PlanningRegister.ie
Planning report · Wexford County Council · 1000 m around the house · the last 12 months · 30 Oct 2026, 02:36

Chapel Wood

52.50737, -6.28013

Homes here mostly date from the 2000s. 19 homes approved 139 m away haven't started.

See on the mapWatch this area

Not held yet for Wexford County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Litter MoreBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 1 file on Litter More2025: 1 file on Litter More2026: 1 file on Litter More3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Kilmuckridge (353 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 1.0 km
Within 1.0 kmCountFor example
Heritage inventory buildings4Litterbeg House; water pump
Radon grid squares1
Monuments11R146222; R146224
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 75% approved, and 1 in 2 are asked for more information.

New house in a garden or site8 decided · more info asked 50%
75% · council 76%
Approved nearbyWexford overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 8 nearby, 2,257 council-wide

Figure 3

Litter More, file by file since 2021

1 of 1 decided extensions on the road were approved.

3 planning files on Litter More since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2026 · rear · approved · 20260923Porches, roofs, otherNo number · 2021 · other work · approved · 20211302No number · 2025 · other work · refused · 20251405New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Litter More" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 1 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Rear11—

On Chapel Wood: 1 extensions in 10 years; most common rear.

Refused within 100 m 1 in the last 12 months

  • 20251405 · work already done · refused 2 Jan 2026 · 86 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 50 days.

Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 49–52 (n=10)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated11 decided home extensions, 1 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

1 of 1 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.

Refusals appealed1 decided
1 became permissions
Approvals appealed1 decided
0 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Question 4

What's changing around you?

Street map around Chapel Wood with 7 numbered planning items
⌖ the houseWindow closingApproved, not startedRefusedApproved
  1. 1Kilmuckridge, Ballyvaldon 20261135Approved with conditions · 596 m
  2. 2Litter More 20211302Approved, no sign building has started · 139 m
  3. 3Litter More, Killincooly 20251405Refused · 86 m
  4. 4Litter More, Killincooly 20260923Approved with conditions · 80 m
  5. 5Litter Beg, Killincooly 20260912Approved with conditions · 684 m
  6. 6Kilmuckridge, Ballyvaldon 20260068Approved with conditions · 941 m
  7. 7Kilmuckridge, Ballyvaldon 20260548Approved with conditions · 977 m
Figure 6

The next 30 days

1 deadline within 1.0 km; the first closes 13 Nov 2026.

1 deadlines in the next 30 days: 2026-11-13 20261135: Granted (Conditional) — Permission for retention is sought from Wexford County Council for minortoday4 Nov9 Nov14 Nov19 Nov24 Nov29 Nov20261135: Granted (Conditional) — Permission for retention is sought from Wexford County Council for minor · 596 m away · 2026-11-13
Time to appeal ends
  • Time to appeal ends 13 Nov 202614 days left
    120261135 · Granted (Conditional) — Permission for retention is sought from Wexford County Council for minor
    €220 to An Coimisiún Pleanála (€110 observer) · 596 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 7

Approved, stalled or planned, not built yet

19 homes 139 m away were approved Jul 2023 with no start notice yet; the permission runs to Jul 2028.

Litter More · 19 homes: 19 homes approved Jul 2023, not started2023202420252026202720282029Litter More · 19 homes139 m · 2021130219 homes approved Jul 2023, not started19 homes approved Jul 2023, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 1 within 1.0 km

Approved, not started 1

  • Litter More · 19 homes approved Jul 2023, not started · 139 m

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 8

Applications within 500 m, by year

Between 1 and 2 a year; busiest 2025. 83% of decisions were approvals.

2021: 2, 2023: 1, 2025: 2, 2026: 105102021: 2 approved2’21*2023: 1 approved1’232025: 1 approved2025: 1 refused2’252026: 1 approved1’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Every application within 1.0 km 7 in the last 12 months

See every application on the map

  • 1Kilmuckridge, Ballyvaldon Approved with conditions
    Permission for retention is sought from Wexford County Council for minor
    2026113516 Oct 2026596 m
  • 4Litter More, Killincooly Approved with conditions
    Permission to construct an extension to the rear to include a small endless
    202609232 Sept 202680 m
  • 5Litter Beg, Killincooly Approved with conditions
    Permission is sought for (a) The demolition of an existing derelict building
    2026091228 Aug 2026684 m
  • 7Kilmuckridge, Ballyvaldon Approved with conditions
    Permission to erect a new bungalow type dwelling with services including
    2026054812 Aug 20261 homes977 m
  • 6Kilmuckridge, Ballyvaldon Approved with conditions
    Permission to erect a serviced dwellinghouse and to carry out associated
    202600683 Jun 20261 homes941 m
  • Kilmuckridge, Ballyvaldon Withdrawn or not valid
    Permission to erect a serviced dwellinghouse and to carry out associated ancill
    2025162410 Dec 20251 homes942 m
  • 3Litter More, Killincooly Refused
    Permission for retention of change of use of residential sitting room to commer
    202514052 Jan 202686 m
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
Building work nearby 1 in the last 12 months
1 no sign-off needed
  • Kilmuckridge, Wexford · 5 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 20250766 · 724 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
Homes coming 19 not started
  • 2Litter More · 19 homes · not started · runs out 12 Jul 2028 · 139 m
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Estate: Chapel Wood · 3 applications in 10 years

How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Housing estates, Department of Education school list · fetched 27 Oct 2026, 23:04
SourceLicenceFetchedLink
Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
How busy is this area About as busy as most of Wexford County Council.
Homes approved
Here0
Council middle0
Homes started
Here10
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 02:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Question 5

What's the area like?

Figure 9

This street block against the council

5% of homes built before 1971 (council 25%). 72% owner-occupied (council 70%).

Homes built before 1971
5% · council 25%
Homes built since 2001
80% · council 38%
Owner-occupied
72% · council 70%
Rented
18% · council 24%
Children under 15
30% · council 20%
Aged 65 and over
12% · council 17%
Households with 2+ cars
49% · council 46%
Work mainly from home
10% · council 10%
This small area (192 people)Wexford

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 247070002

Bus
769 m
Kilmuckridge · 872
Nearest school
580 m
St Josephs NS, 193 pupils
Schools, stops and the council

Schools

  • St Josephs NS · primary · 193 pupils · 580 m
  • Coláiste an Átha · postprimary · 349 pupils · 645 m

Stops 2

  • Kilmuckridge · 872 · 769 m
  • Kilmuckridge · 872 · 775 m

Schools growing or shrinking planning in 3 years · pupils last year

  • St Josephs NS · 580 m-5.9% pupils (193)
  • Coláiste an Átha · 645 m-4.6% pupils (349)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 02:17
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 02:02open
Council consultation portalsPublic30 Oct 2026, 01:04open
Council meetings (ModernGov)Public30 Oct 2026, 02:17open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. 19 homes approved 139 m away (Litter More), not started: what is planned?
    Ask for: The planning file for 20211302.
    Council
  2. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Litter More
Electoral division
Killincooly
Electoral area
Kilmuckridge
Council
Wexford County Council
Everything we found, as a list 8 lines
  • Not protected; no vacant land tax.
  • 1 site nearby could change: 1 approved scheme.
  • 1 application refused within 100 m since 2025; latest for work already done (2026).
  • 19 homes approved nearby, not started; largest 19 at Litter More.
  • No scheduled public transport within 800 m.
  • Here (2022 census): 72% owner-occupied (council 70%); 32% of homes empty (council 16%); most built 2001–2010; 72% drive to work (council 65%); population up 9% since 2016.
  • 1 home extension within 250 m since 2026.
  • The council decides in a median 54 days (about 8 weeks); 38% are asked for more information.
What the terms mean 6 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 28
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
www2.courts.ie—© the publisher29 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 30 Oct 2026, 02:36 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.