Planning report · Waterford City And County Council · 2000 m around the house · the last 12 months · 30 Oct 2026, 14:49

Tramore Road

52.21436, -7.12217

Homes here mostly date from the 2000s. 57 homes approved 1.7 km away haven't started.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallindudBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 1 file on Ballindud2023: 1 file on Ballindud2025: 1 file on Ballindud3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G3
Zoning · High amenity
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningG3 · High amenity
What it says

HA: Protect highly sensitive and scenic location from inappropriate development that would adversely affect the environmental quality of the locations.

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Protected building1 within 100 m Mid 19th Century house three bay two storey over basement house that has been extended twice. First extension in late 19th century comprising four bay two storey overbasement projecting block to the south. The bay windows and projecting porch was adde
Heritage inventory2 within 100 m Grace Dieu; Grace Dieu

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings7Ballinamona House; 22901704
Monuments28R132337; R132357
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 11 on the draft 2027 map; 11 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 86% approved, and 1 in 2 are asked for more information.

New house in a garden or site7 decided · more info asked 57%
86% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 7 nearby, 906 council-wide

Figure 3

Ballindud, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

3 planning files on Ballindud since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2023 · other extension · approved · 2360256Porches, roofs, otherNo number · 2021 · other work · approved · 21459New house in a side gardenNo number · 2025 · new house · approved · 2556
ApprovedRefusedWithdrawn or invalid

3 files with "Ballindud" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    0 of 1 appealed approvals were reversed.

    Approvals appealed1 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Tramore Road with 12 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesNo decision yetApproved
    1. 1Lacken, Kilbarry 2660777No decision yet · 1.5 km
    2. 2The Gate Lodge, Coolgower 2686Approved with conditions · 543 m
    3. 3Lacken 2560251Approved, no sign building has started · 1.7 km
    4. 4Lacken 2560553Approved, no sign building has started · 1.8 km
    5. 55.2 ha zoned for homesEmpty land zoned for homes · 1.6 km
    6. 65.7 ha zoned for homesEmpty land zoned for homes · 1.8 km
    7. 74.9 ha zoned for homesEmpty land zoned for homes · 1.8 km
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 1.9 km
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 2.0 km
    10. 10Coolgower, Tramore Road 2644No decision yet · 368 m
    11. 11Ballykinsella, Tramore 2660203Approved with conditions · 1.7 km
    12. 12Killure Bridge, Grantstown 2560864Approved with conditions · 1.8 km
    Figure 5

    The next 30 days

    2 deadlines within 2.0 km; the first closes 10 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-10 2686: CONDITIONAL — to construct a single storey side extension to provide master bedroom ensuite and TV Room; 2026-11-12 2660777: application received — Retention permission and PERMISSION for development for amendments to a permitted residential development, granted planntoday4 Nov9 Nov14 Nov19 Nov24 Nov29 Nov2686: CONDITIONAL — to construct a single storey side extension to provide master bedroom ensuite and TV Room · 543 m away · 2026-11-102660777: application received — Retention permission and PERMISSION for development for amendments to a permitted residential development, granted plann · 1.5 km away · 2026-11-12
    Comments closeTime to appeal ends
    • Time to appeal ends 10 Nov 202611 days left
      22686 · CONDITIONAL — to construct a single storey side extension to provide master bedroom ensuite and TV Room
      €220 to An Coimisiún Pleanála (€110 observer) · 543 m away
    • Comments close 12 Nov 202613 days left
      12660777 · application received — Retention permission and PERMISSION for development for amendments to a permitted residential…
      €20 to the council · 1.5 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    57 homes 1.7 km away were approved Jan 2026 with no start notice yet; the permission runs to Jan 2031.

    Lacken · 57 homes: 57 homes approved Jan 2026, not started; Lacken · 12 homes: 12 homes approved Mar 2026, not started202420252026202720282029203020312032Lacken · 57 homes1.7 km · 256025157 homes approved Jan 2026, not started57 homes approved Jan 2026, not startedLacken · 12 homes1.8 km · 256055312 homes approved Mar 2026, not started12 homes approved Mar 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 7 within 2.0 km

    Approved, not started 2

    • Lacken · 57 homes approved Jan 2026, not started · 1.7 km
    • Lacken · 12 homes approved Mar 2026, not started · 1.8 km

    Empty land zoned for homes 5

    • 55.2 ha zoned for homes · no homes built on it yet · 1.6 km
    • 65.7 ha zoned for homes · no homes built on it yet · 1.8 km
    • 74.9 ha zoned for homes · no homes built on it yet · 1.8 km
    • 80.3 ha zoned for homes · no homes built on it yet · 1.9 km
    • 90.2 ha zoned for homes · no homes built on it yet · 2.0 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 1 a year; busiest 2022. 100% of decisions were approvals.

    2021: 1, 2022: 1, 2023: 1, 2024: 1, 2025: 105102021: 1 approved1’21*2022: 1 approved1’222023: 1 approved1’232024: 1 approved1’242025: 1 approved1’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Lacken , Kilbarry , Waterford comments close 12 Nov 2026
      Retention permission and PERMISSION for development for amendments to a permitted residential development,…
      26607778 Oct 20261.5 km
    Every application within 2.0 km 10 in the last 12 months

    See every application on the map

    • Lacken , Kilbarry , Waterford Withdrawn or not valid
      Retention permission and planning permission for development for amendments to a permitted residential…
      26607652 Oct 20261.5 km
    • Lacken , Kilbarry , Waterford No decision yet
      Retention permission and planning permission for development for amendments to a permitted residential…
      266071917 Sept 20261.5 km
    • Lacken , Kilbarry , Waterford Withdrawn or not valid
      amendments to a permitted residential development, granted planning permission under P22/11. Amendment works…
      26606783 Sept 20261.5 km
    • 2The Gate Lodge , Coolgower , Tramore Road Approved with conditions
      to construct a single storey side extension to provide master bedroom ensuite and TV Room
      268613 Oct 20261 homes543 m
    • The Gate Lodge , Coolgower , Tramore Road Withdrawn or not valid
      to construct a single storey side extension to existing property
      267712 Aug 2026543 m
    • 10Coolgower , Tramore Road , Waterford No decision yet
      residential dwelling apartment unit over existing garage building as constructed (originally previously…
      264411 May 2026368 m
    • 11Ballykinsella , Tramore , Co. Waterford Approved with conditions
      sought for the infill of existing agricultural lands with inert soil and stones (EU Waste Class 17 05 04)…
      266020311 Sept 20261.7 km
    • Coolgower , Tramore Road , Waterford Withdrawn or not valid
      residentials dwellings apartments unit over existing garage building as constructed (originally previously…
      26522 Jan 2026368 m
    • 12Killure Bridge , Grantstown , Waterford Approved with conditions
      alterations to the permitted planning permission reference number 2560392. The alterations include for a…
      25608644 Feb 20261 homes1.8 km
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Building work nearby 4 in the last 12 months
    2 not signed off2 no sign-off needed
    • Killure bridge, Waterford · 4 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60392 REVISED 25/60864 · 1.9 km
    • Lacken Road, Kilbarry, Waterford · 2 Feb 2026 · 10 homes · start notice not signed off · 2212 · 2.0 km
    • Lacken Road, Kilbarry, Waterford · 2 Feb 2026 · 52 homes · start notice not signed off · 2211 · 2.0 km
    • Ballykinsella, Ballynock, Waterford, x91 · 5 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560178 · 1.8 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Homes coming 69 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    How busy is this area About as busy as most of Waterford City and County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here1
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    11% of homes built before 1971 (council 29%). 58% owner-occupied (council 65%).

    Homes built before 1971
    11% · council 29%
    Homes built since 2001
    75% · council 30%
    Owner-occupied
    58% · council 65%
    Rented
    32% · council 29%
    Children under 15
    25% · council 19%
    Aged 65 and over
    7% · council 17%
    Households with 2+ cars
    45% · council 41%
    Work mainly from home
    13% · council 11%
    This small area (313 people)Waterford City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 228007001

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    63 m
    Duagh · 360, 360A · busiest stop within 500 m: 4 an hour at peak
    Schools, stops and the council

    Schools

    None nearby.

      Stops 6

      • Duagh · 360, 360A · 4/hour at peak · 63 m
      • Duagh · 360, 360A · 4/hour at peak · 140 m
      • Ballindud · 360, 360A · 4/hour at peak · 736 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 02:17
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic30 Oct 2026, 01:04open
      Council meetings (ModernGov)Public30 Oct 2026, 02:17open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G3 (high amenity), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. Application 1.5 km away open for comments until 12 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballindud
      Electoral division
      Ballytruckle
      Electoral area
      Waterford City South
      Council
      Waterford City And County Council
      Everything we found, as a list 8 lines
      • Zoned G3 (high amenity); not protected; no vacant land tax.
      • 7 sites nearby could change: 2 approved schemes, 5 empty zoned plots.
      • 1 application open for comments nearby; nearest closes 12 Nov 2026.
      • 69 homes approved nearby, not started; largest 57 at Lacken.
      • Duagh (bus 360, 360A) 63 m away: 4 an hour at morning peak; 8 from all stops within 500 m.
      • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 58% owner-occupied (council 65%); 6% of homes empty (council 11%); most built 2001–2010; 63% drive to work (council 63%); population up 10% since 2016.
      • The council decides in a median 56 days (about 8 weeks); 40% are asked for more information.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
      www2.courts.ie—© the publisher29 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
      services-eu1.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 30 Oct 2026, 14:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.