Planning report · Waterford City And County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 05:03

Carrigeenlea

52.14928, -7.16760

Homes here mostly date from the 2000s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (99%). 83 homes approved 119 m away haven't started.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 3 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of NewtownBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2025: 2560441 · new house, approved2025: 2560429 · new house, withdrawn or invalid2025: 2460566 · attic or dormer, approved2021: 3 files on Newtown2022: 3 files on Newtown2024: 4 files on Newtown2025: 14 files on Newtown2026: 2 files on Newtown26 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2560441 · new house · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  2. 2025
    2560429 · new house · withdrawn
    approved?started?signed off?
  3. 2025
    2460566 · attic or dormer · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

R1: Provide for new residential development in tandem with the provision of the necessary social and physical infrastructure.

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Newtown House
Monuments1R131665
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 340 on the draft 2027 map; 340 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 96% approved, and 1 in 2 are asked for more information.

Single-storey rear16 decided · more info asked 6%
100% · council 99%
Attic or dormer13 decided · more info asked 15%
100% · council 92%
New house in a garden or site23 decided · more info asked 65%
96% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 52 nearby, 1,528 council-wide

Figure 3

Newtown, file by file since 2021

6 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

26 planning files on Newtown since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2024 · attic conversion / dormer · approved · 2460147No. 79 · 2025 · two-storey side · approved · 2560183No. 9 · 2025 · single-storey side · approved · 2560207No number · 2025 · attic conversion / dormer · approved · 2560419No. 75 · 2025 · single-storey rear · approved · 2560423No. 14 · 2025 · single-storey rear · approved · 2560877Porches, roofs, otherNo number · 2021 · other work · refused · 211201No number · 2021 · other work · approved · 21782No number · 2021 · other work · approved · 21836No number · 2022 · other work · approved · 22398No. 3 · 2022 · other work · approved · 22833No number · 2024 · other work · refused · 2460108No number · 2024 · other work · refused · 2460330No number · 2024 · other work · approved · 2460566No number · 2025 · new house · approved · 2560111No number · 2025 · other work · approved · 2560384No number · 2025 · other work · approved · 2560441No number · 2025 · other work · approved · 2560457No number · 2025 · other work · approved · 2560468No number · 2025 · other work · approved · 2560470No number · 2025 · other work · approved · 2560800No number · 2025 · other work · approved · 2560883No number · 2026 · other work · approved · 2660046No number · 2026 · other work · approved · 2660197New house in a side gardenNo. 3 · 2022 · new house · approved · 222293No. 10 · 2025 · new house · approved · 256067510
ApprovedRefusedWithdrawn or invalid

26 files with "Newtown" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 6 is asked for more information, which adds about 99 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 6): 153 days; Appeal window: 4 weeks; Building starts: 113 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 50–53 (n=59)51 daysIf more info asked (1 in 6)With further information: median 153 days (n=11)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 113 days after permission (n=19)113 days after permissionSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated70 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed refusals became permissions. 0 of 3 appealed approvals were reversed.

    Refusals appealed2 decided
    0 became permissions
    Approvals appealed3 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501829 Pending · Newtown Practice Range , Newtown Tramore , Co. Waterford, X91 Y685 · 272 m
    • 500894 Open · Newtown Park , Newtown Tramore , Co. Waterford · 352 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Carrigeenlea with 12 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesBuilding startedApprovedNo decision yet
    1. 1Newtown 2460566Approved, no sign building has started · 32 m
    2. 2Newtown 2560468Approved, no sign building has started · 120 m
    3. 30.1 ha zoned for homesEmpty land zoned for homes · 16 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 77 m
    5. 50.8 ha zoned for homesEmpty land zoned for homes · 97 m
    6. 6Newtown Glen, Tramore 2460147Building started · 162 m
    7. 72.9 ha zoned for homesEmpty land zoned for homes · 0 m
    8. 8Newtown, Tramore 2560883Approved with conditions · 39 m
    9. 9Newtown, Tramore 2660046Approved with conditions · 59 m
    10. 10Cliff Road, Tramore 2660385No decision yet · 267 m
    11. 11Newtown Practice Range, Newtown Tramore 2560800Approved with conditions · 272 m
    12. 1215 Cliffside, Newrtown Glen 2660045Approved with conditions · 458 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 39 permissions since 2016, 8 show a start notice and 4 have a completion certificate.

    40 applications lodged within 500 m. Council: 39 approved, 1 refused. After appeals: 39 approved. Of those: 4 signed off, 2 built with the owner's opt-out, 2 started, 31 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT39: lodged → approved1: lodged → refused39: approved → approved1: refused → refused31: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off4: approved → signed off40 lodged40 lodged39 approved39 approved1 refused1 refused39 approved39 approved1 refused1 refused31 no start notice found31 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off4 signed off4 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured40 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      83 homes 119 m away were approved Apr 2026 with no start notice yet; the permission runs to Apr 2031.

      Newtown · 83 homes: 83 homes approved Apr 2026, not started; Newtown · 24 homes: 24 homes approved Apr 2025, not started202420252026202720282029203020312032Newtown · 83 homes119 m · 256046883 homes approved Apr 2026, not started83 homes approved Apr 2026, not startedNewtown · 24 homes32 m · 246056624 homes approved Apr 2025, not started24 homes approved Apr 2025, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 6 within 500 m

      Approved, not started 2

      • Newtown · 24 homes approved Apr 2025, not started · 32 m
      • Newtown · 83 homes approved Apr 2026, not started · 119 m

      Empty land zoned for homes 4

      • 30.1 ha zoned for homes · no homes built on it yet · 16 m
      • 40.1 ha zoned for homes · no homes built on it yet · 77 m
      • 50.8 ha zoned for homes · no homes built on it yet · 97 m
      • 72.9 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 3 and 17 a year; busiest 2025. 98% of decisions were approvals.

      2021: 4, 2022: 3, 2023: 6, 2024: 7, 2025: 17, 2026: 3051015202021: 4 approved4’21*2022: 3 approved3’222023: 6 approved6’232024: 6 approved2024: 1 refused7’242025: 17 approved17’252026: 3 approved3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 7 in the last 12 months

      See every application on the map

      • 10Cliff Road , Tramore , Co. Waterford No decision yet
        is sought for the subdivision of existing site to allow for 2no. additional residential sites, new access…
        26603852 Jun 2026267 m
      • Newtown , Tramore , Co. Waterford Approved with conditions
        is sought for elevation changes to house type C on 4no sites at the previously approved residential…
        266019720 May 2026181 m
      • Newtown , Tramore , Co. Waterford Withdrawn or not valid
        is sought for elevation changes to house type C on 4no. sites at the previously approved residential…
        266018524 Mar 2026181 m
      • 1215 Cliffside , Newrtown Glen , Tramore Approved with conditions
        detached single storey garage to the rear of the dwelling house and associate site works
        266004520 Mar 20261 homes458 m
      • 9Newtown , Tramore , Co. Waterford Approved with conditions
        elevation changes to house type C on 6no. sites at the previously approved residential development under…
        266004620 Mar 20261 homes59 m
      • 8Newtown , Tramore , Co. Waterford Approved with conditions
        change to a new two storey house type at sites no. 48, 49, 50 & 51, this application is a modification to…
        25608836 Feb 20261 homes39 m
      • 11Newtown Practice Range , Newtown Tramore , Co. Waterford Approved with conditions
        2 no. outdoor padel courts on the grounds . These courts consist of a playing court surface enclosed with…
        25608008 Jul 2026272 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 3 in the last 12 months
      1 signed off as finished1 not signed off1 no sign-off needed
      • 6Newtown Glen, Tramore, Waterford · 4 Nov 2026 · 10 homes · start notice not signed off · 2460147 · 162 m
      • Lodges Lane, Tramore, Waterford, X91 P2D3 · 8 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/136 · 477 m
      • Newtown Glen, Tramore, Waterford · 8 Dec 2025 · 21 homes · start notice signed off · 2460147 · 202 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 107 not started
      • 2Newtown · 83 homes · not started · runs out 15 Apr 2031 · 120 m
      • Newtown Park · 37 homes · under appeal · runs out 20 Feb 2031 · 372 m
      • 1Newtown · 24 homes · not started · runs out 24 Apr 2030 · 32 m
      • Newtown · 24 homes · building started · 91 m
      • Cliffside · 24 homes · building started · 494 m
      • Newtown · 21 homes · building started · 270 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Bizzykids Ltd · Crèche30 Jul 2025 · report · Tusla Early Years Inspectorateapprox. 96 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Waterford City and County Council.
      Homes approved
      Here165
      Council middle0
      Homes started
      Here120
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      4% of homes built before 1971 (council 29%). 89% owner-occupied (council 65%).

      Homes built before 1971
      4% · council 29%
      Homes built since 2001
      86% · council 30%
      Owner-occupied
      89% · council 65%
      Rented
      7% · council 29%
      Children under 15
      28% · council 19%
      Aged 65 and over
      5% · council 17%
      Households with 2+ cars
      74% · council 41%
      Work mainly from home
      14% · council 11%
      This small area (377 people)Waterford City And

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 227049005

      Bus
      563 m
      Newtown Hill · 358, 360
      Schools, stops and the council

      Schools

      None nearby.

        Stops 6

        • Newtown Hill · 358, 360 · 3/hour at peak · 563 m
        • Newtown Hill · 358, 360 · 3/hour at peak · 574 m
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        Council consultation portalsPublic1 Nov 2026, 01:08open
        Council meetings (ModernGov)Public1 Nov 2026, 02:24open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. New house (2560441) approved 2025, not started: still planned?
          Ask for: The grant, and whether it stays with the house.
          Seller · solicitor
        2. Attic or dormer (2460566) approved 2025, not started: still planned?
          Ask for: The grant, and whether it stays with the house.
          Seller · solicitor
        3. On the vacant land tax map: is the 3% tax being paid?
          Ask for: Your solicitor's check of liability or exemption.
          Solicitor
        4. 24 homes approved 32 m away (Newtown), not started: what is planned?
          Ask for: The planning file for 2460566.
          Council
        5. 83 homes approved 119 m away (Newtown), not started: what is planned?
          Ask for: The planning file for 2560468.
          Council
        6. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Newtown
        Electoral division
        Islandikane
        Electoral area
        Tramore-Waterford City West
        Council
        Waterford City And County Council
        Everything we found, as a list 8 lines
        • 3 applications on this site; latest 2560441, approved 2025, not started, runs out 2030.
        • Zoned R1 (new residential); not protected; on the vacant land tax map.
        • 6 sites nearby could change: 2 approved schemes, 4 empty zoned plots.
        • 107 homes approved nearby, not started; largest 83 at Newtown.
        • No morning-peak service within 500 m; nearest is Newtown Hill, 562 m away (3 an hour).
        • Here (2022 census): 89% owner-occupied (council 65%); 7% of homes empty (council 11%); most built 2001–2010; 78% drive to work (council 63%); population up 30% since 2016.
        • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
        • Homes started within 1 km: 23 in the last year, 28 three years before.
        What the terms mean 6 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 26
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
        www2.courts.ie—© the publisher31 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 1 Nov 2026, 05:03 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.