PlanningRegister.ie
Planning report · Kerry County Council · 500 m around the house · the last 12 months · 16 Oct 2026, 00:45

49, 50 Dalton's Avenue, Killarney

52.06448, -9.51164

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2019. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2019.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilcoolaghtBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2019: 19650 · extension, approved2018: 2 files on Kilcoolaght2019: 8 files on Kilcoolaght2021: 2 files on Kilcoolaght2022: 2 files on Kilcoolaght2023: 2 files on Kilcoolaght2025: 2 files on Kilcoolaght2026: 2 files on Kilcoolaght20 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2019
    19650 · extension · approved 2019 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and improve existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

killarney municipal district settlements plan variation 2 kerry cdp 2022 2028 · 19 Jan 2026 – 14 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings20Saint Columbanus's Community Hospital; Saint Finan's Hospital
Monuments6Ritual site - holy well; Burial ground
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 59 on the draft 2027 map; 59 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 90% approved, and 1 in 2 are asked for more information.

Single-storey rear14 decided · more info asked 14%
100% · council 99%
Two-storey rear11 decided · more info asked 9%
100% · council 98%
Attic or dormer11 decided · more info asked 27%
100% · council 94%
First-floor11 decided · more info asked 18%
100% · council 96%
Porch or front11 decided · more info asked 18%
100% · council 97%
New house in a garden or site86 decided · more info asked 50%
90% · council 87%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 144 nearby, 4,345 council-wide

Figure 3

Kilcoolaght, file by file since 2018

9 of 9 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 7.

20 planning files on Kilcoolaght since 2018, by kind and decision.201820192020202120222023202420252026Extensions, atticsNo number · 2018 · two-storey rear · approved · 18416No. 25 · 2019 · other extension · approved · 19121No. 30 · 2019 · rear · approved · 191244No. 1 · 2019 · two-storey rear · approved · 191299No number · 2019 · other extension · approved · 19650No. 36 · 2019 · single-storey side · approved · 19862No. 29 · 2023 · other extension · approved · 23294No. 9 · 2025 · two-storey rear · approved · 2560202No. 5 · 2026 · single-storey side · approved · 2660240Porches, roofs, otherNo number · 2018 · other work · approved · 18301No number · 2019 · other work · approved · 1964No number · 2021 · other work · approved · 211027No number · 2023 · other work · approved · 23264New house in a side gardenNo. 6 · 2019 · new house · approved · 1910036No number · 2019 · new house · refused · 19506No. 6 · 2021 · new house · approved · 219266No number · 2022 · new house · approved · 22227No number · 2022 · new house · refused · 228No number · 2025 · new house · refused · 2560421No. 16 · 2026 · new house · approved · 266011016
ApprovedRefusedWithdrawn or invalid

20 files with "Kilcoolaght" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2018–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Other10—
Single-storey rear11—
Single-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
    National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. 1 in 4 is asked for more information, which adds about 93 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 4): 149 days; Appeal window: 4 weeks; Building starts: 148 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 52–55 (n=112)54 daysIf more info asked (1 in 4)With further information: median 149 days (n=43)149 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 148 days after permission (n=51)148 days after permissionSigned off498 days after the start, for the few who file. 62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated155 decided home extensions, 53 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 13 appealed refusals became permissions. 13 of 54 appealed approvals were reversed.

    Refusals appealed13 decided
    5 became permissions
    Approvals appealed54 decided
    13 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500855 Granted · REAR OF ST MARY TERRACE AND ST MARY ROAD , TOWNLAND OF INCH ,… · 400 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Courts Service legal diary (judicial reviews)© the publisher15 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around 49, 50 Dalton's Avenue, Killarney with 14 numbered planning items
    ⌖ the houseEmpty land zoned for homesApprovedNo decision yet
    1. 10.7 ha zoned for homesEmpty land zoned for homes · 17 m
    2. 20.7 ha zoned for homesEmpty land zoned for homes · 30 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 31 m
    4. 41.8 ha zoned for homesEmpty land zoned for homes · 40 m
    5. 50.1 ha zoned for homesEmpty land zoned for homes · 52 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 67 m
    7. 743 St. Brendan's Place, Killarney 2660570Approved with conditions · 74 m
    8. 843 Marian Terrace, Killarney 2660789No decision yet · 76 m
    9. 920 Kilcoolaght Place, Killarney 2617Approved with conditions · 102 m
    10. 105 Marian Terrace, Kilcoolaght 2660240Approved with conditions · 125 m
    11. 11Rear of 16 St Brendans Place, Kilcoolaght 2660110Approved with conditions · 152 m
    12. 12KILLCOOLAGHT HOUSE, ST ANNES ROAD 2660633No decision yet · 217 m
    13. 13No 12 Lewis Rd, Moyeightragh 2655Approved with conditions · 363 m
    14. 14No.22 O’Sullivan’s Place, Killarney 2560991Approved with conditions · 385 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 115 permissions since 2016, 42 show a start notice and 9 have a completion certificate. Most owners opt out of sign-off.

    132 applications lodged within 500 m. Council: 116 approved, 16 refused. After appeals: 115 approved. Of those: 9 signed off, 22 built with the owner's opt-out, 11 started, 38 with no start notice found, 35 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT116: lodged → approved16: lodged → refused114: approved → approved15: refused → refused2 approved by the council, refused after an appeal1 refused by the council, approved after an appeal38: approved → no start notice found22: approved → built, owner opted out11: approved → started, not signed off9: approved → signed off35: approved → ran out132 lodged132 lodged116 approved116 approved16 refused16 refused115 approved115 approved17 refused17 refused38 no start notice found38 no start notice found22 built, owner opted out22 built, owner opted out11 started, not signed off11 started, not signed off9 signed off9 signed off35 ran out35 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured132 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 10.7 ha zoned for homes · no homes built on it yet · 17 m
      • 20.7 ha zoned for homes · no homes built on it yet · 30 m
      • 30.2 ha zoned for homes · no homes built on it yet · 31 m
      • 41.8 ha zoned for homes · no homes built on it yet · 40 m
      • 50.1 ha zoned for homes · no homes built on it yet · 52 m
      • 60.3 ha zoned for homes · no homes built on it yet · 67 m
      • 0.8 ha zoned for homes · no homes built on it yet · 93 m
      • 0.1 ha zoned for homes · no homes built on it yet · 100 m
      • 0.8 ha zoned for homes · no homes built on it yet · 125 m
      • 0.3 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 8

      Applications within 500 m, by year

      Between 9 and 25 a year; busiest 2019. 88% of decisions were approvals.

      2017: 13, 2018: 19, 2019: 25, 2020: 14, 2021: 9, 2022: 13, 2023: 14, 2024: 10, 2025: 10, 2026: 501020302017: 9 approved2017: 4 refused13’17*2018: 17 approved2018: 2 refused19’182019: 23 approved2019: 2 refused25’192020: 13 approved2020: 1 refused14’202021: 8 approved2021: 1 refused9’212022: 11 approved2022: 2 refused13’222023: 14 approved14’232024: 8 approved2024: 2 refused10’242025: 8 approved2025: 2 refused10’252026: 5 approved5’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 9 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      Building work nearby 4 in the last 12 months
      2 not signed off2 no sign-off needed
      • Millfield, Port Road, Killarney, Kerry · 18 Sept 2026 · 14 homes · start notice not signed off · 24/60295 · 462 m
      • Sunnyhill Lower, Killarney, Kerry · 31 Jul 2026 · 2 homes · 7-day notice not signed off · 25/60040 · 459 m
      • 2 St.Margaret's Road, Killarney, Kerry · 11 May 2026 · 1 homes · start notice, opted out no sign-off needed · 20/639 · 474 m
      • St. Margaret's Road, Killarney, Kerry · 2 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60310 · 460 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 15 Oct 2026, 00:44
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Children's House Montessori, Killarney · Crèche5 Apr 2024 · report · Tusla Early Years Inspectorate200 m
      Holy Cross Mercy Early Years and School Age Service · Crèche3 Mar 2025 · report · Tusla Early Years Inspectorate253 m
      Currow Playschool · Crèche9 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 579 m
      Creative Kids Pre- School & Childcare · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 579 m
      First Step Childcare · Crèche31 Jul 2024 · report · Tusla Early Years Inspectorateapprox. 579 m
      Firies Community Childcare Centre CLG · Crèche10 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 579 m
      Coolick Pre-School · Crèche12 May 2025 · report · Tusla Early Years Inspectorateapprox. 579 m
      Bluebells Preschool & Afterschool · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 579 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Kerry County Council.
      Homes approved
      Here434
      Council middle0
      Homes started
      Here143
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      86% of homes built before 1971 (council 26%). 72% owner-occupied (council 70%).

      Homes built before 1971
      86% · council 26%
      Homes built since 2001
      1% · council 32%
      Owner-occupied
      72% · council 70%
      Rented
      22% · council 24%
      Children under 15
      8% · council 18%
      Aged 65 and over
      28% · council 19%
      Households with 2+ cars
      22% · council 44%
      Work mainly from home
      9% · council 11%
      This small area (142 people)Kerry

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077102012

      Bus
      384 m
      Rock Road · 14, 271, 276 · busiest stop within 500 m: 2 an hour at peak
      Nearest school
      253 m
      Holy Cross Primary School, 345 pupils
      Schools, stops and the council

      Schools

      • Holy Cross Primary School · primary · 345 pupils · 253 m
      • Scoil Mhuire na Mainistreach · primary · 167 pupils · 468 m
      • St. Brendan's College · postprimary · 871 pupils · 493 m
      • Killarney Community College · postprimary · 469 pupils · 568 m
      • St. Brigid's Secondary School · postprimary · 789 pupils · 726 m

      Stops 8

      • Rock Road · 14, 271, 276, 279, 280, 284 · 2/hour at peak · 384 m
      • Rock Road · 14, 271, 276, 279, 280, 284 · 2/hour at peak · 454 m
      • Saint Mary's Cathedral · KY01 · 748 m
      • East Avenue · KY03 · 0/hour at peak · 790 m
      • Killarney Mission · 300, 722 · 1/hour at peak · 792 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Holy Cross Primary School · 253 m-7.5% pupils (345)
      • Scoil Mhuire na Mainistreach · 468 m-13.9% pupils (167)
      • St. Brendan's College · 493 m-0.2% pupils (871)
      • Killarney Community College · 568 m-1.5% pupils (469)
      • St. Brigid's Secondary School · 726 m+2.5% pupils (789)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      Council consultation portalsPublic15 Oct 2026, 01:32open
      Council meetings (ModernGov)Public15 Oct 2026, 01:32open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Extension (19650) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      2. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilcoolaght
      Electoral division
      Killarney Urban
      Electoral area
      Killarney
      Council
      Kerry County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 19650, approved 2019, started, no sign-off needed.
      • Zoned R2 (existing residential); on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Rock Road (bus 14, 271) 384 m away: 2 an hour at morning peak; 4 from all stops within 500 m.
      • Here (2022 census): 72% owner-occupied (council 70%); 24% of homes empty (council 22%); most built 1946–1960; 59% drive to work (council 62%); population down 3% since 2016.
      • 3 home extensions within 250 m since 2026.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 96 in the last year, 13 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.014 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public15 Oct 2026
      www2.courts.ie—© the publisher15 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public15 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.015 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence15 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 16 Oct 2026, 00:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.