Planning report · Wexford County Council · 500 m around the house · the last 12 months · 9 Oct 2026, 20:28

The Green, Wexford

52.32550, -6.49573

Homes here mostly date from the 2000s. 4 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (93%).

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 4 planning files on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 4 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Clonard LittleBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 20210251 · change of use, approved2020: 20201079 · full planning permission, approved2018: 20180796 · change of use, approved2018: 20180716 · change of use, withdrawn or invalid2016: 4 files on Clonard Little2017: 3 files on Clonard Little2018: 7 files on Clonard Little2020: 5 files on Clonard Little2021: 10 files on Clonard Little2022: 4 files on Clonard Little2023: 3 files on Clonard Little2024: 1 file on Clonard Little2025: 1 file on Clonard Little2026: 3 files on Clonard Little41 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    20210251 · change of use · approved 2021 · built, signed off
    approvedstartedsigned off
  2. 2020
    20201079 · full planning permission · approved 2020 · ran out unbuilt
    approvedstartedsigned off
  3. 2018
    20180796 · change of use · approved 2018 · ran out unbuilt
    approvedstartedsigned off
  4. 2018
    20180716 · change of use · withdrawn
    approved?started?signed off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Carl Zeiss Vision Ireland Limited (650 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings3Alexandra House; farm house
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, epa_leap, rzlt, constraints, constraints.niah · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 8 Oct 2026, 06:04
SourceLicenceFetchedLink
bcmsCC-BY-4.08 Oct 2026, 06:04open
npadCC-BY-4.09 Oct 2026, 01:41open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 64% approved, and 1 in 4 is asked for more information.

New house in a garden or site36 decided · more info asked 28%
64% · council 75%
Approved nearbyWexford overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 36 nearby, 3,784 council-wide

Figure 3

Clonard Little, file by file since 2016

3 of 5 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

41 planning files on Clonard Little since 2016, by kind and decision.20162017201820192020202120222023202420252026Extensions, atticsNo number · 2018 · first-floor · approved · 20180479No number · 2021 · rear · refused · 20210459No number · 2021 · other extension · approved · 20211365No number · 2023 · other extension · refused · 20230125No number · 2024 · other extension · approved · 20241243Porches, roofs, otherNo number · 2016 · other work · approved · 20160266No number · 2016 · other work · approved · 20160687No number · 2016 · other work · approved · 20160705No number · 2016 · other work · refused · 20161417No number · 2017 · other work · refused · 20170712No number · 2017 · other work · refused · 20171345No number · 2017 · other work · approved · 20171663No number · 2018 · other work · approved · 20180014No number · 2018 · other work · refused · 20180773No number · 2018 · other work · approved · 20180796No number · 2018 · other work · approved · 20180941No number · 2018 · other work · approved · 20180944No number · 2018 · other work · refused · 20181559No number · 2020 · other work · approved · 20200750No number · 2020 · other work · approved · 20201079No number · 2020 · other work · approved · 20201207No number · 2021 · other work · approved · 20210251No number · 2021 · other work · approved · 20210784No number · 2021 · other work · approved · 20210838No number · 2021 · other work · approved · 20211393No number · 2021 · other work · approved · 20211395No number · 2021 · other work · refused · 20211648No number · 2021 · other work · approved · 20211750No number · 2021 · other work · approved · 20212035No number · 2022 · other work · refused · 20220780No number · 2022 · other work · refused · 20220788No number · 2022 · other work · approved · 20221485No number · 2022 · other work · approved · 20221652No number · 2023 · other work · refused · 20230678No number · 2023 · other work · approved · 20231124No number · 2025 · other work · approved · 20251734No number · 2026 · other work · refused · 20260021No number · 2026 · other work · refused · 20260022No number · 2026 · other work · approved · 20260034New house in a side gardenNo number · 2020 · new house · refused · 20200521No number · 2020 · new house · approved · 20201188
ApprovedRefusedWithdrawn or invalid

41 files with "Clonard Little" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2016–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 9 Oct 2026, 01:41
    SourceLicenceFetchedLink
    npadCC-BY-4.09 Oct 2026, 01:41open
    acpCC-BY-4.02 Oct 2026, 23:01open
    Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    npadCC-BY-4.09 Oct 2026, 01:41open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 8 is asked for more information, which adds about 70 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 8): 124 days; Appeal window: 4 weeks; Building starts: 84 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 47–53 (n=64)50 daysIf more info asked (1 in 8)With further information: median 124 days (n=9)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 84 days after permission (n=22)84 days after permissionSigned off55% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated73 decided home extensions, 22 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    4 of 11 appealed refusals became permissions. 2 of 8 appealed approvals were reversed.

    Refusals appealed11 decided
    4 became permissions
    Approvals appealed8 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501060 Refused · Clonard Little, Wexford Rural, Co. Wexford. · 245 m
    • 501059 Refused · Clonard Little, Wexford Rural · 222 m
    Sources: acp, courts, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    courtsall-rights-reserved9 Oct 2026, 01:23open
    npadCC-BY-4.09 Oct 2026, 01:41open
    Question 4

    What's changing around you?

    Street map around The Green, Wexford with 9 numbered planning items
    ⌖ the houseLarge schemeApprovedNo decision yet
    1. 1Clonard Little, Wexford Rural 20260021Refused · 222 m
    2. 2Clonard Little, Wexford Rural 20260022Refused · 245 m
    3. 3Killeens, Wexford Rural 20260966Refused · 423 m
    4. 4Clonard Little, Wexford Rural 20251734Approved with conditions · 272 m
    5. 5Clonard Great / Killeens, Wexford Rural 20260553Approved with conditions · 311 m
    6. 6Clonard Little / Clonard Great, Wexford Rural 20260034Approved with conditions · 313 m
    7. 7Killeens, Wexford Rural 20260457Approved with conditions · 488 m
    8. 8Killeens, Wexford Rural 20251668Approved with conditions · 489 m
    9. 9Clonard Little, Wexford Rural 20260345No decision yet · 489 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 44 permissions since 2016, 13 show a start notice and 7 have a completion certificate.

    63 applications lodged within 500 m. Council: 44 approved, 19 refused. After appeals: 44 approved. Of those: 7 signed off, 2 built with the owner's opt-out, 4 started, 22 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT44: lodged → approved19: lodged → refused43: approved → approved18: refused → refused1 approved by the council, refused after an appeal1 refused by the council, approved after an appeal22: approved → no start notice found2: approved → built, owner opted out4: approved → started, not signed off7: approved → signed off9: approved → ran out63 lodged63 lodged44 approved44 approved19 refused19 refused44 approved44 approved19 refused19 refused22 no start notice found22 no start notice found2 built, owner opted out2 built, owner opted out4 started, not signed off4 started, not signed off7 signed off7 signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured63 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 2 and 11 a year; busiest 2021. 70% of decisions were approvals.

      2016: 1, 2017: 4, 2018: 10, 2019: 2, 2020: 8, 2021: 11, 2022: 8, 2023: 7, 2024: 2, 2025: 4, 2026: 6051015202016: 1 refused1’16*2017: 2 approved2017: 2 refused4’172018: 8 approved2018: 2 refused10’182019: 1 approved2019: 1 refused2’192020: 7 approved2020: 1 refused8’202021: 8 approved2021: 3 refused11’212022: 5 approved2022: 3 refused8’222023: 4 approved2023: 3 refused7’232024: 2 approved2’242025: 4 approved4’252026: 3 approved2026: 3 refused6’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 9 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 9 Oct 2026, 01:41
      SourceLicenceFetchedLink
      npadCC-BY-4.09 Oct 2026, 01:41open
      acpCC-BY-4.02 Oct 2026, 23:01open
      bcmsCC-BY-4.08 Oct 2026, 06:04open
      Building work nearby 3 in the last 12 months
      3 not signed off
      • Beechfield Place, Wexford · 14 Aug 2026 · start notice not signed off · 20221652-LRD · 464 m
      • Unit S4, Clonard Village,, Wexford, Y35 DYX5 · 6 Mar 2026 · start notice not signed off · 20210251 · 20 m
      • Killeens Lane, Wexford · 6 Feb 2026 · 60 homes · start notice not signed off · LAC2305 · 493 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 8 Oct 2026, 06:04
      SourceLicenceFetchedLink
      bcmsCC-BY-4.08 Oct 2026, 06:04open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 2 Oct 2026, 23:01
      SourceLicenceFetchedLink
      acpCC-BY-4.02 Oct 2026, 23:01open
      bcmsCC-BY-4.08 Oct 2026, 06:04open
      npadCC-BY-4.09 Oct 2026, 01:41open
      social_housingCC-BY-SA-4.025 Sept 2026, 20:56open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Clonard Village · 16 applications in 10 years · 83% approved

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Scholars Montessori · Crèche9 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 421 m
      Rainbow Childcare · Crèche12 Dec 2024 · report · Tusla Early Years Inspectorate577 m
      Rainbow Childcare · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorate577 m
      Bright Start Creche · Crèche15 Feb 2024 · report · Tusla Early Years Inspectorate617 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
      SourceLicenceFetchedLink
      estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
      How busy is this area Busier than most of Wexford County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here494
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
      SourceLicenceFetchedLink
      acpCC-BY-4.02 Oct 2026, 23:01open
      bcmsCC-BY-4.08 Oct 2026, 06:04open
      npadCC-BY-4.09 Oct 2026, 01:41open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      0% of homes built before 1971 (council 25%). 18% owner-occupied (council 70%).

      Homes built before 1971
      0% · council 25%
      Homes built since 2001
      86% · council 38%
      Owner-occupied
      18% · council 70%
      Rented
      74% · council 24%
      Children under 15
      19% · council 20%
      Aged 65 and over
      4% · council 17%
      Households with 2+ cars
      24% · council 46%
      Work mainly from home
      4% · council 10%
      This small area (220 people)Wexford

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 247117029

      Bus
      80 m
      Clonard Vllge · 875, WX1 · busiest stop within 500 m: 2 an hour at peak
      Nearest school
      641 m
      Wexford Educate Together National School, 191 pupils
      Schools, stops and the council

      Schools

      • Wexford Educate Together National School · primary · 191 pupils · 641 m
      • Loreto Secondary School · postprimary · 930 pupils · 741 m

      Stops 6

      • Clonard Vllge · 875, WX1 · 2/hour at peak · 80 m
      • Clonard Vllge · 875, 877, WX2 · 2/hour at peak · 87 m
      • Killeens · WX2 · 1/hour at peak · 573 m
      • Loreto School · 877, WX1 · 2/hour at peak · 663 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Wexford Educate Together National School · 641 m-6.8% pupils (191)
      • Loreto Secondary School · 741 m0% pupils (930)
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
      SourceLicenceFetchedLink
      gtfsCC-BY-4.04 Oct 2026, 23:41open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.09 Oct 2026, 01:41open
      consultpublic9 Oct 2026, 01:21open
      moderngovpublic9 Oct 2026, 01:22open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Full planning permission (20201079) ran out unbuilt in 2025: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      2. Change of use (20180796) ran out unbuilt in 2023: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Clonard Little
      Electoral division
      Wexford Rural
      Electoral area
      Wexford
      Council
      Wexford County Council
      Everything we found, as a list 8 lines
      • 4 applications on this site; latest 20210251, approved 2021, built, signed off.
      • Not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • Clonard Vllge (bus 875, WX1) 80 m away: 2 an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 74% rent (council 24%); 10% of homes empty (council 16%); most built 2001–2010; 57% drive to work (council 65%); population up 14% since 2016.
      • The council decides in a median 54 days (about 8 weeks); 38% are asked for more information.
      • Homes started within 1 km: 61 in the last year, 99 three years before.
      • 9 applications nearby in the last 12 months; 62% approved (council 84%).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.02 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.08 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public9 Oct 2026
      www2.courts.ie—all-rights-reserved9 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public9 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.09 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…9 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.025 Sept 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 9 Oct 2026, 20:28 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.