Planning report · Waterford City And County Council · 2000 m around the house · the last 12 months · 29 Oct 2026, 09:35

Outer Ring Road

52.22849, -7.11464

Homes here mostly date from the 2000s. 99 homes approved 1.1 km away haven't started.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G1
Zoning · Open space with recreation
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningG1 · Open space with recreation
What it says

OS: Preserve and provide for open space and recreational amenities.

Open space with active recreational amenities — pitches, courts, play areas.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings7Saint Angela's Ursuline Convent; 22901704
Monuments51R132337; R132357
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3338 on the draft 2027 map; 3340 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved, and 1 in 2 are asked for more information.

New house in a garden or site6 decided · more info asked 50%
83% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 906 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 50 days.

    Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 50–58 (n=9)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated13 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 3 appealed refusals became permissions. 1 of 4 appealed approvals were reversed.

    Refusals appealed3 decided
    2 became permissions
    Approvals appealed4 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 500554 Granted · Killure Road , Kilcohan , Waterford · 608 m
    • 323907 Refused · South of Lacken Wood Residential Estate and east of Lacken Road, in… · 1.1 km
    • 500552 Invalid · Killure Road , Kilcohan , Waterford · 608 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher28 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 4

    What's changing around you?

    Street map around Outer Ring Road with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesApproved
    1. 1Killure Road, Kilcohan 2660808No decision yet · 623 m
    2. 2Lacken, Kilbarry 2660777No decision yet · 674 m
    3. 3Williamstown, Williamstown 2660734No decision yet · 877 m
    4. 4Lacken 2560251Approved, no sign building has started · 725 m
    5. 5Killure Road 2560154Approved, no sign building has started · 864 m
    6. 6Lacken Road 2560487Approved, no sign building has started · 1.1 km
    7. 7Lacken 2560553Approved, no sign building has started · 1.3 km
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 223 m
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 303 m
    10. 100.2 ha zoned for homesEmpty land zoned for homes · 347 m
    11. 113.5 ha zoned for homesEmpty land zoned for homes · 446 m
    12. 120.2 ha zoned for homesEmpty land zoned for homes · 472 m
    13. 130.1 ha zoned for homesEmpty land zoned for homes · 482 m
    14. 14R708 Killure Road, Kilcohan 2660163Approved with conditions · 874 m
    15. 15Kilbarry, Waterford City 2560867Approved with conditions · 1.3 km
    Figure 5

    The next 30 days

    3 deadlines within 2.0 km; the first closes 29 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-29 2660734: application received — 10-year planning permission for 1.) the raising of existing agricultural land levels, including the raising of land leve; 2026-11-12 2660777: application received — Retention permission and PERMISSION for development for amendments to a permitted residential development, granted plann; 2026-11-24 2660808: application received — construction of a residential development consisting of a single storey creche and 96No. dwelling units comprising 47No.today3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov2660734: application received — 10-year planning permission for 1.) the raising of existing agricultural land levels, including the raising of land leve · 877 m away · 2026-10-292660777: application received — Retention permission and PERMISSION for development for amendments to a permitted residential development, granted plann · 674 m away · 2026-11-122660808: application received — construction of a residential development consisting of a single storey creche and 96No. dwelling units comprising 47No. · 623 m away · 2026-11-24
    Comments close
    • Comments close 29 Oct 2026closes today
      32660734 · application received — 10-year planning permission for 1.) the raising of existing agricultural land levels, including…
      €20 to the council · 877 m away
    • Comments close 12 Nov 202614 days left
      22660777 · application received — Retention permission and PERMISSION for development for amendments to a permitted residential…
      €20 to the council · 674 m away
    • Comments close 24 Nov 202626 days left
      12660808 · application received — construction of a residential development consisting of a single storey creche and 96No.…
      €20 to the council · 623 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    99 homes 1.1 km away were approved Aug 2026 with no start notice yet; the permission runs to Aug 2031.

    Lacken Road · 99 homes: 99 homes approved Aug 2026, not started; Lacken · 57 homes: 57 homes approved Jan 2026, not started; Killure Road · 51 homes: 51 homes approved Dec 2025, not started; Lacken · 12 homes: 12 homes approved Mar 2026, not started202420252026202720282029203020312032Lacken Road · 99 homes1.1 km · 256048799 homes approved Aug 2026, not started99 homes approved Aug 2026, not startedLacken · 57 homes725 m · 256025157 homes approved Jan 2026, not started57 homes approved Jan 2026, not startedKillure Road · 51 homes864 m · 256015451 homes approved Dec 2025, not started51 homes approved Dec 2025, not startedLacken · 12 homes1.3 km · 256055312 homes approved Mar 2026, not started12 homes approved Mar 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 14 within 2.0 km

    Approved, not started 4

    • Lacken · 57 homes approved Jan 2026, not started · 725 m
    • Killure Road · 51 homes approved Dec 2025, not started · 864 m
    • Lacken Road · 99 homes approved Aug 2026, not started · 1.1 km
    • Lacken · 12 homes approved Mar 2026, not started · 1.3 km

    Empty land zoned for homes 10

    • 80.3 ha zoned for homes · no homes built on it yet · 223 m
    • 90.2 ha zoned for homes · no homes built on it yet · 303 m
    • 100.2 ha zoned for homes · no homes built on it yet · 347 m
    • 113.5 ha zoned for homes · no homes built on it yet · 446 m
    • 120.2 ha zoned for homes · no homes built on it yet · 472 m
    • 130.1 ha zoned for homes · no homes built on it yet · 482 m
    • 0.2 ha zoned for homes · no homes built on it yet · 500 m
    • 0.2 ha zoned for homes · no homes built on it yet · 503 m
    • 0.1 ha zoned for homes · no homes built on it yet · 506 m
    • 0.2 ha zoned for homes · no homes built on it yet · 508 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open

    Open for comments €20 to comment

    • 3Williamstown , Williamstown , Waterford comments close 29 Oct 2026
      10-year planning permission for 1.) the raising of existing agricultural land levels, including the raising…
      266073424 Sept 2026877 m
    • 2Lacken , Kilbarry , Waterford comments close 12 Nov 2026
      Retention permission and PERMISSION for development for amendments to a permitted residential development,…
      26607778 Oct 2026674 m
    • 1Killure Road , Kilcohan , Waterford comments close 24 Nov 2026
      construction of a residential development consisting of a single storey creche and 96No. dwelling units…
      266080820 Oct 2026623 m
    Every application within 2.0 km 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 14 in the last 12 months
    1 signed off as finished12 not signed off1 no sign-off needed
    • Brookfield, Kilbarry, Waterford · 23 Oct 2026 · 98 homes · start notice not signed off · 25/60867 · 1.6 km
    • Carrigea Crescent, Waterford · 16 Sept 2026 · 40 homes · start notice not signed off · 2360553 & 2460101 & 2460401 · 1.6 km
    • St Martins Special School, Lower Grange, Waterford, X91 D9XH · 14 Sept 2026 · start notice not signed off · 24/60557 · 1.9 km
    • Knightswood, Williamstown, Waterford · 10 Sept 2026 · 3 homes · start notice not signed off · 2560394 · 1.9 km
    • Brookfield, Waterford · 19 Aug 2026 · 67 homes · start notice not signed off · 2560781 · 1.5 km
    • 5 Oak Drive, Waterford · 3 Aug 2026 · start notice not signed off · 2660023 · 1.7 km
    • Lacken Road, Waterford · 29 May 2026 · 4 homes · start notice not signed off · 2460761 ACP323071.25 · 1.9 km
    • Killure bridge, Waterford · 4 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60392 REVISED 25/60864 · 1.8 km
    • Knightswood, Williamstown,, Waterford · 14 Mar 2026 · 98 homes · start notice signed off · 2560394 · 1.9 km
    • Lacken Road, Kilbarry, Waterford · 2 Feb 2026 · 52 homes · start notice not signed off · 2211 · 1.1 km
    • Lacken Road, Kilbarry, Waterford · 2 Feb 2026 · 10 homes · start notice not signed off · 2212 · 1.1 km
    • Deerpark, Port Láirge, Waterford · 17 Dec 2025 · 24 homes · start notice not signed off · 24/60374 & ABP-321288-24 · 1.5 km
    • Deerpark, Port Láirge, Waterford · 17 Dec 2025 · 21 homes · start notice not signed off · 24/60374 & ABP-321288-24 · 1.6 km
    • Deerpark, Port Láirge, Waterford · 17 Dec 2025 · 34 homes · start notice not signed off · 24/60374 & ABP-321288-24 · 1.5 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Homes coming 219 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Tip Toes Community Childcare Centre · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate117 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Waterford City and County Council.
    Homes approved
    Here108
    Council middle0
    Homes started
    Here1
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    11% of homes built before 1971 (council 29%). 58% owner-occupied (council 65%).

    Homes built before 1971
    11% · council 29%
    Homes built since 2001
    75% · council 30%
    Owner-occupied
    58% · council 65%
    Rented
    32% · council 29%
    Children under 15
    25% · council 19%
    Aged 65 and over
    7% · council 17%
    Households with 2+ cars
    45% · council 41%
    Work mainly from home
    13% · council 11%
    This small area (313 people)Waterford City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 228007001

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    588 m
    Beech Court · W3
    Nearest school
    1.7 km
    Scoil Lorcain Bns, 345 pupils
    Schools, stops and the council

    Schools

    • Scoil Lorcain Bns · primary · 345 pupils · 1.7 km
    • St Martins Special Sch · primary · 100 pupils · 1.9 km
    • St Angela's Secondary School · postprimary · 937 pupils · 2.0 km

    Stops 20

    • Beech Court · W3 · 3/hour at peak · 588 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 02:14
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Council consultation portalsPublic29 Oct 2026, 01:01open
    Council meetings (ModernGov)Public29 Oct 2026, 02:14open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned G1 (open space with recreation), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 623 m away open for comments until 24 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballindud
    Electoral division
    Ballytruckle
    Electoral area
    Waterford City South
    Council
    Waterford City And County Council
    Everything we found, as a list 8 lines
    • Zoned G1 (open space with recreation); not protected; no vacant land tax.
    • Flood Zone A 12 m away on the Waterford City and County Development Plan 2022-2028 flood map.
    • 14 sites nearby could change: 4 approved schemes, 10 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 24 Nov 2026.
    • 219 homes approved nearby, not started; largest 99 at Lacken Road.
    • No morning-peak service within 500 m; nearest is Beech Court, 588 m away (3 an hour).
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 58% owner-occupied (council 65%); 6% of homes empty (council 11%); most built 2001–2010; 63% drive to work (council 63%); population up 10% since 2016.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
    www2.courts.ie—© the publisher28 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services-eu1.arcgis.com—CC BY 4.0—
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 29 Oct 2026, 09:35 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.