Planning report · Wexford County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 08:15

Greenore Park

52.25108, -6.34585

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2021. 27 homes approved 205 m away haven't started.

See on the mapWatch this area

Not held yet for Wexford County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallygerryBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 20211276 · work already done, approved2021: 3 files on Ballygerry2023: 1 file on Ballygerry2024: 2 files on Ballygerry6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    20211276 · work already done · approved 2021 · work already done
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential & Infill: To protect and enhance the residential amenity of existing and developed communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wexford county development plan 2022 2028 · 25 Jul 2022 – 17 Sept 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Rosslare Harbour (876 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings4Rosslare Harbour Coastguard Station; Tuskar Dwellings
Monuments2R134139; Windmill
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 26 on the draft 2027 map; 26 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 78% approved, and 1 in 2 is asked for more information.

New house in a garden or site9 decided · more info asked 44%
78% · council 76%
Approved nearbyWexford overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 9 nearby, 2,273 council-wide

Figure 3

Ballygerry, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

6 planning files on Ballygerry since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 20211499Porches, roofs, otherNo number · 2021 · other work · approved · 20211276No number · 2021 · other work · approved · 20211979No number · 2023 · other work · approved · 20231259No number · 2024 · other work · approved · 20241607New house in a side gardenNo number · 2024 · new house · approved · 20241244
ApprovedRefusedWithdrawn or invalid

6 files with "Ballygerry" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days.

    Comments open: 5 weeks · €20; Council decision: 51 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 44–54 (n=19)51 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off33% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated19 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 2 appealed refusals became permissions. 1 of 3 appealed approvals were reversed.

    Refusals appealed2 decided
    1 became permissions
    Approvals appealed3 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 323952 Open · Located northwest of Rosslare Europort and on lands located in… · 129 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Greenore Park with 11 numbered planning items
    ⌖ the houseApproved, not startedAppealEmpty land zoned for homesApprovedNo decision yet
    1. 1Ballygillane Little 20250869Approved, no sign building has started · 205 m
    2. 2Located northwest of Rosslare Europort and on lands located in Ballygerry Townland, St Helen's 323952Appeal: open · 129 m
    3. 30.1 ha zoned for homesEmpty land zoned for homes · 19 m
    4. 40.4 ha zoned for homesEmpty land zoned for homes · 41 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 58 m
    6. 60.9 ha zoned for homesEmpty land zoned for homes · 130 m
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 147 m
    8. 81.1 ha zoned for homesEmpty land zoned for homes · 175 m
    9. 9Ballygillane Little, St. Helen's 20260093Approved with conditions · 170 m
    10. 10Ballygillane Little, St. Helen's 20260845Approved with conditions · 281 m
    11. 11Ballygillane Little, St. Helen's 20261093No decision yet · 294 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 25 permissions since 2016, 5 show a start notice and 3 have a completion certificate.

    27 applications lodged within 500 m. Council: 25 approved, 2 refused. After appeals: 25 approved. Of those: 3 signed off, 0 built with the owner's opt-out, 2 started, 19 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT25: lodged → approved2: lodged → refused25: approved → approved2: refused → refused19: approved → no start notice found2: approved → started, not signed off3: approved → signed off1: approved → ran out27 lodged27 lodged25 approved25 approved2 refused2 refused25 approved25 approved2 refused2 refused19 no start notice found19 no start notice found2 started, not signed off2 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured27 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 1 Dec 2026.

    1 deadlines in the next 30 days: 2026-12-01 ACP 322134: Grant permission with revised conditionstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecACP 322134: Grant permission with revised conditions · 285 m away · 2026-12-01
    High Court window ends
    • Time to ask the High Court for a review ends 1 Dec 202630 days left
      Grant permission with revised conditions
      285 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    27 homes 205 m away were approved Jan 2026 with no start notice yet; the permission runs to Jan 2031.

    Ballygillane Little · 27 homes: 27 homes approved Jan 2026, not started20242025202620272028202920302031Ballygillane Little · 27 homes205 m · 2025086927 homes approved Jan 2026, not started27 homes approved Jan 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 10 within 500 m

    Approved, not started 1

    Empty land zoned for homes 9

    • 30.1 ha zoned for homes · no homes built on it yet · 19 m
    • 40.4 ha zoned for homes · no homes built on it yet · 41 m
    • 50.3 ha zoned for homes · no homes built on it yet · 58 m
    • 60.9 ha zoned for homes · no homes built on it yet · 130 m
    • 70.1 ha zoned for homes · no homes built on it yet · 147 m
    • 81.1 ha zoned for homes · no homes built on it yet · 175 m
    • 0.1 ha zoned for homes · no homes built on it yet · 233 m
    • 0.2 ha zoned for homes · no homes built on it yet · 243 m
    • 0.8 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 4 and 7 a year; busiest 2022. 93% of decisions were approvals.

    2021: 6, 2022: 7, 2023: 4, 2024: 4, 2025: 4, 2026: 205102021: 6 approved6’21*2022: 7 approved7’222023: 4 approved4’232024: 3 approved2024: 1 refused4’242025: 3 approved2025: 1 refused4’252026: 2 approved2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 3 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 27 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Greenore Park · 2 applications in 10 years

    Crèches and schools inspected

    NameLatest inspectionDistance
    Tir na nOg Childcare Centre · Crèche26 Feb 2026 · report · Tusla Early Years Inspectorate354 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Wexford County Council.
    Homes approved
    Here63
    Council middle0
    Homes started
    Here101
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    85% owner-occupied (council 70%).

    Homes built before 1971
    29% · council 25%
    Homes built since 2001
    12% · council 38%
    Owner-occupied
    85% · council 70%
    Rented
    12% · council 24%
    Children under 15
    17% · council 20%
    Aged 65 and over
    34% · council 17%
    Households with 2+ cars
    29% · council 46%
    Work mainly from home
    2% · council 10%
    This small area (133 people)Wexford

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 247104005

    Bus
    209 m
    Rosslare Harbour · 370, 387 · busiest stop within 500 m: 1 an hour at peak
    Schools, stops and the council

    Schools

    None nearby.

      Stops 4

      • Rosslare Harbour · 370, 387 · 1/hour at peak · 209 m
      • Rosslare Harbour · 370, 387 · 1/hour at peak · 213 m
      • Rosslare Europort · Dublin - Europort · 0/hour at peak · 515 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (20211276): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      3. 27 homes approved 205 m away (Ballygillane Little), not started: what is planned?
        Ask for: The planning file for 20250869.
        Council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballygerry
      Electoral division
      St. Helen's
      Electoral area
      Rosslare
      Council
      Wexford County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 20211276, approved 2021, work already done.
      • Zoned R2 (existing residential); not protected; on the vacant land tax map.
      • 10 sites nearby could change: 1 approved scheme, 9 empty zoned plots.
      • 27 homes approved nearby, not started; largest 27 at Ballygillane Little.
      • Rosslare Harbour (bus 370, 387) 208 m away: 17 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 84% owner-occupied (council 70%); 23% of homes empty (council 16%); most built 1971–1980; 63% drive to work (council 65%); population up 21% since 2016.
      • Around here the council decides in a median 51 days (about 7 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 45 in the last year, 0 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 08:15 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.