Planning report · Cork County Council · 500 m around the house · the last 12 months · 9 Oct 2026, 14:01
Bakers Lane
52.35331, -8.67697
Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2007. Home extensions nearby almost always get approved (96%). 2 applications nearby open for comments.
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningG4 · Open spaceWhat it says
Green Infrastructure includes 3 subcategories - Green Recreational (GR), Green Conservation (GC) and Green Active (GA)
Open space and recreational amenity, to be preserved as such.
cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Kerry Ingredients (Ireland) Limited (Charleville) (634 m)
Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 m
Count
For example
Heritage inventory buildings
35
house; Aisling
Monuments
10
Graveyard; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Nothing on this site restricts it: not protected, not in a conservation area.
Figure 2
What happened to applications like yours
Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 82% approved.
0%50%100%
Single-storey rear14 decided · more info asked 7%
100% · council 99%
New house in a garden or site17 decided · more info asked 0%
82% · council 86%
Approved nearbyCork overall
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 31 nearby, 8,945 council-wide
Figure 3
Rathgoggan Middle, file by file since 2003
33 of 33 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 4.
ApprovedRefusedWithdrawn or invalid
257 files with "Rathgoggan Middle" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2003–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Permission isn't building. Of 36 permissions since 2016, 2 show a start notice and 0 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured88 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
Figure 6
The next 30 days
2 deadlines within 500 m; the first closes 14 Oct 2026.
Comments close
Comments close 14 Oct 20265 days left
226/2356 · application received — ‘Permission’ to construct a single storey extension to the front of the existing dwelling house…
€20 to the council · 319 m away
Comments close 15 Oct 20266 days left
126/2365 · application received — retention permission for: a) The change of use of Unit 15 at ground floor level from gym to a…
€20 to the council · 214 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Figure 7
Applications within 500 m, by year
Between 5 and 13 a year; busiest 2025. 88% of decisions were approvals.
ApprovedRefusedWithdrawn or invalidUndecided
2016 and 2026 are part years (*). Exemption requests and time extensions are left out.
Permission for the construction of a new relocated vehicular entrance & modification to existing entrance to…
25/630829 Oct 20250 m
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 9 Oct 2026, 01:41
Units 2-3 Charleville Town Centre, Charleville, Cork · 28 Jul 2026 · 7-day notice not signed off · 23/6010 · 238 m
2 Broad Street, Charleville, Cork, P56 P223 · 13 Jul 2026 · 7-day notice not signed off · 25/4774 · 400 m
Main Street, Charleville, Cork, P56 WR04 · 23 Mar 2026 · 7-day notice not signed off · 254512 · 297 m
Nos. 9 & 10 The Monastery, Clancy Terrace, Charleville, Cork · 23 Mar 2026 · 23 homes · start notice not signed off · 24-06337 · 428 m
MD O'Shea's Hardware, Baker's Road, Charleville, Cork, P56AN23 · 19 Jan 2026 · 7-day notice not signed off · 246018 · 386 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
How busy is this area Busier than most of Cork County Council.
Homes approved
Here0
Council middle0
Homes started
Here27
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
39% of homes built before 1971 (council 28%). 76% owner-occupied (council 73%).
Homes built before 1971
39% · council 28%
Homes built since 2001
18% · council 36%
Owner-occupied
76% · council 73%
Rented
16% · council 22%
Children under 15
17% · council 21%
Aged 65 and over
20% · council 16%
Households with 2+ cars
55% · council 52%
Work mainly from home
11% · council 12%
This small area (206 people)Cork
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047090013/02/047090014
Bus
402 m
Charleville · 320, 325, 51 · busiest stop within 500 m: 2 an hour at peak
Nearest school
205 m
Scoil na mBráithre Chríostaí, 313 pupils
Schools, stops and the council
Schools
Scoil na mBráithre Chríostaí · postprimary · 313 pupils · 205 m
Scoil na mBraithre Boys Snr Sch · primary · 227 pupils · 253 m
Holy Family S S · primary · 87 pupils · 317 m
Scoil Naomh Aine Girls Senior School · primary · 195 pupils · 623 m
St Josephs Convent NS · primary · 190 pupils · 628 m
St. Mary's Secondary School · postprimary · 322 pupils · 700 m
Stops 2
Charleville · 320, 325, 51, 521, 522 · 2/hour at peak · 402 m
Charleville · 320, 51, 519, 521, 522 · 1/hour at peak · 406 m
Schools growing or shrinking planning in 3 years · pupils last year
Scoil na mBráithre Chríostaí · 205 m+3.6% pupils (313)
Scoil na mBraithre Boys Snr Sch · 252 m+1.8% pupils (227)
Holy Family S S · 317 m+2.4% pupils (87)
Scoil Naomh Aine Girls Senior School · 623 m-0.5% pupils (195)
St Josephs Convent NS · 628 m-10.8% pupils (190)
St. Mary's Secondary School · 700 m+6.6% pupils (322) · an extension 2024, approved with conditions
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)
CC BY 4.0
—
—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)
CC BY 4.0
—
—
EPA strategic noise maps
CC BY 4.0
—
—
Fingal County Council
CC BY 4.0
—
—
Question 6
What to ask, and who
Construction of sports (07/4079) approved 2007: built as approved?
Ask for: The grant and an opinion of compliance.
Seller · solicitor
Extension (05/1840) approved 2005: built as approved?
Ask for: The grant and an opinion of compliance.
Seller · solicitor
Zoned G4 (open space), not for homes: could you extend?
Ask for: A solicitor's or planner's view.
Solicitor · planner
Application 214 m away open for comments until 15 Oct 2026: comment?
Ask for: The plans on the council's website (€20 to comment).
Council
Any work done without planning permission?
Ask for: An opinion of compliance for the whole house.
Seller · solicitor
Reference
Where this is, the terms, the sources
Townland
Rathgoggan Middle
Electoral division
Rathluirc
Electoral area
Kanturk
Council
Cork County Council
Everything we found, as a list 8 lines
2 applications on this site; latest 07/4079, approved 2007, built? unknown.
Zoned G4 (open space); no vacant land tax.
Nothing nearby looks set to change.
2 applications open for comments nearby; nearest closes 15 Oct 2026.
Charleville (bus 320, 325) 402 m away: 2 an hour at morning peak.
Here (2022 census): 76% owner-occupied (council 73%); 6% of homes empty (council 13%); most built before 1919; 63% drive to work (council 66%); population up 4% since 2016.
The council decides in a median 66 days (about 9 weeks).
Homes started within 1 km: 23 in the last year, 119 three years before.
What the terms mean 7 terms
Vacant land tax(Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
Building started(Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
Signed off as finished(Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
Approved(Grant of permission): The council said yes, usually with conditions.
Approval ran out without being built(Permission lapsed / expired): Most permissions last five years.
Comment on an application(Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
What the land is zoned for(Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 27
Source
Publisher
Licence
Fetched
EPA strategic noise maps
—
CC BY 4.0
—
Fingal County Council
—
CC BY 4.0
—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)