Planning report · Waterford City And County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 00:03

Crobally Heights

52.16978, -7.15366

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (95%). 12 homes approved 345 m away haven't started.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Crobally UpperBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 2 files on Crobally Upper2022: 5 files on Crobally Upper2023: 3 files on Crobally Upper2024: 1 file on Crobally Upper2026: 1 file on Crobally Upper12 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RS: Provide for residential development and protect and improve residential amenity.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2Convent of the Star of the Sea; Saint Otteran's Christian Schools
Monuments4R131847; R188517
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 807 on the draft 2027 map; 807 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 83% approved, and 1 in 2 are asked for more information.

Single-storey rear17 decided · more info asked 24%
100% · council 99%
Attic or dormer24 decided · more info asked 25%
96% · council 92%
First-floor14 decided · more info asked 29%
93% · council 94%
New house in a garden or site30 decided · more info asked 60%
83% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 85 nearby, 1,637 council-wide

Figure 3

Crobally Upper, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

12 planning files on Crobally Upper since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2022 · attic conversion / dormer · approved · 221034No number · 2022 · single-storey rear · approved · 22837No. 3 · 2026 · rear · approved · 2617Porches, roofs, otherNo number · 2021 · other work · approved · 21807No number · 2022 · other work · approved · 22116No. 22 · 2022 · other work · approved · 22548No number · 2023 · other work · approved · 23107No. 18 · 2023 · other work · approved · 23204No. 29 · 2023 · other work · approved · 2360319No number · 2024 · other work · approved · 2460482New house in a side gardenNo. 7 · 2021 · new house · refused · 216707No. 7 · 2022 · new house · approved · 229827
ApprovedRefusedWithdrawn or invalid

12 files with "Crobally Upper" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
First-floor11—
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 5 is asked for more information, which adds about 92 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 5): 144 days; Appeal window: 4 weeks; Building starts: 115 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 50–53 (n=85)51 daysIf more info asked (1 in 5)With further information: median 144 days (n=22)144 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 115 days after permission (n=39)115 days after permissionSigned off82% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated107 decided home extensions, 39 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 6 appealed refusals became permissions. 2 of 12 appealed approvals were reversed.

    Refusals appealed6 decided
    3 became permissions
    Approvals appealed12 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Crobally Heights with 12 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1South-eastern corner of Waterford & Tramore Racecourse in the Townland of Crobally Upper, at the roundabout between Old Waterford Road and the R675 Tramore Ring Road 2660800No decision yet · 359 m
    2. 2Tramore CBS Site 2660404Approved, no sign building has started · 345 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 64 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 65 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 83 m
    6. 63 Crobally Upper, Tankfield 2617Approved with conditions · 206 m
    7. 722 Kennedy Park, Tramore 2664Approved with conditions · 245 m
    8. 84 Springmount, Tramore 2560933Approved with conditions · 284 m
    9. 925 Oak Drive, Monvoy Valley 2660485Approved with conditions · 299 m
    10. 10Old Waterford Road / Convent Hill, Tramore 2560895No decision yet · 407 m
    11. 11Old Waterford Road / Convent Hill, Tramore 2560910No decision yet · 409 m
    12. 12Waterford Road, Tramore 2660195Approved with conditions · 426 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 33 permissions since 2016, 9 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    36 applications lodged within 500 m. Council: 33 approved, 3 refused. After appeals: 33 approved. Of those: 2 signed off, 6 built with the owner's opt-out, 1 started, 23 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved3: lodged → refused33: approved → approved3: refused → refused23: approved → no start notice found6: approved → built, owner opted out1: approved → started, not signed off2: approved → signed off1: approved → ran out36 lodged36 lodged33 approved33 approved3 refused3 refused33 approved33 approved3 refused3 refused23 no start notice found23 no start notice found6 built, owner opted out6 built, owner opted out1 started, not signed off1 started, not signed off2 signed off2 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured36 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 23 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-23 2660800: application received — Installation of a new booster pumping station and all associated assets below: • Concrete plinth and above ground kiotoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660800: application received — Installation of a new booster pumping station and all associated assets below: • Concrete plinth and above ground kio · 359 m away · 2026-11-23
    Comments close
    • Comments close 23 Nov 202622 days left
      12660800 · application received — Installation of a new booster pumping station and all associated assets below: • Concrete plinth…
      €20 to the council · 359 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    12 homes 345 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Tramore CBS Site · 12 homes: 12 homes approved Oct 2026, not started202420252026202720282029203020312032Tramore CBS Site · 12 homes345 m · 266040412 homes approved Oct 2026, not started12 homes approved Oct 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 500 m

    Approved, not started 1

    Empty land zoned for homes 3

    • 30.2 ha zoned for homes · no homes built on it yet · 64 m
    • 40.1 ha zoned for homes · no homes built on it yet · 65 m
    • 50.2 ha zoned for homes · no homes built on it yet · 83 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 4 and 9 a year; busiest 2022. 92% of decisions were approvals.

    2021: 6, 2022: 9, 2023: 7, 2024: 4, 2025: 5, 2026: 505102021: 4 approved2021: 2 refused6’21*2022: 9 approved9’222023: 6 approved2023: 1 refused7’232024: 4 approved4’242025: 5 approved5’252026: 5 approved5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 13 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • 62 Sweet Briar Lawn, Tramore, Waterford, X91 R28R · 30 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 25/153 · 399 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 12 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Stars · Crèche12 Sept 2024 · report · Tusla Early Years Inspectorate291 m
    Glor na Mara Playschool · Crèche15 Apr 2026 · report · Tusla Early Years Inspectorate400 m
    Naionra Philib Barún · Crèche2 Jun 2026 · report · Tusla Early Years Inspectorateapprox. 613 m
    Respond Early Years Service, Tramore · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate789 m
    H & H Ladybird Daycare Limited · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorateapprox. 973 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Waterford City and County Council.
    Homes approved
    Here91
    Council middle0
    Homes started
    Here170
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    78% owner-occupied (council 65%).

    Homes built before 1971
    23% · council 29%
    Homes built since 2001
    18% · council 30%
    Owner-occupied
    78% · council 65%
    Rented
    10% · council 29%
    Children under 15
    14% · council 19%
    Aged 65 and over
    22% · council 17%
    Households with 2+ cars
    47% · council 41%
    Work mainly from home
    5% · council 11%
    This small area (297 people)Waterford City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 227090018

    Bus
    95 m
    Crobally Heights · 360, 360A · busiest stop within 500 m: 4 an hour at peak
    Nearest school
    427 m
    Glor na Mara NS, 381 pupils
    Schools, stops and the council

    Schools

    • Glor na Mara NS · primary · 381 pupils · 427 m
    • Gaelscoil Philib BarúN · primary · 194 pupils · 534 m
    • Tramore Educate Together National School · primary · 180 pupils · 698 m
    • Ardscoil na Mara · postprimary · 1227 pupils · 988 m

    Stops 24

    • Crobally Heights · 360, 360A · 4/hour at peak · 95 m
    • Árd na Groí · 358 · 113 m
    • Árd na Groí · 358, 360, 360A · 4/hour at peak · 124 m
    • Monvoy Valley · 360, 360A · 4/hour at peak · 167 m
    • Monvoy Valley · 360, 360A · 4/hour at peak · 239 m
    • Marian Terrace · 360, 360A · 4/hour at peak · 244 m
    • St Otterans Terrace · 360A · 1/hour at peak · 425 m
    • Summer Hill · 360A, 367 · 1/hour at peak · 704 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Glor na Mara NS · 427 m+0.3% pupils (381) · an extension 2025, no decision yet
    • Gaelscoil Philib BarúN · 534 m+2.6% pupils (194)
    • Tramore Educate Together National School · 698 m+4.7% pupils (180)
    • Ardscoil na Mara · 988 m+1.2% pupils (1,227)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Application 359 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Crobally Upper
    Electoral division
    Tramore
    Electoral area
    Tramore-Waterford City West
    Council
    Waterford City And County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; on the vacant land tax map.
    • 4 sites nearby could change: 1 approved scheme, 3 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 23 Nov 2026.
    • 12 homes approved nearby, not started; largest 12 at Tramore CBS Site.
    • Árd na Groí (bus 358, 360) 124 m away: 4 an hour at morning peak; 20 from all stops within 500 m.
    • Here (2022 census): 78% owner-occupied (council 65%); 6% of homes empty (council 11%); most built 1991–2000; 67% drive to work (council 63%); population up 4% since 2016.
    • 2 home extensions within 250 m since 2026.
    • Around here the council decides in a median 56 days (about 8 weeks); 39% are asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 00:03 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.