PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 01:27

Mallow

52.12800, -8.65372

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (100%).

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 56 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallydahinBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 6 files on Ballydahin2022: 3 files on Ballydahin2023: 3 files on Ballydahin2024: 4 files on Ballydahin2025: 2 files on Ballydahin2026: 1 file on Ballydahin19 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Micam Limited (285 m); Magh nAla Limited (Quartertown) (728 m); Road Binders Limited (842 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings6Saint Gobnait's Cemetery; house
Monuments1Railway bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 75% approved.

Single-storey rear10 decided · more info asked 0%
100% · council 100%
New house in a garden or site12 decided · more info asked 0%
75% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 22 nearby, 5,053 council-wide

Figure 3

Ballydahin, file by file since 2021

5 of 5 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

19 planning files on Ballydahin since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 8 · 2021 · rear · approved · 21/4287No. 55 · 2021 · side · undecided · 21/5900No. 55 · 2021 · other extension · approved · 21/6210No. 16 · 2023 · other extension · approved · 23/4516No. 25 · 2024 · single-storey rear · approved · 24/4795No. 18 · 2025 · attic conversion / dormer · undecided · 25/6738No. 42 · 2026 · porch / front · approved · 26/1306Porches, roofs, otherNo number · 2021 · other work · undecided · 21/5741No number · 2021 · other work · approved · 21/6442No number · 2021 · other work · approved · 21/7468No. 53 · 2022 · other work · approved · 22/5202No. 8 · 2022 · other work · approved · 22/6765No number · 2023 · other work · undecided · 23/4805No number · 2023 · other work · refused · 23/5097No. 6 · 2024 · other work · undecided · 24/4035No. 6 · 2024 · other work · undecided · 24/4314No. 25 · 2024 · other work · approved · 24/5590New house in a side gardenNo. 6 · 2022 · new house · approved · 22/67576No. 5 · 2025 · new house · approved · 25/46885
ApprovedRefusedWithdrawn or invalid

19 files with "Ballydahin" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 56 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 56 days; Appeal window: 4 weeks; Building starts: 101 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 56 days, middle half 53–102 (n=40)56 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 101 days after permission (n=11)101 days after permissionSigned off45% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated40 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Mallow with 4 numbered planning items
    ⌖ the houseWindow closingNo decision yetApproved
    1. 1Cork Road, Gooldshill 26/2235Approved with conditions · 374 m
    2. 218 Dromore Drive, Ballydahin 25/6738No decision yet · 289 m
    3. 3Albany, 50 Cork Road 26/0867Approved with conditions · 319 m
    4. 442, Dromore Drive 26/1306Approved with conditions · 321 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 19 permissions since 2016, 3 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    29 applications lodged within 500 m. Council: 19 approved, 1 refused. After appeals: 19 approved. Of those: 0 signed off, 3 built with the owner's opt-out, 0 started, 16 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT19: lodged → approved1: lodged → refused9: lodged → undecided19: approved → approved1: refused → refused9: undecided → undecided16: approved → no start notice found3: approved → built, owner opted out29 lodged29 lodged19 approved19 approved1 refused1 refused9 undecided9 undecided19 approved19 approved1 refused1 refused9 undecided9 undecided16 no start notice found16 no start notice found3 built, owner opted out3 built, owner opted out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured29 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 18 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-18 26/2235: Grant with Conditions — Permission for the following works to existing dwelling:- (1) Demolition and reconstruction of the existing front porch,today6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec26/2235: Grant with Conditions — Permission for the following works to existing dwelling:- (1) Demolition and reconstruction of the existing front porch, · 374 m away · 2026-11-18
    Time to appeal ends
    • Time to appeal ends 18 Nov 202617 days left
      126/2235 · Grant with Conditions — Permission for the following works to existing dwelling:- (1) Demolition and reconstruction of…
      €220 to An Coimisiún Pleanála (€110 observer) · 374 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 2 and 6 a year; busiest 2023. 95% of decisions were approvals.

    2021: 7, 2022: 4, 2023: 6, 2024: 5, 2025: 2, 2026: 505102021: 5 approved2021: 2 undecided7’21*2022: 3 approved2022: 1 undecided4’222023: 4 approved2023: 1 refused2023: 1 undecided6’232024: 3 approved2024: 2 undecided5’242025: 1 approved2025: 1 undecided2’252026: 3 approved2026: 2 undecided5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • 50 Bóthar Chorcaí, Mallow, Cork, P51 X62N · 20 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 26/0867 · 350 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here52
    Council middle0
    Homes started
    Here55
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    3% of homes built before 1971 (council 28%). 62% owner-occupied (council 73%).

    Homes built before 1971
    3% · council 28%
    Homes built since 2001
    20% · council 36%
    Owner-occupied
    62% · council 73%
    Rented
    29% · council 22%
    Children under 15
    13% · council 21%
    Aged 65 and over
    29% · council 16%
    Households with 2+ cars
    27% · council 52%
    Work mainly from home
    6% · council 12%
    This small area (340 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047246002

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    576 m
    Ballydahin · 243, 519
    Nearest school
    573 m
    Scoil Ghobnatan, 470 pupils
    Schools, stops and the council

    Schools

    • Scoil Ghobnatan · primary · 470 pupils · 573 m
    • Gael Scoil Thomais Daibhis · primary · 412 pupils · 808 m
    • Davis College · postprimary · 1033 pupils · 904 m

    Stops 1

    • Ballydahin · 243, 519 · 1/hour at peak · 576 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Ghobnatan · 573 m-5.4% pupils (470)
    • Gael Scoil Thomais Daibhis · 808 m+0.7% pupils (412)
    • Davis College · 904 m+2.3% pupils (1,033)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 01:08
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballydahin
    Electoral division
    Mallow South Urban
    Electoral area
    Mallow
    Council
    Cork County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); no vacant land tax.
    • Nothing nearby looks set to change.
    • No morning-peak service within 500 m; nearest is Ballydahin, 576 m away (1 an hour).
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 62% owner-occupied (council 73%); 2% of homes empty (council 13%); most built 1971–1980; 61% drive to work (council 66%); population up 5% since 2016.
    • The council decides in a median 67 days (about 10 weeks).
    • 6 applications nearby in the last 12 months.
    • 55 homes started within 1 km in 3 years (council middle 1).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 01:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.