PlanningRegister.ie
Planning report · Cork County Council · 2000 m around the house · the last 12 months · 17 Oct 2026, 06:47

Kildrum, Mitchelstown, The Municipal District of Fermoy, County Cork, Munster, Éire / Ireland

52.25976, -8.22973

Homes here mostly date from the 2000s.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 60 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G3
Zoning · High amenity
No
Vacant land tax · not on the map
A
Flood zone (development plan) · Zone A: highest risk
Zoning, protection, tax and flood: the detail
ZoningG3 · High amenity
What it says

Greenbelt1: Discourage strongly new individual housing from being located within the greenbelts around the Main Towns.

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings2workhouse; house
Monuments42Souterrain; Ritual site - holy/saint's stone
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved.

New house in a garden or site8 decided · more info asked 0%
100% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 8 nearby, 8,048 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 60 days.

    Comments open: 5 weeks · €20; Council decision: 60 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 60 days, middle half 55–124 (n=8)60 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated8 decided home extensions, 1 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Kildrum, Mitchelstown, The Municipal District of Fermoy, County Cork, Munster, Éire / Ireland with 7 numbered planning items
    ⌖ the houseApprovedNo decision yet
    1. 1Ballynamona, Mitchelstown 26/0125Approved with conditions · 778 m
    2. 2Stonehaven, Pollardstown 26/1124Approved with conditions · 988 m
    3. 3Killakane, Mitchelstown 25/6739Approved with conditions · 995 m
    4. 4Killakane, Mitchelstown 25/6442Approved with conditions · 1.3 km
    5. 5Pollardstown, Mitchelstown 26/0611Approved with conditions · 1.3 km
    6. 6Corracunna, Mitchelstown 26/0646No decision yet · 1.5 km
    7. 7Corracunna, Mitchelstown 25/6426Approved with conditions · 1.6 km
    Figure 4

    The next 30 days

    Nothing closes within 2.0 km in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Every application within 2.0 km 9 in the last 12 months

      See every application on the map

      • 2Stonehaven, Pollardstown, Mitchelstown, P67 TR88 Approved with conditions
        The development will consist of the construction of a single storey extension to the rear, modifications to…
        26/112431 Aug 2026988 m
      • 6Corracunna, Mitchelstown, Cork, P67H339 No decision yet
        Permission for retention for detached domestic garage as constructed on site and permission for new extension…
        26/064616 Mar 20261.5 km
      • 5Pollardstown, Mitchelstown, Co. Cork Approved with conditions
        Permission for the change of house type permitted under granted planning application No. 24/6051. This…
        26/06115 May 20261.3 km
      • 1Ballynamona, Mitchelstown, Co.Cork Approved with conditions
        to construct a single storey dwelling, garage, treatment unit with percolation, entrance and ancillary works
        26/01252 Jun 2026778 m
      • Glenatlucky, Mitchelstown, Co. Cork Withdrawn or not valid
        Permission to :- (a) construct a new dwelling house, (b) modify an existing entrance, (c) install a new…
        25/692420 Dec 20252.0 km
      • 3Killakane, Mitchelstown, Cork, P67KH73 Approved with conditions
        Permission for Retention of 1) Kitchen extension Constructed to the rear of the dwelling, 2) Detached Garage…
        25/67399 Feb 2026995 m
      • 4Killakane, Mitchelstown, Co.Cork Approved with conditions
        Permission for demolition for existing two weaner/finisher sheds. Permission to construct fattening houses…
        25/644225 May 20261.3 km
      • 7Corracunna, Mitchelstown, Co. Cork, P67 KV27. Approved with conditions
        Permission to construct a single storey extension to side of existing dwelling and ancillary works
        25/642613 Jan 20261.6 km
      • Killkane, Mitchelstown, Co.Cork Withdrawn or not valid
        Permission for demolition for existing two weaner/finisher sheds. Permission to construct fattening houses…
        25/624420 Oct 20251.3 km
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      Building work nearby 4 in the last 12 months
      1 not signed off3 no sign-off needed
      • Ballynamona, Mitchelstown, Cork · 5 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 26/0125 · 1.2 km
      • Sliabh Alainn, Mitchelstown, Cork · 3 Jan 2026 · 43 homes · start notice not signed off · 2306542 · 2.0 km
      • Pollardstown, Mitchelstown, Cork · 20 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 254495 · 962 m
      • Pollardstown, Mitchelstown, Cork · 20 Nov 2025 · short notice no sign-off needed · 254495 · 961 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      How busy is this area About as busy as most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here1
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Question 5

      What's the area like?

      Figure 5

      This street block against the council

      86% owner-occupied (council 73%).

      Homes built before 1971
      21% · council 28%
      Homes built since 2001
      39% · council 36%
      Owner-occupied
      86% · council 73%
      Rented
      9% · council 22%
      Children under 15
      20% · council 21%
      Aged 65 and over
      14% · council 16%
      Households with 2+ cars
      67% · council 52%
      Work mainly from home
      12% · council 12%
      This small area (270 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047258002

      Schools, stops and the council

      Schools

      None nearby.

        Stops 0

          Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
          SourceLicenceFetchedLink
          Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
          Department of Education school listCC BY 4.027 Sept 2026, 23:32open
          Council consultation portalsPublic17 Oct 2026, 01:36open
          Council meetings (ModernGov)Public17 Oct 2026, 02:12open
          Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
          cso_saps_2022CC BY 4.0—open
          National Transport AuthorityCC BY 4.0——
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
          EPA strategic noise mapsCC BY 4.0——
          Fingal County CouncilCC BY 4.0——
          Question 6

          What to ask, and who

          1. Inside Flood Zone A on the council's development plan map: can you insure it?
            Ask for: A home insurance quote before you bid, and any flood risk assessment in the site's planning file.
            Insurer
          2. Zoned G3 (high amenity), not for homes: could you extend?
            Ask for: A solicitor's or planner's view.
            Solicitor · planner
          3. Any work done without planning permission?
            Ask for: An opinion of compliance for the whole house.
            Seller · solicitor
          Reference

          Where this is, the terms, the sources

          Townland
          Pollardstown
          Electoral division
          Mitchelstown
          Electoral area
          Fermoy
          Council
          Cork County Council
          Everything we found, as a list 8 lines
          • Zoned G3 (high amenity); no vacant land tax.
          • Inside Flood Zone A on the Cork County Development Plan 2022-2028 flood map.
          • Nothing nearby looks set to change.
          • No scheduled public transport within 800 m.
          • Here (2022 census): 86% owner-occupied (council 73%); 10% of homes empty (council 13%); most built 2001–2010; 64% drive to work (council 66%); population up 2% since 2016.
          • Around here the council decides in a median 104 days (about 15 weeks).
          • 9 applications nearby in the last 12 months; 100% approved (council 92%).
          • 1 homes started within 1 km in 3 years (council middle 1).
          What the terms mean 5 terms
          • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
          • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
          • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
          • Approved (Grant of permission): The council said yes, usually with conditions.
          • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
          Sources and licences 26
          SourcePublisherLicenceFetched
          EPA strategic noise maps—CC BY 4.0—
          Fingal County Council—CC BY 4.0—
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
          National Transport Authority—CC BY 4.0—
          services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
          data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
          data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
          services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
          services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
          dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
          www2.courts.ie—© the publisher17 Oct 2026
          cso.ie—CC BY 4.0—
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
          services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
          services-eu1.arcgis.com—CC BY 4.0—
          transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
          lda.ieLand Development AgencyCC BY 4.011 Sept 2026
          meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
          services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
          services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
          services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
          propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
          services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
          gov.ieDepartment of EducationCC BY 4.027 Sept 2026
          gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
          services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
          Measured
          counted from a public register
          Calculated
          a rate or median we worked out from those counts
          Our classification
          we sorted it by reading each description
          Estimate
          inferred from another source (census, map data)
          Rule summary
          the law, simplified: check before relying on it
          How we work this out
          Generated 17 Oct 2026, 06:47 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.