PlanningRegister.ie
Planning report · Kerry County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 23:32

Kilcaragh Lawn, Lixnaw

52.40468, -9.62077

Homes here mostly date from the 2000s. 3 planning files on this house, the latest from 2022. 19 homes approved 267 m away haven't started.

See on the mapWatch this area

Not held yet for Kerry County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 3 planning files on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LixnawBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 22164 · new house, approved2019: 19453 · work already done, approved2017: 17421 · work already done, approved2017: 3 files on Lixnaw2018: 1 file on Lixnaw2019: 3 files on Lixnaw2020: 3 files on Lixnaw2021: 2 files on Lixnaw2022: 1 file on Lixnaw2023: 1 file on Lixnaw2024: 2 files on Lixnaw2025: 1 file on Lixnaw17 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    22164 · new house · approved 2022 · started, not signed off
    approvedstartedsigned off
  2. 2019
    19453 · work already done · approved 2019 · work already done
    approvedstartedsigned off?
  3. 2017
    17421 · work already done · approved 2017 · work already done
    approvedstartedsigned off?
On this site
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lixnaw (449 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Saint Michael's Catholic Church
Monuments3Ringfort - rath; R116606
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 12 on the draft 2027 map; 12 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

New house in a garden or site7 decided · more info asked 57%
100% · council 87%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 7 nearby, 3,222 council-wide

Figure 3

Lixnaw, file by file since 2017

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.

17 planning files on Lixnaw since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 211395Porches, roofs, otherNo number · 2017 · other work · approved · 171061No. 7 · 2017 · other work · approved · 171243No number · 2019 · other work · approved · 19453No. 7 · 2019 · other work · approved · 19870No number · 2019 · other work · approved · 19913No number · 2020 · other work · approved · 20517No number · 2021 · other work · approved · 21879No number · 2022 · other work · approved · 22164No number · 2023 · other work · approved · 2383No number · 2024 · other work · approved · 2460261No number · 2024 · other work · refused · 2460502No number · 2025 · other work · approved · 2560998New house in a side gardenNo number · 2017 · new house · approved · 17421No number · 2018 · new house · approved · 18468No number · 2020 · new house · approved · 201199No number · 2020 · new house · approved · 20277
ApprovedRefusedWithdrawn or invalid

17 files with "Lixnaw" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    1 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Kilcaragh Lawn, Lixnaw with 9 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesApproved
    1. 1KILCARAGH LAWN, LIXNAW 219879No decision yet · 14 m
    2. 2CLANMAURICE 2383Approved, no sign building has started · 267 m
    3. 30.3 ha zoned for homesEmpty land zoned for homes · 168 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 211 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 213 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 240 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 270 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 280 m
    9. 9New Burial Ground, Lixnaw 2560998Approved with conditions · 491 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 13 permissions since 2016, 5 show a start notice and 0 have a completion certificate.

    13 applications lodged within 500 m. Council: 13 approved, 0 refused. After appeals: 13 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 4 started, 4 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT13: lodged → approved13: approved → approved4: approved → no start notice found1: approved → built, owner opted out4: approved → started, not signed off4: approved → ran out13 lodged13 lodged13 approved13 approved13 approved13 approved4 no start notice found4 no start notice found1 built, owner opted out1 built, owner opted out4 started, not signed off4 started, not signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured13 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 27 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-27 219879: application received — CONSTRUCT 6 NO. HOUSES ON SITES 44, 45, 46, 47, 48 AND 49today25 Oct30 Oct4 Nov9 Nov14 Nov19 Nov219879: application received — CONSTRUCT 6 NO. HOUSES ON SITES 44, 45, 46, 47, 48 AND 49 · 14 m away · 2026-10-27
    Comments close
    • Comments close 27 Oct 20267 days left
      1219879 · application received — CONSTRUCT 6 NO. HOUSES ON SITES 44, 45, 46, 47, 48 AND 49
      €20 to the council · 14 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    19 homes 267 m away were approved Feb 2024 with no start notice yet; the permission runs to Feb 2029.

    CLANMAURICE · 19 homes: 19 homes approved Feb 2024, not started2024202520262027202820292030CLANMAURICE · 19 homes267 m · 238319 homes approved Feb 2024, not started19 homes approved Feb 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    • CLANMAURICE · 19 homes approved Feb 2024, not started · 267 m

    Empty land zoned for homes 10

    • 30.3 ha zoned for homes · no homes built on it yet · 168 m
    • 40.2 ha zoned for homes · no homes built on it yet · 211 m
    • 50.6 ha zoned for homes · no homes built on it yet · 213 m
    • 60.3 ha zoned for homes · no homes built on it yet · 240 m
    • 70.2 ha zoned for homes · no homes built on it yet · 270 m
    • 80.3 ha zoned for homes · no homes built on it yet · 280 m
    • 0.5 ha zoned for homes · no homes built on it yet · 289 m
    • 0.3 ha zoned for homes · no homes built on it yet · 300 m
    • 0.7 ha zoned for homes · no homes built on it yet · 322 m
    • 3.4 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2019. 100% of decisions were approvals.

    2017: 2, 2018: 1, 2019: 3, 2020: 1, 2021: 2, 2022: 1, 2023: 1, 2024: 1, 2025: 105102017: 2 approved2’17*2018: 1 approved1’182019: 3 approved3’192020: 1 approved1’202021: 2 approved2’212022: 1 approved1’222023: 1 approved1’232024: 1 approved1’242025: 1 approved1’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 2 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 2 in the last 12 months
    2 not signed off
    • Kilcaragh Lawn, Lixnaw, Kerry · 12 Nov 2025 · 6 homes · start notice not signed off · 21879 · 37 m
    • Kilcaragh Lawn, Lixnaw, Kerry · 12 Nov 2025 · 6 homes · start notice not signed off · 22164 · 42 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 19 not started
    • 2CLANMAURICE · 19 homes · not started · runs out 21 Feb 2029 · 267 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Leaders · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorateapprox. 458 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Kerry County Council.
    Homes approved
    Here19
    Council middle0
    Homes started
    Here92
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    11% of homes built before 1971 (council 26%). 45% owner-occupied (council 70%).

    Homes built before 1971
    11% · council 26%
    Homes built since 2001
    75% · council 32%
    Owner-occupied
    45% · council 70%
    Rented
    53% · council 24%
    Children under 15
    29% · council 18%
    Aged 65 and over
    9% · council 19%
    Households with 2+ cars
    34% · council 44%
    Work mainly from home
    10% · council 11%
    This small area (276 people)Kerry

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077129004

    Bus
    443 m
    Lixnaw · 272 · busiest stop within 500 m: 0 an hour at peak
    Nearest school
    577 m
    S N Mhuire De Lourdes, 104 pupils
    Schools, stops and the council

    Schools

    • S N Mhuire De Lourdes · primary · 104 pupils · 577 m

    Stops 2

    • Lixnaw · 272 · 0/hour at peak · 443 m
    • Lixnaw · 272 · 0/hour at peak · 453 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Mhuire De Lourdes · 577 m+1% pupils (104)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. New house (22164) started Nov 2025, never signed off: is it finished?
      Ask for: The completion certificate, or an engineer's opinion of compliance.
      Seller · solicitor
    2. Work already done (19453): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    3. Work already done (17421): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    4. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    5. Application 14 m away open for comments until 27 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Lixnaw
    Electoral division
    Lixnaw
    Electoral area
    Listowel
    Council
    Kerry County Council
    Everything we found, as a list 8 lines
    • 1 job on this site started but never signed off as finished.
    • On the vacant land tax map.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 27 Oct 2026.
    • 19 homes approved nearby, not started; largest 19 at CLANMAURICE.
    • Lixnaw (bus 272) 443 m away: 5 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 53% rent (council 24%); 12% of homes empty (council 22%); most built 2001–2010; 67% drive to work (council 62%); population up 8% since 2016.
    • The council decides in a median 63 days (about 9 weeks); 46% are asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 23:32 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.