Planning report · Kerry County Council · 500 m around the house · the last 12 months · 28 Oct 2026, 06:54

17 New Street, Killarney

52.05897, -9.51168

Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2022. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MonearmoreBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2022: 22496 · change of use, approved2021: 2 files on Monearmore2022: 1 file on Monearmore2023: 1 file on Monearmore2024: 1 file on Monearmore2025: 1 file on Monearmore6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    22496 · change of use · approved 2022 · not started, runs out 2027
    approvedstartedsigned off
On this site
M2
Zoning · Major town centre
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Centre zoning which caters for a mix of uses

The main town centre — retail, offices, civic uses, apartments.

killarney municipal district settlements plan variation 2 kerry cdp 2022 2028 · 19 Jan 2026 – 14 Aug 2028

Heritage inventory4 within 100 m Killarney Post Office; bishop's palace

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings83Saint Mary's Catholic Cathedral; Saint Brendan's College
Monuments10Ritual site - holy well; Ogham stone (present location)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 36 on the draft 2027 map; 36 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 90% approved, and 1 in 2 is asked for more information.

Single-storey rear11 decided · more info asked 0%
100% · council 98%
New house in a garden or site60 decided · more info asked 43%
90% · council 86%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 71 nearby, 2,082 council-wide

Figure 3

Monearmore, file by file since 2021

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

6 planning files on Monearmore since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2023 · other extension · approved · 23262No. 41 · 2025 · other extension · approved · 2560620Porches, roofs, otherNo number · 2021 · other work · approved · 21334No. 69 · 2021 · other work · approved · 21572No number · 2024 · other work · approved · 24106New house in a side gardenNo number · 2022 · new house · approved · 22916
ApprovedRefusedWithdrawn or invalid

6 files with "Monearmore" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 1 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Other11—

Refused within 100 m 1 in the last 12 months

  • 2561092 · change of use · refused 27 Mar 2026 · 18 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 4 is asked for more information, which adds about 105 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 154 days; Appeal window: 4 weeks; Building starts: 145 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=77)55 daysIf more info asked (1 in 4)With further information: median 154 days (n=25)154 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 145 days after permission (n=35)145 days after permissionSigned off75% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated102 decided home extensions, 36 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

1 of 4 appealed refusals became permissions. 8 of 32 appealed approvals were reversed.

Refusals appealed4 decided
1 became permissions
Approvals appealed32 decided
8 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 3 in the last 12 months
  • 502018 Pending · Scrahane Court / Scrahane Mews , Ross Road , Killarney Co. Kerry · 462 m
  • 500895 Refused · Curlew's Nest Bed & Breakfast No. 8 York Terrace , Lewis Road ,… · 404 m
  • 500855 Granted · REAR OF ST MARY TERRACE AND ST MARY ROAD , TOWNLAND OF INCH ,… · 266 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Courts Service legal diary (judicial reviews)© the publisher27 Oct 2026, 23:11open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 4

What's changing around you?

Street map around 17 New Street, Killarney with 15 numbered planning items
⌖ the houseRefusedBuilding startedEmpty land zoned for homesApprovedNo decision yet
  1. 1New street & Beech Street, Killarney 2561092Refused · 18 m
  2. 214 New Street, Killarney 25/60970Building started · 28 m
  3. 3New St, Killarney SN0014838KYBuilding started · 143 m
  4. 40.5 ha zoned for homesEmpty land zoned for homes · 167 m
  5. 50.7 ha zoned for homesEmpty land zoned for homes · 190 m
  6. 60.1 ha zoned for homesEmpty land zoned for homes · 224 m
  7. 70.7 ha zoned for homesEmpty land zoned for homes · 272 m
  8. 80.1 ha zoned for homesEmpty land zoned for homes · 279 m
  9. 90.1 ha zoned for homesEmpty land zoned for homes · 292 m
  10. 10Killarney Tourist Information Office, Beech Road Killarney 2660321Approved with conditions · 91 m
  11. 11The Granary Beech Rd, Killarney 2660597Approved with conditions · 121 m
  12. 1235 New Street, Killarney 2561005Approved with conditions · 144 m
  13. 13The Flesk Restaurant, 14 Main St 2561065Approved with conditions · 159 m
  14. 14The Old Bank, Main Street 2561206No decision yet · 180 m
  15. 152/3 Bohereencaol Glebe, Killarney 2660288Approved with conditions · 257 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 116 permissions since 2016, 30 show a start notice and 4 have a completion certificate.

128 applications lodged within 500 m. Council: 119 approved, 9 refused. After appeals: 116 approved. Of those: 4 signed off, 9 built with the owner's opt-out, 17 started, 77 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT119: lodged → approved9: lodged → refused116: approved → approved9: refused → refused3 approved by the council, refused after an appeal77: approved → no start notice found9: approved → built, owner opted out17: approved → started, not signed off4: approved → signed off9: approved → ran out128 lodged128 lodged119 approved119 approved9 refused9 refused116 approved116 approved12 refused12 refused77 no start notice found77 no start notice found9 built, owner opted out9 built, owner opted out17 started, not signed off17 started, not signed off4 signed off4 signed off9 ran out9 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured128 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

Nothing closes within 500 m in the next 30 days.

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 40.5 ha zoned for homes · no homes built on it yet · 167 m
    • 50.7 ha zoned for homes · no homes built on it yet · 190 m
    • 60.1 ha zoned for homes · no homes built on it yet · 224 m
    • 70.7 ha zoned for homes · no homes built on it yet · 272 m
    • 80.1 ha zoned for homes · no homes built on it yet · 279 m
    • 90.1 ha zoned for homes · no homes built on it yet · 292 m
    • 0.5 ha zoned for homes · no homes built on it yet · 303 m
    • 0.2 ha zoned for homes · no homes built on it yet · 317 m
    • 0.3 ha zoned for homes · no homes built on it yet · 326 m
    • 0.2 ha zoned for homes · no homes built on it yet · 336 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 16 and 26 a year; busiest 2025. 93% of decisions were approvals.

    2021: 31, 2022: 25, 2023: 16, 2024: 23, 2025: 26, 2026: 70102030402021: 30 approved2021: 1 refused31’21*2022: 25 approved25’222023: 15 approved2023: 1 refused16’232024: 18 approved2024: 5 refused23’242025: 24 approved2025: 2 refused26’252026: 7 approved7’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 18 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Building work nearby 9 in the last 12 months
    7 not signed off2 no sign-off needed
    • 4 Lewis Road, Killarney, Kerry, V93 H72R · 23 Oct 2026 · 7-day notice not signed off · 2561136 · 416 m
    • 3New St, Killarney, Kerry, V93 HWY8 · 22 Sept 2026 · 2 homes · 7-day notice not signed off · 143 m
    • 214 New Street, Killarney, Kerry, V93 DD0V · 14 Aug 2026 · 7-day notice not signed off · 25/60970 · 28 m
    • Sunnyhill Lower, Killarney, Kerry · 31 Jul 2026 · 2 homes · 7-day notice not signed off · 25/60040 · 325 m
    • 6b Scotts Street, Killarney, Kerry, V93 HW28 · 13 Jul 2026 · start notice not signed off · 23/60001 · 431 m
    • Ross Road, Killarney, Kerry, V93 FFP3 · 7 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 23/1115 & ABP-320749-24 · 474 m
    • Beech Rd, Killarney, Kerry, V93 WV96 · 9 Mar 2026 · 4 homes · 7-day notice not signed off · 132 m
    • East Avenue, Killarney, Kerry, V93 RXC2 · 18 Feb 2026 · 7-day notice not signed off · 25/60850 · 413 m
    • 41 New Street, Killarney, Kerry, V93 YHN4 · 9 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560620 · 187 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bluebells Preschool & Afterschool · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 215 m
    Firies Community Childcare Centre CLG · Crèche10 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 215 m
    Coolick Pre-School · Crèche12 May 2025 · report · Tusla Early Years Inspectorateapprox. 215 m
    Creative Kids Pre- School & Childcare · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 215 m
    Currow Playschool · Crèche9 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 215 m
    Anabla Preschool Play 'n' Learn · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorateapprox. 215 m
    Maggies Montessori · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorateapprox. 215 m
    First Step Childcare · Crèche31 Jul 2024 · report · Tusla Early Years Inspectorateapprox. 215 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 27 Oct 2026, 23:04
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Kerry County Council.
    Homes approved
    Here771
    Council middle0
    Homes started
    Here69
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    20% owner-occupied (council 70%).

    Homes built before 1971
    32% · council 26%
    Homes built since 2001
    8% · council 32%
    Owner-occupied
    20% · council 70%
    Rented
    78% · council 24%
    Children under 15
    9% · council 18%
    Aged 65 and over
    12% · council 19%
    Households with 2+ cars
    12% · council 44%
    Work mainly from home
    1% · council 11%
    This small area (119 people)Kerry

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077102018

    Bus
    201 m
    Killarney Mission · 300, 722 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    309 m
    St. Brigid's Secondary School, 789 pupils
    Schools, stops and the council

    Schools

    • St. Brigid's Secondary School · postprimary · 789 pupils · 309 m
    • St. Brendan's College · postprimary · 871 pupils · 388 m
    • Holy Cross Primary School · primary · 345 pupils · 441 m
    • Scoil Mhuire na Mainistreach · primary · 167 pupils · 538 m
    • Killarney Community College · postprimary · 469 pupils · 639 m

    Stops 9

    • Killarney Mission · 300, 722 · 1/hour at peak · 201 m
    • Killarney Mission Road · KY01 · 0/hour at peak · 277 m
    • Saint Mary's Cathedral · KY01 · 416 m
    • East Avenue · KY03 · 0/hour at peak · 451 m
    • Killarney Stn · KY03 · 0/hour at peak · 653 m
    • Killarney Bus Stn · 14, 257, 270, 271, 276, 279 · 4/hour at peak · 677 m
    • Scrahane · KY01 · 710 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St. Brigid's Secondary School · 309 m+2.5% pupils (789)
    • St. Brendan's College · 388 m-0.2% pupils (871)
    • Holy Cross Primary School · 441 m-7.5% pupils (345)
    • Scoil Mhuire na Mainistreach · 538 m-13.9% pupils (167)
    • Killarney Community College · 639 m-1.5% pupils (469)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Council consultation portalsPublic28 Oct 2026, 00:59open
    Council meetings (ModernGov)Public28 Oct 2026, 02:10open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Change of use (22496) approved 2022, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Building work started 28 m away: for how long?
      Ask for: The planning conditions for 25/60970.
      Agent · council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Monearmore
    Electoral division
    Killarney Urban
    Electoral area
    Killarney
    Council
    Kerry County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 22496, approved 2022, not started, runs out 2027.
    • Zoned M2 (major town centre); no vacant land tax.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application refused within 100 m since 2025; latest for change of use (2026).
    • Killarney Mission (bus 300, 722) 201 m away: 1 an hour at morning peak.
    • Here (2022 census): 78% rent (council 24%); 11% of homes empty (council 22%); most built 1991–2000; 29% drive to work (council 62%); population down 3% since 2016.
    • 1 home extension within 250 m since 2025.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
    www2.courts.ie—© the publisher27 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 28 Oct 2026, 06:54 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.