How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 85 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CregganeBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 3 files on Creggane2023: 1 file on Creggane2024: 6 files on Creggane2025: 5 files on Creggane2026: 1 file on Creggane16 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory5 within 100 m OK Corrall; barracks

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Buttevant (739 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings14Roche; S. McGiff
Monuments6Bridge; Standing stone
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Creggane, file by file since 2021

3 of 3 decided extensions on the road were approved.

16 planning files on Creggane since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · attic conversion / dormer · undecided · 21/4975No number · 2021 · attic conversion / dormer · approved · 21/5233No number · 2024 · other extension · approved · 24/4296No number · 2024 · other extension · undecided · 24/6411No number · 2025 · single-storey rear · approved · 25/5641Porches, roofs, otherNo number · 2021 · other work · approved · 21/5969No number · 2023 · other work · refused · 23/6200No number · 2024 · other work · undecided · 24/6024No number · 2024 · other work · undecided · 24/6121No number · 2024 · other work · undecided · 24/6241No number · 2024 · other work · approved · 24/6387No number · 2025 · other work · undecided · 25/4150No number · 2025 · other work · approved · 25/4301No. 5 · 2025 · other work · approved · 25/4437No number · 2025 · other work · approved · 25/4467No number · 2026 · other work · undecided · 26/2093New house in a side garden
ApprovedRefusedWithdrawn or invalid

16 files with "Creggane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 85 days.

    Comments open: 5 weeks · €20; Council decision: 85 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 85 days, middle half 50–216 (n=12)85 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeks

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated12 decided home extensions, 0 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Buttevant with 5 numbered planning items
    ⌖ the houseEmpty land zoned for homesNo decision yet
    1. 15.8 ha zoned for homesEmpty land zoned for homes · 201 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 289 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 356 m
    4. 41.9 ha zoned for homesEmpty land zoned for homes · 394 m
    5. 5Military Road, Creggane 26/2093No decision yet · 109 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 7 permissions since 2016, 1 show a start notice and 0 have a completion certificate.

    15 applications lodged within 500 m. Council: 7 approved, 1 refused. After appeals: 7 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 1 started, 6 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT7: lodged → approved1: lodged → refused7: lodged → undecided7: approved → approved1: refused → refused7: undecided → undecided6: approved → no start notice found1: approved → started, not signed off15 lodged15 lodged7 approved7 approved1 refused1 refused7 undecided7 undecided7 approved7 approved1 refused1 refused7 undecided7 undecided6 no start notice found6 no start notice found1 started, not signed off1 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured15 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 4 within 500 m

      Empty land zoned for homes 4

      • 15.8 ha zoned for homes · no homes built on it yet · 201 m
      • 20.2 ha zoned for homes · no homes built on it yet · 289 m
      • 30.2 ha zoned for homes · no homes built on it yet · 356 m
      • 41.9 ha zoned for homes · no homes built on it yet · 394 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 6

      Applications within 500 m, by year

      Between 2 and 6 a year; busiest 2024. 88% of decisions were approvals.

      2021: 1, 2023: 2, 2024: 6, 2025: 5, 2026: 105102021: 1 approved1’21*2023: 1 refused2023: 1 undecided2’232024: 2 approved2024: 4 undecided6’242025: 4 approved2025: 1 undecided5’252026: 1 undecided1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 1 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Eden Childcare Early Years Ltd · Crèche8 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 598 m
      Goldfinch Early Education Limited · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorateapprox. 598 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here62
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 7

      This street block against the council

      49% of homes built before 1971 (council 28%). 73% owner-occupied (council 73%).

      Homes built before 1971
      49% · council 28%
      Homes built since 2001
      28% · council 36%
      Owner-occupied
      73% · council 73%
      Rented
      24% · council 22%
      Children under 15
      11% · council 21%
      Aged 65 and over
      20% · council 16%
      Households with 2+ cars
      42% · council 52%
      Work mainly from home
      2% · council 12%
      This small area (208 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047060008

      Road noise
      60–64 dB
      day–night average (EPA 2022)
      Bus
      433 m
      Buttevant · 51, 519 · busiest stop within 500 m: 1 an hour at peak
      Nearest school
      366 m
      Colaiste Pobail Naomh Mhuire, 589 pupils
      Schools, stops and the council

      Schools

      • Colaiste Pobail Naomh Mhuire · postprimary · 589 pupils · 366 m
      • Scoil Mhuire na Trocaire · primary · 213 pupils · 833 m

      Stops 4

      • Buttevant · 51, 519 · 1/hour at peak · 433 m
      • Buttevant · 522 · 0/hour at peak · 497 m
      • Buttevant · 522 · 0/hour at peak · 500 m
      • Buttevant · 51, 519 · 1/hour at peak · 661 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Colaiste Pobail Naomh Mhuire · 366 m+1.6% pupils (589) · 15 classrooms 2024, approved with conditions
      • Scoil Mhuire na Trocaire · 833 m-0.5% pupils (213)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Creggane
      Electoral division
      Buttevant
      Electoral area
      Mallow
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); no vacant land tax.
      • 4 sites nearby could change: 4 empty zoned plots.
      • Buttevant (bus 51, 519) 433 m away: 1 an hour at morning peak.
      • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 73% owner-occupied (council 73%); 22% of homes empty (council 13%); most built before 1919; 67% drive to work (council 66%); population up 13% since 2016.
      • The council decides in a median 67 days (about 10 weeks).
      • 1 applications nearby in the last 12 months.
      • Colaiste Pobail Naomh Mhuire, 366 m away: 15 classrooms approved (2024).
      What the terms mean 3 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 09:52 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.