PlanningRegister.ie
Planning report · Kerry County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 05:11

Killerisk Road

52.26109, -9.68636

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (94%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KillieriskBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2022: 1 file on Killierisk2023: 2 files on Killierisk3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
C2.1
Zoning · Economic development and employment
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningC2.1 · Economic development and employment
What it says

Industrial, Enterprise, Employment: For the provision of Industrial, Enterprise, Employment

Zoned for employment uses. Housing is not the intended use here.

tralee municipal district settlements s plan variation no 1 of the kcdp 2022 2028 · 21 Jul 2025 – 14 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings11Tralee Infantry Barracks
Monuments9Castle - tower house; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 36 on the draft 2027 map; 28 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 94% approved, and 1 in 4 is asked for more information.

Single-storey rear10 decided · more info asked 20%
100% · council 98%
New house in a garden or site32 decided · more info asked 28%
94% · council 86%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 42 nearby, 2,095 council-wide

Figure 3

Killierisk, file by file since 2022

1 of 1 decided extensions on the road were approved.

3 planning files on Killierisk since 2022, by kind and decision.20222023202420252026Extensions, atticsNo number · 2023 · single-storey rear · approved · 2360125Porches, roofs, otherNo number · 2022 · other work · approved · 22407No number · 2023 · other work · approved · 23599New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Killierisk" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 refused2 no decision or withdrawn
KindAppliedApprovedRefused
Other301

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 79 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 130 days; Appeal window: 4 weeks; Building starts: 150 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=54)55 daysIf more info asked (1 in 6)With further information: median 130 days (n=12)130 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 150 days after permission (n=20)150 days after permissionSigned off62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated66 decided home extensions, 21 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    4 of 9 appealed refusals became permissions. 1 of 14 appealed approvals were reversed.

    Refusals appealed9 decided
    4 became permissions
    Approvals appealed14 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Killerisk Road with 11 numbered planning items
    ⌖ the houseOpen for commentsRefusedEmpty land zoned for homesApprovedNo decision yet
    1. 1Killierisk Road, Killierisk 2661009No decision yet · 0 m
    2. 29 Maple Court, Tralee 2660178Refused · 114 m
    3. 31.4 ha zoned for homesEmpty land zoned for homes · 14 m
    4. 40.9 ha zoned for homesEmpty land zoned for homes · 45 m
    5. 511.9 ha zoned for homesEmpty land zoned for homes · 77 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 134 m
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 135 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 135 m
    9. 914 Manor Lawn, Manor Village Tralee 2660734Approved with conditions · 408 m
    10. 10No. 7 Haig's Terrace, Manor West 2660545No decision yet · 435 m
    11. 11Kellihers Garage, Rathass 26113Approved with conditions · 462 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 34 permissions since 2016, 8 show a start notice and 1 has a completion certificate.

    35 applications lodged within 500 m. Council: 33 approved, 2 refused. After appeals: 34 approved. Of those: 1 signed off, 4 built with the owner's opt-out, 3 started, 21 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved2: lodged → refused33: approved → approved1: refused → refused1 refused by the council, approved after an appeal21: approved → no start notice found4: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off5: approved → ran out35 lodged35 lodged33 approved33 approved2 refused2 refused34 approved34 approved1 refused1 refused21 no start notice found21 no start notice found4 built, owner opted out4 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured35 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 17 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-17 2661009: application received — CHANGE OF USE FROM WAREHOUSING/STORAGE/DISTRIBUTION AS GRANTED UNDER PLANNING REF NO. 23/599 TO FOOD MANUFACTURING, STOtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2661009: application received — CHANGE OF USE FROM WAREHOUSING/STORAGE/DISTRIBUTION AS GRANTED UNDER PLANNING REF NO. 23/599 TO FOOD MANUFACTURING, STO · 0 m away · 2026-11-17
    Comments close
    • Comments close 17 Nov 202616 days left
      12661009 · application received — CHANGE OF USE FROM WAREHOUSING/STORAGE/DISTRIBUTION AS GRANTED UNDER PLANNING REF NO. 23/599 TO…
      €20 to the council · 0 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 31.4 ha zoned for homes · no homes built on it yet · 14 m
    • 40.9 ha zoned for homes · no homes built on it yet · 45 m
    • 511.9 ha zoned for homes · no homes built on it yet · 77 m
    • 60.3 ha zoned for homes · no homes built on it yet · 134 m
    • 70.3 ha zoned for homes · no homes built on it yet · 135 m
    • 80.2 ha zoned for homes · no homes built on it yet · 135 m
    • 0.1 ha zoned for homes · no homes built on it yet · 148 m
    • 0.3 ha zoned for homes · no homes built on it yet · 157 m
    • 1.9 ha zoned for homes · no homes built on it yet · 171 m
    • 1.4 ha zoned for homes · no homes built on it yet · 175 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 3 and 6 a year; busiest 2022. 94% of decisions were approvals.

    2021: 11, 2022: 6, 2023: 6, 2024: 3, 2025: 6, 2026: 3051015202021: 10 approved2021: 1 refused11’21*2022: 6 approved6’222023: 6 approved6’232024: 3 approved3’242025: 6 approved6’252026: 2 approved2026: 1 refused3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Killierisk Road , Killierisk , Tralee comments close 17 Nov 2026
      CHANGE OF USE FROM WAREHOUSING/STORAGE/DISTRIBUTION AS GRANTED UNDER PLANNING REF NO. 23/599 TO FOOD…
      266100913 Oct 20260 m
    Every application within 500 m 7 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • 13 Manor Lawn, Tralee, Kerry · 4 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60852 · 416 m
    • 22 Manor Drive, Tralee, Kerry, V92 D8N2 · 11 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 23/330 · 390 m
    • Rathass, Tralee, Kerry, V92AK72 · 26 Jan 2026 · start notice not signed off · 24/447 · 496 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Coco’s Creche & Pre- school · Crèche14 Feb 2023 · report · Tusla Early Years Inspectorate319 m
    St. Brigid's Pre- school Crèche · Crèche29 Oct 2025 · report · Tusla Early Years Inspectorate722 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Kerry County Council.
    Homes approved
    Here177
    Council middle0
    Homes started
    Here216
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    15% of homes built before 1971 (council 26%). 50% owner-occupied (council 70%).

    Homes built before 1971
    15% · council 26%
    Homes built since 2001
    28% · council 32%
    Owner-occupied
    50% · council 70%
    Rented
    45% · council 24%
    Children under 15
    16% · council 18%
    Aged 65 and over
    20% · council 19%
    Households with 2+ cars
    34% · council 44%
    Work mainly from home
    8% · council 11%
    This small area (412 people)Kerry

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077160037

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    469 m
    Manor West · 283, TT02 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    647 m
    Gaelcholáiste Chiarraí, 312 pupils
    Schools, stops and the council

    Schools

    • Gaelcholáiste Chiarraí · postprimary · 312 pupils · 647 m

    Stops 9

    • Manor West · 283, TT02 · 1/hour at peak · 469 m
    • Manor West · TT02 · 472 m
    • Univ Hosp Kerry · 290A, 290B · 1/hour at peak · 543 m
    • D Spring Rd · 290B · 1/hour at peak · 694 m
    • Univ Hosp Kerry · 271, 273, 278, 279, 279A, 283 · 3/hour at peak · 730 m
    • Univ Hosp Kerry · 271, 273, 274, 278, 279, 279A · 2/hour at peak · 733 m
    • Manor West · 290B · 1/hour at peak · 756 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Gaelcholáiste Chiarraí · 647 m-5.2% pupils (312)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned C2.1 (economic development and employment), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 0 m away open for comments until 17 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Killierisk
    Electoral division
    Tralee Rural
    Electoral area
    Tralee
    Council
    Kerry County Council
    Everything we found, as a list 8 lines
    • Zoned C2.1 (economic development and employment); no vacant land tax.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 17 Nov 2026.
    • Manor West (bus 283, TT02) 469 m away: 7 a day, fewer than one an hour at morning peak.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 50% owner-occupied (council 70%); 9% of homes empty (council 22%); most built 1991–2000; 63% drive to work (council 62%); population up 7% since 2016.
    • 3 home extensions within 250 m since 2025. 1 extension refused.
    • Around here the council decides in a median 55 days (about 8 weeks); 37% are asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 05:11 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.