Planning report · Kerry County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 10:15

Ballycasheen Road

52.05657, -9.47974

Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (96%). 49 homes approved 480 m away haven't started.

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallycasheenBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 21868 · work already done, approved2021: 5 files on Ballycasheen2022: 1 file on Ballycasheen2023: 6 files on Ballycasheen2024: 2 files on Ballycasheen2025: 1 file on Ballycasheen15 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    21868 · work already done · approved 2021 · work already done
    approvedstartedsigned off?
  • 14 Apr 2021 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
On this site
R2
Zoning · Existing residential
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and improve existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

killarney municipal district settlements plan variation 2 kerry cdp 2022 2028 · 19 Jan 2026 – 14 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Sara Lee (Ireland) Ltd (538 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments3Gate lodge; Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 32 on the draft 2027 map; 32 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 88% approved, and 1 in 2 are asked for more information.

New house in a garden or site33 decided · more info asked 52%
88% · council 86%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 33 nearby, 1,911 council-wide

Figure 3

Ballycasheen, file by file since 2021

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

15 planning files on Ballycasheen since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 1 · 2022 · first-floor · approved · 22141No number · 2023 · attic conversion / dormer · approved · 23594No. 48 · 2024 · porch / front · approved · 24381No number · 2024 · other extension · approved · 2460498Porches, roofs, otherNo. 2 · 2021 · other work · approved · 211272No number · 2021 · other work · approved · 21332No number · 2021 · other work · approved · 21868No number · 2023 · other work · approved · 23274No number · 2023 · other work · approved · 23548No number · 2023 · other work · approved · 2360280No number · 2023 · other work · approved · 2360432No number · 2023 · other work · approved · 23759No number · 2025 · other work · approved · 2514New house in a side gardenNo number · 2021 · new house · approved · 21642No number · 2021 · new house · approved · 2180
ApprovedRefusedWithdrawn or invalid

15 files with "Ballycasheen" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 126 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 170 days; Appeal window: 4 weeks; Building starts: 207 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=42)55 daysIf more info asked (1 in 4)With further information: median 170 days (n=13)170 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 207 days after permission (n=20)207 days after permissionSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated55 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 3 appealed refusals became permissions. 2 of 15 appealed approvals were reversed.

    Refusals appealed3 decided
    0 became permissions
    Approvals appealed15 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ballycasheen Road with 10 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesNo decision yet
    1. 1Upper Park Road, Killarney 2661034No decision yet · 351 m
    2. 2N22 AND BALLYCASHEEN ROAD 23759Approved, no sign building has started · 480 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 29 m
    4. 43.5 ha zoned for homesEmpty land zoned for homes · 29 m
    5. 51.7 ha zoned for homesEmpty land zoned for homes · 30 m
    6. 62.0 ha zoned for homesEmpty land zoned for homes · 144 m
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 167 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 167 m
    9. 9Upper Park Road, Killarney 2660657No decision yet · 398 m
    10. 10Hazelwood Drive, Ballyspillane 2660884No decision yet · 420 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 5 show a start notice and 2 have a completion certificate.

    21 applications lodged within 500 m. Council: 18 approved, 3 refused. After appeals: 18 approved. Of those: 2 signed off, 1 built with the owner's opt-out, 2 started, 12 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved3: lodged → refused18: approved → approved3: refused → refused12: approved → no start notice found1: approved → built, owner opted out2: approved → started, not signed off2: approved → signed off1: approved → ran out21 lodged21 lodged18 approved18 approved3 refused3 refused18 approved18 approved3 refused3 refused12 no start notice found12 no start notice found1 built, owner opted out1 built, owner opted out2 started, not signed off2 started, not signed off2 signed off2 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured21 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 11 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-11 2660983: application received — Planning permission to extend the existing SuperValu store into the existing pharmacy with elevational changes with all ; 2026-11-25 2661034: application received — (a)Planning permission to construct offices on first floor of Supermac’s takeaway (b)Retention permission to retain the today10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec2660983: application received — Planning permission to extend the existing SuperValu store into the existing pharmacy with elevational changes with all · 351 m away · 2026-11-112661034: application received — (a)Planning permission to construct offices on first floor of Supermac’s takeaway (b)Retention permission to retain the · 351 m away · 2026-11-25
    Comments close
    • Comments close 11 Nov 20266 days left
      2660983 · application received — Planning permission to extend the existing SuperValu store into the existing pharmacy with…
      €20 to the council · 351 m away
    • Comments close 25 Nov 202620 days left
      12661034 · application received — (a)Planning permission to construct offices on first floor of Supermac’s takeaway (b)Retention…
      €20 to the council · 351 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    49 homes 480 m away were approved Jan 2025 with no start notice yet; the permission runs to Jan 2030.

    N22 AND BALLYCASHEEN ROAD · 49 homes: 49 homes approved Jan 2025, not started2024202520262027202820292030N22 AND BALLYCASHEEN ROAD · 49 homes480 m · 2375949 homes approved Jan 2025, not started49 homes approved Jan 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    Empty land zoned for homes 10

    • 30.4 ha zoned for homes · no homes built on it yet · 29 m
    • 43.5 ha zoned for homes · no homes built on it yet · 29 m
    • 51.7 ha zoned for homes · no homes built on it yet · 30 m
    • 62.0 ha zoned for homes · no homes built on it yet · 144 m
    • 70.3 ha zoned for homes · no homes built on it yet · 167 m
    • 80.2 ha zoned for homes · no homes built on it yet · 167 m
    • 0.3 ha zoned for homes · no homes built on it yet · 179 m
    • 0.5 ha zoned for homes · no homes built on it yet · 196 m
    • 0.2 ha zoned for homes · no homes built on it yet · 232 m
    • 0.3 ha zoned for homes · no homes built on it yet · 250 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 6 a year; busiest 2023. 86% of decisions were approvals.

    2021: 7, 2022: 1, 2023: 6, 2024: 6, 2025: 105102021: 6 approved2021: 1 refused7’21*2022: 1 approved1’222023: 6 approved6’232024: 4 approved2024: 2 refused6’242025: 1 approved1’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • Upper Park Road , Killarney , Co Kerry. comments close 11 Nov 2026
      Planning permission to extend the existing SuperValu store into the existing pharmacy with elevational…
      26609837 Oct 2026351 m
    • 1Upper Park Road , Killarney , Co Kerry comments close 25 Nov 2026
      (a)Planning permission to construct offices on first floor of Supermac’s takeaway (b)Retention permission to…
      266103421 Oct 2026351 m
    Every application within 500 m 4 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 2 in the last 12 months
    2 not signed off
    • Cork Road, Killarney, Kerry · 13 Oct 2026 · start notice not signed off · 439 m
    • Ballycasheen, Killarney, Kerry · 6 May 2026 · 4 homes · 7-day notice not signed off · 2360432 · 153 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 49 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    St. Oliver's Pre- school Ballycasheen CLG · Crèche11 Jun 2026 · report · Tusla Early Years Inspectorate629 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Kerry County Council.
    Homes approved
    Here116
    Council middle0
    Homes started
    Here24
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    11% of homes built before 1971 (council 26%). 77% owner-occupied (council 70%).

    Homes built before 1971
    11% · council 26%
    Homes built since 2001
    33% · council 32%
    Owner-occupied
    77% · council 70%
    Rented
    12% · council 24%
    Children under 15
    14% · council 18%
    Aged 65 and over
    20% · council 19%
    Households with 2+ cars
    46% · council 44%
    Work mainly from home
    13% · council 11%
    This small area (247 people)Kerry

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077102031

    Nearest school
    903 m
    St Olivers Ns, 625 pupils
    Schools, stops and the council

    Schools

    • St Olivers Ns · primary · 625 pupils · 903 m

    Stops 0

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Olivers Ns · 903 m+0.5% pupils (625)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (21868): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Application 351 m away open for comments until 25 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballycasheen
      Electoral division
      Killarney Urban
      Electoral area
      Killarney
      Council
      Kerry County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 21868, approved 2021, work already done.
      • Zoned R2 (existing residential); no vacant land tax.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 2 applications open for comments nearby; nearest closes 25 Nov 2026.
      • 49 homes approved nearby, not started; largest 49 at N22 AND BALLYCASHEEN ROAD.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 77% owner-occupied (council 70%); 6% of homes empty (council 22%); most built 1991–2000; 62% drive to work (council 62%); population down 3% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 10:15 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.