 ha zoned for homes · no homes built on it yet · 316 m
    • 2.9 ha zoned for homes · no homes built on it yet · 351 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 5 and 9 a year; busiest 2023. 100% of decisions were approvals.

    2021: 8, 2022: 7, 2023: 9, 2024: 5, 2025: 6, 2026: 605102021: 8 approved8’21*2022: 7 approved7’222023: 9 approved9’232024: 5 approved5’242025: 6 approved6’252026: 6 approved6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 11 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Building work nearby 5 in the last 12 months
    1 not signed off4 no sign-off needed
    • 663 Ross Road, Killarney, Kerry, V93 X0V8 · 15 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 26/60255 · 121 m
    • Ross Road, Killarney, Kerry · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560387 · 388 m
    • 4 Ross Avenue, Killarney, Kerry, V93 HCN8 · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2561208 · 372 m
    • 6 Ross Avenue, Ross Road, Killarney, Kerry, V93 HH2F · 27 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560863 · 363 m
    • Killarney Racecourse, Ross Road, Killarney, Kerry · 18 Dec 2025 · 7-day notice not signed off · 22687 · 224 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Homes coming 148 not started
    • 2Ross Road · 134 homes · not started · runs out 8 Feb 2031 · 338 m
    • 1Scrahane · 14 homes · not started · runs out 1 Aug 2029 · 312 m
    • SCRAHANE · 14 homes · building started · 308 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    How busy is this area Busier than most of Kerry County Council.
    Homes approved
    Here148
    Council middle0
    Homes started
    Here31
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    65% owner-occupied (council 70%).

    Homes built before 1971
    19% · council 26%
    Homes built since 2001
    28% · council 32%
    Owner-occupied
    65% · council 70%
    Rented
    29% · council 24%
    Children under 15
    16% · council 18%
    Aged 65 and over
    11% · council 19%
    Households with 2+ cars
    51% · council 44%
    Work mainly from home
    10% · council 11%
    This small area (681 people)Kerry

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077101002

    Bus
    568 m
    Whitegates Hotel · KY01
    Schools, stops and the council

    Schools

    None nearby.

      Stops 5

      • Whitegates Hotel · KY01 · 0/hour at peak · 568 m
      • Scrahane · KY01 · 715 m
      • The Brehon Htl · KY03 · 0/hour at peak · 779 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic27 Oct 2026, 00:57open
      Council meetings (ModernGov)Public27 Oct 2026, 01:57open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G4 (open space), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Bunrower
      Electoral division
      Killarney Rural
      Electoral area
      Killarney
      Council
      Kerry County Council
      Everything we found, as a list 8 lines
      • Zoned G4 (open space); no vacant land tax.
      • 11 sites nearby could change: 2 approved schemes, 9 empty zoned plots.
      • 148 homes approved nearby, not started; largest 134 at Ross Road.
      • No morning-peak service within 500 m; nearest is Whitegates Hotel, 568 m away (8 a day).
      • Here (2022 census): 65% owner-occupied (council 70%); 17% of homes empty (council 22%); most built 1991–2000; 51% drive to work (council 62%); population up 11% since 2016.
      • 1 home extension within 250 m since 2026.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 12 in the last year, 18 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
      www2.courts.ie—© the publisher26 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 27 Oct 2026, 10:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.