Planning report · Waterford City And County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 19:58

Bayview

52.15936, -7.00155

Homes here mostly date from after 2016. 1 planning file on this house, the latest from 2022. Home extensions nearby almost always get approved (93%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online. 1 planning file on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DunmoreBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2022: 2221 · attic or dormer, approved2021: 12 files on Dunmore2022: 12 files on Dunmore2023: 8 files on Dunmore2024: 5 files on Dunmore2025: 8 files on Dunmore2026: 4 files on Dunmore49 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    2221 · attic or dormer · approved 2022 · not started, runs out 2027
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RS: Provide for residential development and protect and improve residential amenity.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments1R133608
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 205 on the draft 2027 map; 205 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–94% by type. A new house in a garden is harder: 65% approved, and 1 in 2 are asked for more information.

Single-storey rear15 decided · more info asked 7%
93% · council 99%
Attic or dormer18 decided · more info asked 22%
94% · council 92%
New house in a garden or site17 decided · more info asked 59%
65% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 50 nearby, 1,528 council-wide

Figure 3

Dunmore, file by file since 2021

29 of 31 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 6.

49 planning files on Dunmore since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 10 · 2021 · single-storey rear · approved · 211028No number · 2021 · single-storey side · approved · 211043No. 5 · 2021 · attic conversion / dormer · approved · 21115No. 11B · 2021 · attic conversion / dormer · approved · 211232No number · 2021 · other extension · refused · 21188No. 2 · 2021 · attic conversion / dormer · approved · 21410No. 13 · 2021 · porch / front · approved · 21493No. 01 · 2021 · single-storey rear · approved · 21873No. 3 · 2022 · attic conversion / dormer · approved · 221022No number · 2022 · single-storey side · approved · 221037No. 29A · 2022 · attic conversion / dormer · approved · 22108No number · 2022 · single-storey rear · approved · 22203No. 25 · 2022 · other extension · approved · 2221No number · 2022 · two-storey side · approved · 22227No. 5 · 2022 · two-storey rear · approved · 2244No. 11 · 2023 · single-storey rear · approved · 2360068No. 35 · 2023 · single-storey rear · approved · 2360071No. 1 · 2023 · rear · approved · 2360243No. 8 · 2023 · single-storey rear · approved · 2360300No number · 2023 · single-storey rear · approved · 2360386No number · 2023 · attic conversion / dormer · approved · 2360545No. 2 · 2023 · single-storey rear · approved · 2360606No. 3 · 2024 · porch / front · approved · 2460473No. 38A · 2025 · attic conversion / dormer · approved · 2560246No. 3 · 2025 · two-storey rear · approved · 2560349No number · 2025 · attic conversion / dormer · approved · 2560680No. 12 · 2025 · first-floor · approved · 2560843No. 13 · 2025 · porch / front · approved · 2560860No number · 2026 · attic conversion / dormer · refused · 2649No number · 2026 · garage conversion · approved · 2660068No. 2 · 2026 · single-storey rear · approved · 2660179Porches, roofs, otherNo. 16 · 2021 · other work · approved · 211027No number · 2021 · other work · approved · 211133No. 25 · 2021 · other work · approved · 211180No. 395 · 2021 · other work · refused · 21463No number · 2022 · other work · approved · 22160No number · 2022 · other work · refused · 2252No. 18 · 2022 · other work · approved · 2260002No number · 2022 · other work · approved · 22759No number · 2022 · other work · approved · 22891No. 6 · 2024 · other work · approved · 2460094No number · 2024 · other work · approved · 2460772No. 14 · 2025 · other work · approved · 2560847New house in a side gardenNo number · 2023 · new house · refused · 2360321No number · 2024 · new house · refused · 2460127No number · 2024 · new house · refused · 2460813No number · 2025 · new house · approved · 2560337No number · 2025 · new house · refused · 2560751No number · 2026 · new house · approved · 2660249
ApprovedRefusedWithdrawn or invalid

49 files with "Dunmore" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 7 within 250 m · 0 refused within 100 m

Extensions and refusals near you 7 extensions within 250 m · the last 12 months

1 approved1 refused5 no decision or withdrawn
KindAppliedApprovedRefused
First-floor21—
Single-storey rear20—
Dormer or attic101
Rear10—
Single-storey side10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 4 is asked for more information, which adds about 63 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 4): 114 days; Appeal window: 4 weeks; Building starts: 161 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–54 (n=56)53 daysIf more info asked (1 in 4)With further information: median 114 days (n=18)114 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 161 days after permission (n=29)161 days after permissionSigned off76% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated74 decided home extensions, 29 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 4 appealed refusals became permissions. 1 of 9 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed9 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Bayview with 15 numbered planning items
    ⌖ the houseOpen for commentsRefusedEmpty land zoned for homesBuilding startedNo decision yetApproved
    1. 1Killea, Dunmore East 26103No decision yet · 157 m
    2. 2Fairwinds, Killea Road 2649Refused · 152 m
    3. 30.6 ha zoned for homesEmpty land zoned for homes · 49 m
    4. 41.1 ha zoned for homesEmpty land zoned for homes · 64 m
    5. 50.1 ha zoned for homesEmpty land zoned for homes · 88 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 109 m
    7. 71.9 ha zoned for homesEmpty land zoned for homes · 119 m
    8. 80.9 ha zoned for homesEmpty land zoned for homes · 136 m
    9. 912 Killea Road, Dunmore East 2560843Building started · 138 m
    10. 1018 Dunmore Villas, Dunmore East 2660723No decision yet · 190 m
    11. 11Ballymabin, Dunmore East 2660249Approved with conditions · 200 m
    12. 1216 Dunmore holiday villas, Dunmore East 2660715No decision yet · 213 m
    13. 1314 Dunmore Holiday Villas, Dunmore East 2560847Approved with conditions · 235 m
    14. 14'The Stilt House'', Ballymabin 2660068Approved with conditions · 281 m
    15. 152 Marian Terrace, Dunmore East 2660179Approved with conditions · 452 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 31 permissions since 2016, 7 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    40 applications lodged within 500 m. Council: 33 approved, 7 refused. After appeals: 31 approved. Of those: 0 signed off, 4 built with the owner's opt-out, 3 started, 21 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved7: lodged → refused31: approved → approved7: refused → refused2 approved by the council, withdrawn or invalid after an appeal21: approved → no start notice found4: approved → built, owner opted out3: approved → started, not signed off3: approved → ran out40 lodged40 lodged33 approved33 approved7 refused7 refused31 approved31 approved7 refused7 refused2 withdrawn2 withdrawn21 no start notice found21 no start notice found4 built, owner opted out4 built, owner opted out3 started, not signed off3 started, not signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured40 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 2 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-02 26103: application received — of 211133 for the construction of 99 no. dwelling (various types and sizes). The proposed development will include new vtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec26103: application received — of 211133 for the construction of 99 no. dwelling (various types and sizes). The proposed development will include new v · 157 m away · 2026-11-02
    Comments close
    • Comments close 2 Nov 20261 day left
      126103 · application received — of 211133 for the construction of 99 no. dwelling (various types and sizes). The proposed…
      €20 to the council · 157 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 9 within 500 m

    Empty land zoned for homes 9

    • 30.6 ha zoned for homes · no homes built on it yet · 49 m
    • 41.1 ha zoned for homes · no homes built on it yet · 64 m
    • 50.1 ha zoned for homes · no homes built on it yet · 88 m
    • 60.3 ha zoned for homes · no homes built on it yet · 109 m
    • 71.9 ha zoned for homes · no homes built on it yet · 119 m
    • 80.9 ha zoned for homes · no homes built on it yet · 136 m
    • 0.2 ha zoned for homes · no homes built on it yet · 155 m
    • 2.0 ha zoned for homes · no homes built on it yet · 155 m
    • 2.3 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 4 and 8 a year; busiest 2022. 83% of decisions were approvals.

    2021: 12, 2022: 8, 2023: 6, 2024: 4, 2025: 6, 2026: 4051015202021: 11 approved2021: 1 refused12’21*2022: 7 approved2022: 1 refused8’222023: 5 approved2023: 1 refused6’232024: 2 approved2024: 2 refused4’242025: 5 approved2025: 1 refused6’252026: 3 approved2026: 1 refused4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Killea , Dunmore East , Co. Waterford comments close 2 Nov 2026
      of 211133 for the construction of 99 no. dwelling (various types and sizes). The proposed development will…
      2610328 Sept 2026157 m
    Every application within 500 m 15 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 4 in the last 12 months
    1 not signed off3 no sign-off needed
    • 2 Marian Terrace, Dunmore East, Waterford, X91 XA99 · 8 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2660179 · 482 m
    • 2 Marian Terrace, Dunmore East, Waterford · 8 Oct 2026 · short notice no sign-off needed · 2660179 · 482 m
    • Lower Dunmore, Dunmore East, Waterford · 15 Sept 2026 · 1 homes · start notice not signed off · 2560680 · 386 m
    • 912 Killea Road, Dunmore East, Waterford, X91 R3P9 · 22 Aug 2026 · 1 homes · short notice no sign-off needed · 2560843 · 138 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • Killea · 99 homes · building started · 274 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area Busier than most of Waterford City and County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here77
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    16% of homes built before 1971 (council 29%). 72% owner-occupied (council 65%).

    Homes built before 1971
    16% · council 29%
    Homes built since 2001
    39% · council 30%
    Owner-occupied
    72% · council 65%
    Rented
    22% · council 29%
    Children under 15
    20% · council 19%
    Aged 65 and over
    17% · council 17%
    Households with 2+ cars
    51% · council 41%
    Work mainly from home
    18% · council 11%
    This small area (294 people)Waterford City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 227054007

    Bus
    356 m
    Killea · 358 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    694 m
    Réalt na Mara National School, 196 pupils
    Schools, stops and the council

    Schools

    • Réalt na Mara National School · primary · 196 pupils · 694 m

    Stops 8

    • Killea · 358 · 0/hour at peak · 356 m
    • Killea · 358 · 0/hour at peak · 362 m
    • Horsequarter · 354 · 1/hour at peak · 443 m
    • Horsequarter · 354 · 1/hour at peak · 491 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Réalt na Mara National School · 694 m-2% pupils (196)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Attic or dormer (2221) approved 2022, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    3. Application 157 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Dunmore
    Electoral division
    Killea
    Electoral area
    Waterford City East
    Council
    Waterford City And County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2221, approved 2022, not started, runs out 2027.
    • Zoned R2 (existing residential); not protected; on the vacant land tax map.
    • 9 sites nearby could change: 9 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 2 Nov 2026.
    • Horsequarter (bus 354) 443 m away: 11 a day, fewer than one an hour at morning peak; 2 from all stops within 500 m.
    • Here (2022 census): 72% owner-occupied (council 65%); 38% of homes empty (council 11%); most built 2016 or later; 61% drive to work (council 63%); population up 5% since 2016.
    • 7 home extensions within 250 m since 2025. Most were first-floor extensions. 1 dormer or attic conversion refused.
    • The council decides in a median 56 days (about 8 weeks); 40% are asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 24
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 19:58 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.