Planning report · Cork County Council · 500 m around the house · the last 12 months · 17 Oct 2026, 00:44

Quarter Lane

52.08079, -8.28074

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2006.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 72 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2007.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of RathcormackBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2007: 06/12432 · dwellinghouse, approved2006: 06/11722 · dwellinghouse, withdrawn or invalid2003: 6 files on Rathcormack2004: 6 files on Rathcormack2005: 9 files on Rathcormack2006: 10 files on Rathcormack2007: 14 files on Rathcormack2008: 9 files on Rathcormack2009: 4 files on Rathcormack2010: 5 files on Rathcormack2011: 10 files on Rathcormack2012: 4 files on Rathcormack2013: 1 file on Rathcormack2014: 2 files on Rathcormack2015: 1 file on Rathcormack2016: 4 files on Rathcormack2017: 3 files on Rathcormack2018: 8 files on Rathcormack2019: 2 files on Rathcormack2020: 4 files on Rathcormack2021: 3 files on Rathcormack2022: 1 file on Rathcormack2024: 3 files on Rathcormack2025: 2 files on Rathcormack2026: 2 files on Rathcormack113 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2007
    06/12432 · dwellinghouse · approved 2007 · built? unknown
    approvedstarted?signed off?
  2. 2006
    06/11722 · dwellinghouse · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory1 within 100 m mill (water)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7mill (water); house
Monuments6Graveyard; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 64% approved.

New house in a garden or site22 decided · more info asked 0%
64% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 22 nearby, 8,048 council-wide

Figure 3

Rathcormack, file by file since 2003

13 of 15 decided extensions on the road were approved. New houses in side gardens or on sites: 8 of 13.

113 planning files on Rathcormack since 2003, by kind and decision.200320052007200920112013201520172019202120232025Extensions, atticsNo number · 2003 · other extension · approved · 03/4560No number · 2004 · other extension · approved · 04/6018No number · 2004 · other extension · approved · 04/7650No number · 2005 · other extension · approved · 05/169No. 19 · 2005 · other extension · approved · 05/918No. 1 · 2006 · rear · approved · 06/11095No number · 2006 · other extension · approved · 06/11438No number · 2006 · other extension · undecided · 06/9652No number · 2007 · attic conversion / dormer · undecided · 07/10030No number · 2007 · two-storey rear · undecided · 07/10744No number · 2007 · two-storey rear · undecided · 07/12570No number · 2007 · other extension · approved · 07/6590No number · 2007 · attic conversion / dormer · undecided · 07/9120No number · 2008 · two-storey rear · undecided · 08/10164No number · 2008 · two-storey rear · refused · 08/4698No number · 2008 · two-storey rear · undecided · 08/9684No number · 2009 · two-storey rear · refused · 09/4184No number · 2011 · rear · approved · 11/4451No. 2 · 2016 · attic conversion / dormer · undecided · 16/6899No. 2 · 2016 · attic conversion / dormer · approved · 16/7067No number · 2018 · side · undecided · 18/5933No. 12 · 2018 · other extension · approved · 18/6543No. 91 · 2021 · attic conversion / dormer · approved · 21/5206No. 9 · 2024 · two-storey rear · approved · 24/5244Porches, roofs, otherNo number · 2003 · other work · approved · 03/1060No number · 2003 · other work · undecided · 03/1550No number · 2003 · other work · approved · 03/1612No number · 2003 · other work · approved · 03/2665No number · 2003 · other work · approved · 03/6817No number · 2004 · other work · approved · 04/2036No number · 2004 · other work · approved · 04/5858No number · 2004 · other work · approved · 04/6135No number · 2004 · other work · approved · 04/8952No number · 2005 · other work · approved · 05/1063No number · 2005 · other work · approved · 05/1377No number · 2005 · other work · approved · 05/1548No number · 2005 · other work · approved · 05/3696No number · 2005 · other work · approved · 05/4695No number · 2005 · other work · approved · 05/5047No number · 2005 · other work · approved · 05/9276No number · 2006 · other work · undecided · 06/10396No number · 2006 · other work · approved · 06/12432No number · 2006 · other work · approved · 06/13050No number · 2006 · other work · approved · 06/6570No number · 2006 · other work · approved · 06/8431No number · 2006 · other work · approved · 06/8467No. 9 · 2006 · other work · refused · 06/9867No number · 2007 · other work · approved · 07/11671No number · 2007 · other work · refused · 07/12072No number · 2007 · other work · undecided · 07/8132No number · 2007 · other work · approved · 07/9544No number · 2008 · other work · approved · 08/4177No. 1 · 2008 · other work · undecided · 08/4360No number · 2008 · other work · undecided · 08/6703No number · 2008 · other work · approved · 08/6890No number · 2008 · other work · undecided · 08/7174No number · 2008 · other work · approved · 08/9218No number · 2009 · other work · undecided · 09/4075No number · 2009 · other work · refused · 09/4889No number · 2010 · other work · undecided · 10/4744No number · 2010 · other work · approved · 10/5101No number · 2010 · other work · undecided · 10/5357No number · 2010 · other work · approved · 10/5545No number · 2011 · other work · undecided · 11/4700No number · 2011 · other work · undecided · 11/6410No number · 2012 · other work · undecided · 12/4046No number · 2012 · other work · undecided · 12/4086No number · 2012 · other work · undecided · 12/4213No number · 2012 · other work · approved · 12/4824No number · 2013 · other work · approved · 13/6185No. 2 · 2014 · other work · approved · 14/4295No number · 2015 · other work · approved · 15/6861No number · 2016 · other work · approved · 16/5444No number · 2016 · other work · approved · 16/6369No number · 2017 · other work · refused · 17/4787No number · 2017 · other work · approved · 17/7009No number · 2017 · other work · undecided · 17/7441No number · 2018 · other work · undecided · 18/5055No number · 2018 · other work · undecided · 18/5888No number · 2018 · other work · approved · 18/6184No number · 2018 · other work · approved · 18/6561No. 9 · 2018 · other work · undecided · 18/7041No number · 2018 · other work · undecided · 18/7366No number · 2019 · other work · undecided · 19/4060No number · 2019 · other work · undecided · 19/4159No number · 2020 · other work · approved · 20/4957No number · 2020 · other work · undecided · 20/6069No number · 2020 · other work · approved · 20/6140No number · 2020 · other work · undecided · 20/6462No number · 2021 · other work · undecided · 21/5386No number · 2021 · other work · approved · 21/5740No number · 2022 · other work · refused · 22/4733No number · 2024 · other work · refused · 24/4440No number · 2025 · other work · undecided · 25/5007No number · 2025 · other work · undecided · 25/5199New house in a side gardenNo number · 2007 · new house · approved · 07/11177No number · 2007 · new house · undecided · 07/11597No number · 2007 · new house · refused · 07/12266No. 7 · 2007 · new house · approved · 07/5896No number · 2007 · new house · approved · 07/9281No number · 2009 · new house · refused · 09/6124No number · 2010 · new house · refused · 10/6238No. 1 · 2011 · new house · undecided · 11/43071No. 195 · 2011 · new house · approved · 11/4308No number · 2011 · new house · approved · 11/4428No. 1 · 2011 · new house · undecided · 11/4671No. 1 · 2011 · new house · approved · 11/4948No number · 2011 · new house · undecided · 11/5105No number · 2011 · new house · approved · 11/5282No number · 2014 · new house · undecided · 14/4964No number · 2024 · new house · approved · 24/4978No. 1 · 2026 · new house · refused · 26/17271No. 2 · 2026 · new house · refused · 26/1735
ApprovedRefusedWithdrawn or invalid

113 files with "Rathcormack" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2003–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 72 days.

    Comments open: 5 weeks · €20; Council decision: 72 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 72 days, middle half 55–145 (n=23)72 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated23 decided home extensions, 1 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Quarter Lane with 4 numbered planning items
    ⌖ the houseEmpty land zoned for homesRefusedNo decision yet
    1. 10.2 ha zoned for homesEmpty land zoned for homes · 440 m
    2. 2Site No.1, Rathcormack Village 26/1727Refused · 294 m
    3. 3Site No 2, Rathcormack Village 26/1735Refused · 299 m
    4. 4Main Street, Rathcormac 26/1018No decision yet · 410 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 17 permissions since 2016, 2 show a start notice and 2 have a completion certificate.

    44 applications lodged within 500 m. Council: 17 approved, 7 refused. After appeals: 17 approved. Of those: 2 signed off, 0 built with the owner's opt-out, 0 started, 15 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT17: lodged → approved7: lodged → refused20: lodged → undecided17: approved → approved7: refused → refused20: undecided → undecided15: approved → no start notice found2: approved → signed off44 lodged44 lodged17 approved17 approved7 refused7 refused20 undecided20 undecided17 approved17 approved7 refused7 refused20 undecided20 undecided15 no start notice found15 no start notice found2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured44 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 10.2 ha zoned for homes · no homes built on it yet · 440 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 23:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 7

      Applications within 500 m, by year

      Between 1 and 12 a year; busiest 2018. 71% of decisions were approvals.

      2016: 2, 2017: 3, 2018: 12, 2019: 5, 2020: 4, 2021: 4, 2022: 1, 2023: 2, 2024: 3, 2025: 4, 2026: 4051015202016: 1 approved2016: 1 undecided2’16*2017: 1 approved2017: 1 refused2017: 1 undecided3’172018: 5 approved2018: 7 undecided12’182019: 2 refused2019: 3 undecided5’192020: 2 approved2020: 2 undecided4’202021: 3 approved2021: 1 undecided4’212022: 1 refused1’222023: 2 approved2’232024: 1 approved2024: 1 refused2024: 1 undecided3’242025: 2 approved2025: 2 undecided4’252026: 2 refused2026: 2 undecided4’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 4 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 23:06
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Building work nearby 2 in the last 12 months
      1 not signed off1 no sign-off needed
      • Main Street, Rathcormac, Cork, P61YT73 · 30 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/05500 · 446 m
      • Rovers Rest, Main Street, Fermoy, Cork, P61 TW84 · 17 Dec 2025 · 8 homes · 7-day notice not signed off · 401 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here145
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 23:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      64% owner-occupied (council 73%).

      Homes built before 1971
      27% · council 28%
      Homes built since 2001
      51% · council 36%
      Owner-occupied
      64% · council 73%
      Rented
      30% · council 22%
      Children under 15
      23% · council 21%
      Aged 65 and over
      11% · council 16%
      Households with 2+ cars
      34% · council 52%
      Work mainly from home
      6% · council 12%
      This small area (182 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047278006

      Bus
      289 m
      Rathcormac · 245 · busiest stop within 500 m: 2 an hour at peak
      Nearest school
      416 m
      Rathcormac NS, 432 pupils
      Schools, stops and the council

      Schools

      • Rathcormac NS · primary · 432 pupils · 416 m

      Stops 4

      • Rathcormac · 245 · 1/hour at peak · 289 m
      • Rathcormac · 245 · 2/hour at peak · 321 m
      • Riversdale · 245 · 1/hour at peak · 666 m
      • Riversdale · 245 · 2/hour at peak · 724 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Rathcormac NS · 416 m+1.4% pupils (432) · an extension 2024, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Council consultation portalsPublic16 Oct 2026, 01:34open
      Council meetings (ModernGov)Public16 Oct 2026, 01:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Dwellinghouse (06/12432) approved 2007: built as approved?
        Ask for: The grant and an opinion of compliance.
        Seller · solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Rathcormack
      Electoral division
      Rathcormack
      Electoral area
      Fermoy
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 06/12432, approved 2007, built? unknown.
      • Zoned R2 (existing residential); no vacant land tax.
      • Flood Zone A 3 m away on the Cork County Development Plan 2022-2028 flood map.
      • 1 site nearby could change: 1 empty zoned plot.
      • Rathcormac (bus 245) 321 m away: 2 an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 64% owner-occupied (council 73%); 13% of homes empty (council 13%); most built 2001–2010; 65% drive to work (council 66%); population up 11% since 2016.
      • The council decides in a median 66 days (about 9 weeks).
      • Homes started within 1 km: 9 in the last year, 95 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
      www2.courts.ie—© the publisher16 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      services-eu1.arcgis.com—CC BY 4.0—
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 17 Oct 2026, 00:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.