PlanningRegister.ie
Planning report · Waterford City And County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:20

Henry Street Terrace

52.25565, -7.11454

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2026. Home extensions nearby almost always get approved (93%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Waterford City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2026.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of ManorBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2026: 2660548 · extension, undecided2021: 3 files on Manor2023: 1 file on Manor2024: 2 files on Manor2026: 1 file on Manor7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2660548 · extension · no decision yet
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building (Terraced four-bay two-storey house, c.1860, retaining original fenestration with single-bay two-storey advanced lower linking bay to south-east. Reroofed, c.1985. Pitched roofs with replacement artificial slate, c.1985, clay ridge tiles, rendered chim); a building in the national heritage inventory (22830188)
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RS: Provide for residential development and protect and improve residential amenity.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wccc development plan 2022 2028 · 19 Jul 2022 – 18 Jul 2028

Protected buildingOn this site Terraced four-bay two-storey house, c.1860, retaining original fenestration with single-bay two-storey advanced lower linking bay to south-east. Reroofed, c.1985. Pitched roofs with replacement artificial slate, c.1985, clay ridge tiles, rendered chim
Heritage inventoryOn this site The Cottage

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings238shop/retail outlet; house
Monuments20R134097; R134132
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1499 on the draft 2027 map; 1499 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 67% approved, and 1 in 2 are asked for more information.

Single-storey rear29 decided · more info asked 21%
93% · council 99%
Two-storey rear15 decided · more info asked 20%
93% · council 97%
Single-storey side10 decided · more info asked 30%
100% · council 99%
Attic or dormer21 decided · more info asked 43%
95% · council 92%
First-floor16 decided · more info asked 25%
88% · council 94%
New house in a garden or site9 decided · more info asked 56%
67% · council 81%
Approved nearbyWaterford City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 100 nearby, 1,838 council-wide

Figure 3

Manor, file by file since 2021

3 of 3 decided extensions on the road were approved.

7 planning files on Manor since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · rear · approved · 211022No number · 2024 · rear · approved · 2460043No number · 2024 · side · approved · 2460403Porches, roofs, otherNo. 2 · 2021 · other work · approved · 21516No. 1 · 2021 · other work · approved · 21748No number · 2023 · other work · approved · 2360431No number · 2026 · other work · approved · 2660078New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Manor" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey side11—
Two-storey side10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 4 is asked for more information, which adds about 95 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 4): 147 days; Appeal window: 4 weeks; Building starts: 125 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=102)52 daysIf more info asked (1 in 4)With further information: median 147 days (n=34)147 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 125 days after permission (n=35)125 days after permissionSigned off177 days after the start, for the few who file. 51% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated136 decided home extensions, 35 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 14 appealed refusals became permissions. 2 of 11 appealed approvals were reversed.

    Refusals appealed14 decided
    3 became permissions
    Approvals appealed11 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Henry Street Terrace with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingEmpty land zoned for homesBuilding startedNo decision yetApprovedRefused
    1. 128 - 32 John Street & 1 - 3 Manor Street, Waterford 2660789No decision yet · 226 m
    2. 211 College Street, Waterford City 2660667Approved with conditions · 97 m
    3. 30.1 ha zoned for homesEmpty land zoned for homes · 32 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 42 m
    5. 51-6 Aras Mhuire, St. Mary's Terrace P8 11/25Building started · 141 m
    6. 6The Cottage, 15 Henry Street 2660548No decision yet · 4 m
    7. 7B1 & B2, Railway Square 2660159Approved with conditions · 155 m
    8. 8St Joseph’s House, Manor Hill 2660305No decision yet · 187 m
    9. 933 John Street, Waterford 2660312Approved with conditions · 252 m
    10. 10Parnell House, Parnell Street 2660362No decision yet · 280 m
    11. 11De Bruin Court 3.2, Poleberry 2660348Refused · 282 m
    12. 12Parnell House, Parnell Street 2660186No decision yet · 289 m
    13. 13Unit No. 5 Tesco Superstore, Bath Street 2660222Approved with conditions · 294 m
    14. 14Bus Stop 352081, Cork Road (o/s Morris’s DIY) Manor Street 2660500Approved with conditions · 325 m
    15. 15No. 64 Barrack Street Waterford X91 YD37, No. 68 Barrack St Waterford X91 A2W1. 2560839Approved with conditions · 344 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 72 permissions since 2016, 9 show a start notice and 5 have a completion certificate.

    84 applications lodged within 500 m. Council: 73 approved, 11 refused. After appeals: 72 approved. Of those: 5 signed off, 0 built with the owner's opt-out, 4 started, 51 with no start notice found, 12 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT73: lodged → approved11: lodged → refused72: approved → approved11: refused → refused1 approved by the council, refused after an appeal51: approved → no start notice found4: approved → started, not signed off5: approved → signed off12: approved → ran out84 lodged84 lodged73 approved73 approved11 refused11 refused72 approved72 approved12 refused12 refused51 no start notice found51 no start notice found4 started, not signed off4 started, not signed off5 signed off5 signed off12 ran out12 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured84 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 18 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-18 2660667: CONDITIONAL — the single storey front bay window and side garage extensions as constructed; 2026-11-18 2660789: application received — for material alterations to as Granted Planning Application 23/60288 (ABP-3200361-24) at existing Sinnotts property whictoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2660667: CONDITIONAL — the single storey front bay window and side garage extensions as constructed · 97 m away · 2026-11-182660789: application received — for material alterations to as Granted Planning Application 23/60288 (ABP-3200361-24) at existing Sinnotts property whic · 226 m away · 2026-11-18
    Comments closeTime to appeal ends
    • Time to appeal ends 18 Nov 202618 days left
      22660667 · CONDITIONAL — the single storey front bay window and side garage extensions as constructed
      €220 to An Coimisiún Pleanála (€110 observer) · 97 m away
    • Comments close 18 Nov 202618 days left
      12660789 · application received — for material alterations to as Granted Planning Application 23/60288 (ABP-3200361-24) at…
      €20 to the council · 226 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 2 within 500 m

    Empty land zoned for homes 2

    • 30.1 ha zoned for homes · no homes built on it yet · 32 m
    • 40.1 ha zoned for homes · no homes built on it yet · 42 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 8 and 14 a year; busiest 2022. 87% of decisions were approvals.

    2021: 28, 2022: 14, 2023: 12, 2024: 12, 2025: 8, 2026: 1001020302021: 23 approved2021: 5 refused28’21*2022: 12 approved2022: 2 refused14’222023: 12 approved12’232024: 10 approved2024: 2 refused12’242025: 7 approved2025: 1 refused8’252026: 9 approved2026: 1 refused10’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 4 in the last 12 months
    1 signed off as finished3 not signed off
    • Bath Street, Waterford · 21 Sept 2026 · start notice signed off · 2660222 · 223 m
    • Alexander Street, Waterford, X91 A6X2 · 25 Aug 2026 · 2 homes · start notice not signed off · 21 2O2 · 470 m
    • 51-6 Aras Mhuire, St. Mary's Terrace, Hennessy's Road, Waterford · 2 Jun 2026 · 6 homes · start notice not signed off · P8 11/25 · 141 m
    • 22 Parnell Street, Waterford, Kilkenny, X91 AX86 · 3 Feb 2026 · 3 homes · start notice not signed off · 425 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Mount Sion Playschool · Crèche26 Jan 2024 · report · Tusla Early Years Inspectorate151 m
    Waterford Women’s Centre · Crèche27 Nov 2025 · report · Tusla Early Years Inspectorate161 m
    St. Stephen's Pre School · Crèche25 Jun 2024 · report · Tusla Early Years Inspectorate448 m
    Sacred Heart Day Centre, HSE South · Crèche19 Sept 2024 · report · Tusla Early Years Inspectorate489 m
    St. Brigid's Children’s Centre · Crèche22 Jul 2025 · report · Tusla Early Years Inspectorate493 m
    St. Josephs Childcare Centre · Crèche12 Jun 2026 · report · Tusla Early Years Inspectorate561 m
    Presentation Play School · Crèche15 Jan 2024 · report · Tusla Early Years Inspectorate572 m
    The Children's House Montessori · Crèche11 Jun 2024 · report · Tusla Early Years Inspectorate604 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Waterford City and County Council.
    Homes approved
    Here49
    Council middle0
    Homes started
    Here72
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    57% of homes built before 1971 (council 29%). 15% owner-occupied (council 65%).

    Homes built before 1971
    57% · council 29%
    Homes built since 2001
    23% · council 30%
    Owner-occupied
    15% · council 65%
    Rented
    73% · council 29%
    Children under 15
    13% · council 19%
    Aged 65 and over
    9% · council 17%
    Households with 2+ cars
    6% · council 41%
    Work mainly from home
    9% · council 11%
    This small area (364 people)Waterford City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 228027005/228027006

    Bus
    192 m
    Railway Square · 354, 360, 360A · busiest stop within 500 m: 13 an hour at peak
    Nearest school
    166 m
    C.B.S. Mount Sion, Waterford, 494 pupils
    Schools, stops and the council

    Schools

    • C.B.S. Mount Sion, Waterford · postprimary · 494 pupils · 166 m
    • Mount Sion Cbs NS · primary · 360 pupils · 218 m
    • St Josephs Special Sch · primary · 96 pupils · 429 m
    • St Stephens NS · primary · 363 pupils · 448 m
    • S N Deaglan · primary · 396 pupils · 574 m
    • Christ Church NS · primary · 114 pupils · 662 m
    • Presentation Primary School · primary · 446 pupils · 830 m
    • De La Salle College · postprimary · 1023 pupils · 842 m

    Stops 53

    • Railway Square · 354, 360, 360A, 667, W1 · 8/hour at peak · 192 m
    • Barrack Street · W1 · 3/hour at peak · 258 m
    • SETU College St · 340, 354, 360, 360A, 667, 736 · 9/hour at peak · 267 m
    • John Street · 667, W3, W5 · 5/hour at peak · 272 m
    • SETU College St · 340, 354, 360, 360A, 370, 667 · 9/hour at peak · 329 m
    • Mayor's Walk · W1 · 3/hour at peak · 377 m
    • Parnell Street · 340, 354, 360, 360A, 362, 40 · 13/hour at peak · 416 m
    • Upr Johnstown · W3 · 3/hour at peak · 423 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • C.B.S. Mount Sion, Waterford · 166 m+5.3% pupils (494)
    • Mount Sion Cbs NS · 218 m+0.3% pupils (360)
    • St Josephs Special Sch · 429 m-4% pupils (96)
    • St Stephens NS · 448 m-3.2% pupils (363)
    • S N Deaglan · 574 m-4.6% pupils (396)
    • Christ Church NS · 662 m-7.3% pupils (114)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (2660548) awaits a decision: what is planned?
      Ask for: The application on the council's website.
      Seller · solicitor
    2. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    3. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    4. Application 226 m away open for comments until 18 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Decision 96 m away can be appealed until 18 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Manor
    Electoral division
    Mount Sion
    Electoral area
    Waterford City South
    Council
    Waterford City And County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2660548, no decision yet.
    • Zoned R2 (existing residential); protected building; heritage-listed; on the vacant land tax map.
    • Flood Zone A 99 m away on the Waterford City and County Development Plan 2022-2028 flood map.
    • 2 sites nearby could change: 2 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 18 Nov 2026.
    • Parnell Street (bus 340, 354) 472 m away: 13 an hour at morning peak; 67 from all stops within 500 m.
    • Here (2022 census): 73% rent (council 29%); 22% of homes empty (council 11%); most built before 1919; 26% drive to work (council 63%); population up 38% since 2016.
    • 2 home extensions within 250 m since 2026.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services-eu1.arcgis.com—CC BY 4.0—
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 22:20 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.