PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 30 Oct 2026, 01:12

Smiths Lane

52.35484, -8.68614

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2022. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 90 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Rathgoggan MiddleBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 22/5850 · permission to construct, approved2021: 8 files on Rathgoggan Middle2022: 15 files on Rathgoggan Middle2023: 14 files on Rathgoggan Middle2024: 18 files on Rathgoggan Middle2025: 15 files on Rathgoggan Middle2026: 8 files on Rathgoggan Middle78 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    22/5850 · permission to construct · approved 2022 · not started, runs out 2027
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory2 within 100 m Convent of Mercy; store/warehouse

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Kerry Ingredients (Ireland) Limited (Charleville) (702 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings58Holy Cross Catholic Church; presbytery/parochial/curate's house
Monuments11Mill - corn; Post office
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 6 on the draft 2027 map; 6 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 23:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 75% approved.

New house in a garden or site12 decided · more info asked 0%
75% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 12 nearby, 4,502 council-wide

Figure 3

Rathgoggan Middle, file by file since 2021

12 of 12 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 6.

78 planning files on Rathgoggan Middle since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 12 · 2021 · porch / front · undecided · 21/4264No. 12 · 2021 · porch / front · approved · 21/4868No. 3 · 2021 · single-storey rear · approved · 21/5476No number · 2021 · other extension · approved · 21/7240No number · 2022 · other extension · approved · 22/4996No number · 2022 · porch / front · approved · 22/5132No. 100 · 2022 · rear · approved · 22/5377No number · 2022 · other extension · approved · 22/6272No number · 2023 · garage conversion · undecided · 23/5267No number · 2023 · garage conversion · approved · 23/5478No number · 2025 · two-storey rear · undecided · 25/4037No number · 2025 · other extension · undecided · 25/4137No number · 2025 · two-storey rear · approved · 25/4179No number · 2025 · other extension · approved · 25/4512No. 2 · 2025 · rear · undecided · 25/4575No. 2 · 2025 · rear · approved · 25/4774No number · 2026 · two-storey rear · approved · 26/0747Porches, roofs, otherNo number · 2021 · other work · undecided · 21/5382No number · 2021 · other work · approved · 21/5715No number · 2021 · other work · refused · 21/5885No number · 2022 · other work · approved · 22/4226No number · 2022 · other work · undecided · 22/5077No. 2 · 2022 · other work · approved · 22/5830No number · 2022 · other work · approved · 22/5850No. 21 · 2022 · other work · approved · 22/5914No. 3 · 2022 · other work · undecided · 22/6016No. 3 · 2022 · other work · approved · 22/6215No number · 2023 · other work · undecided · 23/4462No number · 2023 · other work · approved · 23/4465No number · 2023 · other work · undecided · 23/5159No number · 2023 · other work · undecided · 23/5348No number · 2023 · other work · undecided · 23/5504No. 3 · 2023 · other work · undecided · 23/5604No number · 2023 · other work · approved · 23/5759No. 3 · 2023 · other work · approved · 23/6010No number · 2023 · other work · refused · 23/6438No. 3 · 2023 · other work · undecided · 23/6441No. 3 · 2023 · other work · refused · 23/6604No. 1 · 2024 · other work · undecided · 24/4411No number · 2024 · other work · undecided · 24/4654No. 1 · 2024 · other work · undecided · 24/4759No. 35 · 2024 · other work · undecided · 24/4792No. 1 · 2024 · other work · undecided · 24/4902No number · 2024 · other work · undecided · 24/5307No number · 2024 · other work · refused · 24/5474No number · 2024 · other work · undecided · 24/5809No number · 2024 · other work · undecided · 24/5890No number · 2024 · other work · undecided · 24/5961No number · 2024 · other work · approved · 24/6137No number · 2024 · other work · approved · 24/6247No number · 2024 · other work · approved · 24/6337No number · 2024 · other work · undecided · 24/6515No number · 2025 · other work · undecided · 25/4119No number · 2025 · other work · approved · 25/4230No. 2 · 2025 · other work · undecided · 25/4433No number · 2025 · other work · approved · 25/4913No number · 2025 · other work · approved · 25/5375No number · 2025 · other work · approved · 25/5805No. 5 · 2025 · other work · undecided · 25/6301No number · 2025 · other work · undecided · 25/6588No number · 2026 · other work · undecided · 26/1406No number · 2026 · other work · approved · 26/1551No. 19 · 2026 · other work · undecided · 26/1909No. 19 · 2026 · other work · undecided · 26/2139No. 19 · 2026 · other work · undecided · 26/2292No. 19 · 2026 · other work · undecided · 26/2365No. 9 · 2026 · other work · undecided · 26/2706New house in a side gardenNo number · 2021 · new house · approved · 21/6397No number · 2022 · new house · approved · 22/4125No number · 2022 · new house · undecided · 22/4439No number · 2022 · new house · undecided · 22/4646No number · 2022 · new house · approved · 22/5277No number · 2023 · new house · approved · 23/6473No number · 2024 · new house · undecided · 24/4939No number · 2024 · new house · undecided · 24/5166No number · 2024 · new house · undecided · 24/5188No number · 2024 · new house · approved · 24/5673No number · 2025 · new house · refused · 25/5761
ApprovedRefusedWithdrawn or invalid

78 files with "Rathgoggan Middle" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 90 days.

    Comments open: 5 weeks · €20; Council decision: 90 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 90 days, middle half 54–125 (n=23)90 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off0% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated23 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Smiths Lane with 10 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesApprovedNo decision yet
    1. 1Unit 9, Bakers Lane 26/2706No decision yet · 374 m
    2. 20.5 ha zoned for homesEmpty land zoned for homes · 56 m
    3. 35.5 ha zoned for homesEmpty land zoned for homes · 272 m
    4. 41.2 ha zoned for homesEmpty land zoned for homes · 303 m
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 319 m
    6. 66.2 ha zoned for homesEmpty land zoned for homes · 439 m
    7. 7Love Lane, Rathgoggan Middle 26/0747Approved with conditions · 209 m
    8. 8Belle View, Love Lane 26/1551Approved with conditions · 235 m
    9. 9Oakfield, Rathgoggan Middle 25/6641Approved · 430 m
    10. 10Smith's Road, Rathgoggan Middle 25/6588No decision yet · 440 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 33 permissions since 2016, 4 show a start notice and 0 have a completion certificate.

    77 applications lodged within 500 m. Council: 33 approved, 4 refused. After appeals: 33 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 3 started, 29 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved4: lodged → refused40: lodged → undecided33: approved → approved4: refused → refused40: undecided → undecided29: approved → no start notice found1: approved → built, owner opted out3: approved → started, not signed off77 lodged77 lodged33 approved33 approved4 refused4 refused40 undecided40 undecided33 approved33 approved4 refused4 refused40 undecided40 undecided29 no start notice found29 no start notice found1 built, owner opted out1 built, owner opted out3 started, not signed off3 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured77 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 23 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-23 26/2706: application received — Permission for a) the subdivision of existing commercial Unit 9 into two separate commercial units, to be known as Unit9today4 Nov9 Nov14 Nov19 Nov24 Nov29 Nov26/2706: application received — Permission for a) the subdivision of existing commercial Unit 9 into two separate commercial units, to be known as Unit9 · 374 m away · 2026-11-23
    Comments close
    • Comments close 23 Nov 202624 days left
      126/2706 · application received — Permission for a) the subdivision of existing commercial Unit 9 into two separate commercial…
      €20 to the council · 374 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 5 within 500 m

    Empty land zoned for homes 5

    • 20.5 ha zoned for homes · no homes built on it yet · 56 m
    • 35.5 ha zoned for homes · no homes built on it yet · 272 m
    • 41.2 ha zoned for homes · no homes built on it yet · 303 m
    • 50.4 ha zoned for homes · no homes built on it yet · 319 m
    • 66.2 ha zoned for homes · no homes built on it yet · 439 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 12 and 17 a year; busiest 2025. 89% of decisions were approvals.

    2021: 10, 2022: 12, 2023: 14, 2024: 16, 2025: 17, 2026: 8051015202021: 7 approved2021: 3 undecided10’21*2022: 10 approved2022: 2 undecided12’222023: 4 approved2023: 2 refused2023: 8 undecided14’232024: 3 approved2024: 1 refused2024: 12 undecided16’242025: 7 approved2025: 1 refused2025: 9 undecided17’252026: 2 approved2026: 6 undecided8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 4 in the last 12 months
    4 not signed off
    • Units 2-3 Charleville Town Centre, Charleville, Cork · 28 Jul 2026 · 7-day notice not signed off · 23/6010 · 410 m
    • 2 Broad Street, Charleville, Cork, P56 P223 · 13 Jul 2026 · 7-day notice not signed off · 25/4774 · 257 m
    • Nos. 9 & 10 The Monastery, Clancy Terrace, Charleville, Cork · 23 Mar 2026 · 23 homes · start notice not signed off · 24-06337 · 324 m
    • Main Street, Charleville, Cork, P56 WR04 · 23 Mar 2026 · 7-day notice not signed off · 254512 · 380 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Charleville Community Childcare CLG · Crèche21 May 2026 · report · Tusla Early Years Inspectorate288 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here61
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    24% owner-occupied (council 73%).

    Homes built before 1971
    35% · council 28%
    Homes built since 2001
    44% · council 36%
    Owner-occupied
    24% · council 73%
    Rented
    71% · council 22%
    Children under 15
    21% · council 21%
    Aged 65 and over
    12% · council 16%
    Households with 2+ cars
    7% · council 52%
    Work mainly from home
    4% · council 12%
    This small area (262 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047090010

    Bus
    242 m
    Charleville · 320, 51, 519 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    28 m
    St Josephs Convent NS, 190 pupils
    Schools, stops and the council

    Schools

    • St Josephs Convent NS · primary · 190 pupils · 28 m
    • Scoil Naomh Aine Girls Senior School · primary · 195 pupils · 34 m
    • St. Mary's Secondary School · postprimary · 322 pupils · 54 m
    • Scoil na mBraithre Boys Snr Sch · primary · 227 pupils · 450 m
    • Scoil na mBráithre Chríostaí · postprimary · 313 pupils · 472 m
    • Holy Family S S · primary · 87 pupils · 743 m

    Stops 2

    • Charleville · 320, 51, 519, 521, 522 · 1/hour at peak · 242 m
    • Charleville · 320, 325, 51, 521, 522 · 2/hour at peak · 246 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Josephs Convent NS · 28 m-10.8% pupils (190)
    • Scoil Naomh Aine Girls Senior School · 34 m-0.5% pupils (195)
    • St. Mary's Secondary School · 54 m+6.6% pupils (322) · an extension 2024, approved with conditions
    • Scoil na mBraithre Boys Snr Sch · 450 m+1.8% pupils (227)
    • Scoil na mBráithre Chríostaí · 472 m+3.6% pupils (313)
    • Holy Family S S · 743 m+2.4% pupils (87)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 01:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 23:01open
    Council consultation portalsPublic30 Oct 2026, 01:04open
    Council meetings (ModernGov)Public29 Oct 2026, 02:14open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Permission to construct (22/5850) approved 2022, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Application 374 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rathgoggan Middle
    Electoral division
    Rathluirc
    Electoral area
    Kanturk
    Council
    Cork County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 22/5850, approved 2022, not started, runs out 2027.
    • Zoned R2 (existing residential); no vacant land tax.
    • 5 sites nearby could change: 5 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 23 Nov 2026.
    • Charleville (bus 320, 325) 246 m away: 2 an hour at morning peak.
    • Here (2022 census): 71% rent (council 22%); 20% of homes empty (council 13%); most built 2001–2010; 50% drive to work (council 66%); population up 4% since 2016.
    • 1 home extension within 250 m since 2026.
    • The council decides in a median 66 days (about 9 weeks).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
    www2.courts.ie—© the publisher29 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 30 Oct 2026, 01:12 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.