Planning report · Limerick City And County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 21:48

R512

52.47555, -8.54764

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2022. 74 homes approved 320 m away haven't started.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BruffBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2023: 22358 · extension, approved2021: 3 files on Bruff2022: 1 file on Bruff2023: 7 files on Bruff2024: 2 files on Bruff2025: 5 files on Bruff2026: 1 file on Bruff19 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    22358 · extension · approved 2023 · work already done
    approvedstartedsigned off?
On this site
M2
Zoning · Major town centre
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Village Centre: To provide for the development and enhancement of town/village centre core uses including a mix of retail, residential, commercial, civic and other uses.

The main town centre — retail, offices, civic uses, apartments.

limerick development plan 2022 2028 · 29 Jul 2022 – 1 Jun 2028

Heritage inventory8 within 100 m house; Jim Butler
Monument zone1 within 100 m Church, Bruff

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Bruff (488 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings26Catholic Church of Saint Peter and Saint Paul; Bruff Courthouse
Monuments11Earthwork; Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 31 on the draft 2027 map; 31 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 2 is asked for more information.

New house in a garden or site9 decided · more info asked 44%
100% · council 91%
Approved nearbyLimerick City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 9 nearby, 1,581 council-wide

Figure 3

Bruff, file by file since 2021

7 of 7 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 5.

19 planning files on Bruff since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2022 · rear · approved · 22358No number · 2023 · other extension · approved · 23531No number · 2023 · porch / front · approved · 2360157No number · 2024 · other extension · approved · 24331No. 91 · 2025 · rear · approved · 2560729No. 2 · 2025 · single-storey rear · approved · 2561076No. 2 · 2026 · single-storey rear · approved · 2660043Porches, roofs, otherNo number · 2023 · other work · approved · 2360147No number · 2023 · other work · approved · 2360735No number · 2023 · other work · approved · 2360794No number · 2023 · other work · approved · 2360796No number · 2024 · other work · approved · 2460586No number · 2025 · other work · approved · 25277No number · 2025 · other work · approved · 2560048New house in a side gardenNo number · 2021 · new house · approved · 211161No number · 2021 · new house · approved · 211326No number · 2021 · new house · approved · 21600No number · 2023 · new house · approved · 2360350No number · 2025 · new house · approved · 2561110
ApprovedRefusedWithdrawn or invalid

19 files with "Bruff" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 51–54 (n=8)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated13 decided home extensions, 2 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around R512 with 10 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesApprovedRefused
    1. 1Inglenook West, Bruff 2661153No decision yet · 219 m
    2. 2Ballygrennan 2360794Approved, no sign building has started · 320 m
    3. 32.1 ha zoned for homesEmpty land zoned for homes · 94 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 95 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 128 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 130 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 133 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 156 m
    9. 9Chapel Lane, Bruff 267007Approved with conditions · 187 m
    10. 10Crawford Street, Bruff 267032Refused · 350 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 6 show a start notice and 1 has a completion certificate.

    18 applications lodged within 500 m. Council: 18 approved, 0 refused. After appeals: 18 approved. Of those: 1 signed off, 3 built with the owner's opt-out, 2 started, 12 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved18: approved → approved12: approved → no start notice found3: approved → built, owner opted out2: approved → started, not signed off1: approved → signed off18 lodged18 lodged18 approved18 approved18 approved18 approved12 no start notice found12 no start notice found3 built, owner opted out3 built, owner opted out2 started, not signed off2 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured18 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 9 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-09 2661153: application received — a change of use of the existing property from a four bedroom, two and single storey, house to three two bedroom, two stotoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2661153: application received — a change of use of the existing property from a four bedroom, two and single storey, house to three two bedroom, two sto · 219 m away · 2026-11-09
    Comments close
    • Comments close 9 Nov 20269 days left
      12661153 · application received — a change of use of the existing property from a four bedroom, two and single storey, house to…
      €20 to the council · 219 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    74 homes 320 m away were approved May 2024 with no start notice yet; the permission runs to May 2029.

    Ballygrennan · 74 homes: 74 homes approved May 2024, not started2024202520262027202820292030Ballygrennan · 74 homes320 m · 236079474 homes approved May 2024, not started74 homes approved May 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    • Ballygrennan · 74 homes approved May 2024, not started · 320 m

    Empty land zoned for homes 10

    • 32.1 ha zoned for homes · no homes built on it yet · 94 m
    • 40.3 ha zoned for homes · no homes built on it yet · 95 m
    • 50.2 ha zoned for homes · no homes built on it yet · 128 m
    • 60.1 ha zoned for homes · no homes built on it yet · 130 m
    • 70.2 ha zoned for homes · no homes built on it yet · 133 m
    • 80.2 ha zoned for homes · no homes built on it yet · 156 m
    • 0.1 ha zoned for homes · no homes built on it yet · 184 m
    • 0.2 ha zoned for homes · no homes built on it yet · 195 m
    • 1.4 ha zoned for homes · no homes built on it yet · 195 m
    • 0.3 ha zoned for homes · no homes built on it yet · 205 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 7 a year; busiest 2023. 100% of decisions were approvals.

    2021: 3, 2022: 1, 2023: 7, 2024: 2, 2025: 505102021: 3 approved3’21*2022: 1 approved1’222023: 7 approved7’232024: 2 approved2’242025: 5 approved5’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Inglenook West , Bruff , County Limerick comments close 9 Nov 2026
      a change of use of the existing property from a four bedroom, two and single storey, house to three two…
      26611535 Oct 20263 homes219 m
    Every application within 500 m 5 in the last 12 months

    See every application on the map

    • Ballygrennan , Bruff , Co. Limerick No decision yet
      amendments to an approved development at Ballygrennan, Bruff, Co. Limerick. Previous planning ref no.…
      26610357 Sept 2026219 m
    • Newtown , Bruff , Co. Limerick. Withdrawn or not valid
      construction of a dwelling house, to include revisions to the entrance and boundaries previously granted…
      2617931 Jul 20261 homes479 m
    • 10Crawford Street , Bruff , Co. Limerick Refused
      the construction of 2 no. dwellings in semi-detached format, hard & soft landscaping, connections to site…
      2670325 May 2026350 m
    • 9Chapel Lane , Bruff , Co. Limerick Approved with conditions
      construction of a dwelling house, garage, entrance, connection to public sewer and all associated site works.…
      2670074 Feb 2026187 m
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 5 in the last 12 months
    4 not signed off1 no sign-off needed
    • Chapel Lane, Bruff, Limerick · 12 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 21/1161 & 26/7007 · 210 m
    • Brugh Na nDeise, Bruff, Limerick · 14 May 2026 · 2 homes · 7-day notice not signed off · 452 m
    • 16 Brugh Na nDeise, Bruff, Limerick · 8 May 2026 · 16 homes · start notice not signed off · 422 m
    • 1 Crawford's Street, Bruff, Limerick · 10 Apr 2026 · 2 homes · start notice not signed off · 66 m
    • Main Street, Bruff, Limerick · 5 Mar 2026 · 6 homes · start notice not signed off · 2460586 · 53 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 74 not started
    • 2Ballygrennan · 74 homes · not started · runs out 6 May 2029 · 320 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bruff Community Pre School · Crèche11 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 286 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Limerick City and County Council.
    Homes approved
    Here74
    Council middle0
    Homes started
    Here34
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    42% of homes built before 1971 (council 31%). 64% owner-occupied (council 65%).

    Homes built before 1971
    42% · council 31%
    Homes built since 2001
    17% · council 29%
    Owner-occupied
    64% · council 65%
    Rented
    32% · council 27%
    Children under 15
    16% · council 19%
    Aged 65 and over
    24% · council 16%
    Households with 2+ cars
    35% · council 41%
    Work mainly from home
    10% · council 10%
    This small area (333 people)Limerick City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127031004

    Bus
    240 m
    Bruff · 329 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    302 m
    Scoil Dean Cussen, 219 pupils
    Schools, stops and the council

    Schools

    • Scoil Dean Cussen · primary · 219 pupils · 302 m

    Stops 3

    • Bruff · 329 · 0/hour at peak · 240 m
    • Bruff · 329 · 1/hour at peak · 260 m
    • Brackvoan · 329 · 1/hour at peak · 526 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Dean Cussen · 302 m+1.9% pupils (219)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (22358): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Application 219 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bruff
    Electoral division
    Bruff
    Electoral area
    Cappamore-Kilmallock
    Council
    Limerick City And County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 22358, approved 2023, work already done.
    • Zoned M2 (major town centre); no vacant land tax.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 9 Nov 2026.
    • 74 homes approved nearby, not started; largest 74 at Ballygrennan.
    • Bruff (bus 329) 260 m away: 8 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 64% owner-occupied (council 65%); 20% of homes empty (council 8%); most built 1971–1980; 68% drive to work (council 60%); population up 3% since 2016.
    • The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 21:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.