PlanningRegister.ie
Planning report · Kerry County Council · 500 m around the house · the last 12 months · 15 Oct 2026, 12:33

Sandhill Road

52.51115, -9.67486

Homes here mostly date from 1919–1945. 3 planning files on this house, the latest from 2024. Most home extensions nearby get approved (89%). 27 homes approved 457 m away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 3 planning files on this house, the latest from 2024.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 3 planning files on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallybunnionBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2024: 2460119 · garden room, approved2018: 171296 · porch, approved2017: 17878 · porch, refused2018: 1 file on Ballybunnion2019: 2 files on Ballybunnion2020: 1 file on Ballybunnion2022: 1 file on Ballybunnion2025: 4 files on Ballybunnion2026: 1 file on Ballybunnion10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2460119 · garden room · approved 2024 · not started, runs out 2029
    approvedstartedsigned off
  2. 2018
    171296 · porch · approved 2018 · ran out unbuilt
    approvedstartedsigned off
  3. 2017
    17878 · porch · refused 2017
    approvedstarted?signed off?
On this site
M4
Zoning · Major town centre
Yes
Protected or listed · a building in the national heritage inventory (21400108)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM4 · Major town centre
What it says

Built up area: Existing built areas of mixed use

The main town centre — retail, offices, civic uses, apartments.

listowel municipal district local area plan 2020 2026 · 19 Oct 2020 – 18 Oct 2026

Heritage inventoryOn this site house; house

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings16Gerald O'Connor; J. Lynch
Monuments10Ritual site - holy well; Promontory fort - coastal
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 53 on the draft 2027 map; 53 on the final 2026 map.
Sources: zoning, constraints.niah, rzlt, constraints, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 15 Oct 2026, 00:44
SourceLicenceFetchedLink
bcmsCC-BY-4.015 Oct 2026, 00:44open
npadCC-BY-4.015 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 77% by type. A new house in a garden is harder: 76% approved, and 1 in 2 are asked for more information.

Attic or dormer13 decided · more info asked 15%
77% · council 94%
New house in a garden or site41 decided · more info asked 59%
76% · council 87%
Approved nearbyKerry overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 54 nearby, 3,619 council-wide

Figure 3

Ballybunnion, file by file since 2018

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

10 planning files on Ballybunnion since 2018, by kind and decision.201820192020202120222023202420252026Extensions, atticsNo number · 2019 · single-storey rear · approved · 19678No. 5 · 2025 · rear · approved · 25277Porches, roofs, otherNo number · 2018 · other work · approved · 18673No number · 2019 · other work · approved · 1934No number · 2020 · other work · approved · 20247No number · 2022 · other work · approved · 22371No. 12 · 2025 · other work · approved · 2560260No number · 2026 · other extension · approved · 2660486New house in a side gardenNo. 12 · 2025 · new house · refused · 256020312No number · 2025 · new house · approved · 2560485
ApprovedRefusedWithdrawn or invalid

10 files with "Ballybunnion" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2018–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear21—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    npadCC-BY-4.015 Oct 2026, 02:04open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.015 Oct 2026, 00:44open
    npadCC-BY-4.015 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 3 is asked for more information, which adds about 63 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 3): 117 days; Appeal window: 4 weeks; Building starts: 204 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=37)55 daysIf more info asked (1 in 3)With further information: median 117 days (n=17)117 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 204 days after permission (n=12)204 days after permissionSigned off75% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated54 decided home extensions, 12 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 7 appealed refusals became permissions. 3 of 10 appealed approvals were reversed.

    Refusals appealed7 decided
    2 became permissions
    Approvals appealed10 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Sandhill Road with 15 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesBuilding startedApprovedNo decision yet
    1. 1Church Road 2560172Approved, no sign building has started · 457 m
    2. 2SANDHILL ROAD 25103Approved, no sign building has started · 467 m
    3. 31.5 ha zoned for homesEmpty land zoned for homes · 24 m
    4. 43 Main Street, Ballybunnion 24/60735Building started · 112 m
    5. 50.9 ha zoned for homesEmpty land zoned for homes · 112 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 115 m
    7. 73.9 ha zoned for homesEmpty land zoned for homes · 117 m
    8. 8Lartigue Drive, Ballybunion 23613Building started · 118 m
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 125 m
    10. 101.0 ha zoned for homesEmpty land zoned for homes · 158 m
    11. 11Main Street, Ballybunion 2673Approved with conditions · 107 m
    12. 12CLIFF ROAD, BALLYBUNION 2660828No decision yet · 260 m
    13. 13Church Road, Ballybunion 2660175Approved with conditions · 288 m
    14. 14Saint Joseph's Church Road, Ballybunnion 2660486Approved with conditions · 420 m
    15. 15Hannahville, Sandhill Road 2660471Approved with conditions · 446 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 91 permissions since 2016, 25 show a start notice and 5 have a completion certificate. Most owners opt out of sign-off.

    101 applications lodged within 500 m. Council: 90 approved, 11 refused. After appeals: 91 approved. Of those: 5 signed off, 15 built with the owner's opt-out, 5 started, 41 with no start notice found, 25 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT90: lodged → approved11: lodged → refused89: approved → approved8: refused → refused1 approved by the council, refused after an appeal2 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal41: approved → no start notice found15: approved → built, owner opted out5: approved → started, not signed off5: approved → signed off25: approved → ran out101 lodged101 lodged90 approved90 approved11 refused11 refused91 approved91 approved9 refused9 refused1 withdrawn1 withdrawn41 no start notice found41 no start notice found15 built, owner opted out15 built, owner opted out5 started, not signed off5 started, not signed off5 signed off5 signed off25 ran out25 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured101 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      27 homes 457 m away were approved Mar 2026 with no start notice yet; the permission runs to Mar 2031.

      Church Road · 27 homes: 27 homes approved Mar 2026, not started; SANDHILL ROAD · 12 homes: 12 homes approved Oct 2025, not started202420252026202720282029203020312032Church Road · 27 homes457 m · 256017227 homes approved Mar 2026, not started27 homes approved Mar 2026, not startedSANDHILL ROAD · 12 homes467 m · 2510312 homes approved Oct 2025, not started12 homes approved Oct 2025, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 12 within 500 m

      Approved, not started 2

      • Church Road · 27 homes approved Mar 2026, not started · 457 m
      • SANDHILL ROAD · 12 homes approved Oct 2025, not started · 467 m

      Empty land zoned for homes 10

      • 31.5 ha zoned for homes · no homes built on it yet · 24 m
      • 50.9 ha zoned for homes · no homes built on it yet · 112 m
      • 60.4 ha zoned for homes · no homes built on it yet · 115 m
      • 73.9 ha zoned for homes · no homes built on it yet · 117 m
      • 90.2 ha zoned for homes · no homes built on it yet · 125 m
      • 101.0 ha zoned for homes · no homes built on it yet · 158 m
      • 0.2 ha zoned for homes · no homes built on it yet · 170 m
      • 0.3 ha zoned for homes · no homes built on it yet · 178 m
      • 0.2 ha zoned for homes · no homes built on it yet · 186 m
      • 0.3 ha zoned for homes · no homes built on it yet · 253 m

      Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

      Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.015 Oct 2026, 00:44open
      derelictCC-BY-4.012 Oct 2026, 23:08open
      npadCC-BY-4.015 Oct 2026, 02:04open
      Figure 9

      Applications within 500 m, by year

      Between 6 and 15 a year; busiest 2023. 89% of decisions were approvals.

      2017: 11, 2018: 11, 2019: 6, 2020: 10, 2021: 13, 2022: 9, 2023: 15, 2024: 13, 2025: 9, 2026: 4051015202017: 10 approved2017: 1 refused11’17*2018: 11 approved11’182019: 5 approved2019: 1 refused6’192020: 10 approved10’202021: 12 approved2021: 1 refused13’212022: 7 approved2022: 2 refused9’222023: 13 approved2023: 2 refused15’232024: 10 approved2024: 3 refused13’242025: 8 approved2025: 1 refused9’252026: 4 approved4’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 7 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      npadCC-BY-4.015 Oct 2026, 02:04open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.015 Oct 2026, 00:44open
      Building work nearby 6 in the last 12 months
      1 not signed off5 no sign-off needed
      • 4 CLARKE'S LODGE, SANDHILL ROAD, BALLYBUNNION, Kerry, V31 WY89 · 30 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2560927 · 208 m
      • 43 Main Street, Ballybunnion, Kerry, V31 PX96 · 27 Jul 2026 · 1 homes · short notice no sign-off needed · 24/60735 · 112 m
      • 8Lartigue Drive, Ballybunion, Kerry, V31TV25 · 21 May 2026 · short notice no sign-off needed · 23613 · 118 m
      • Sandhill Road, Ballybunnion, Kerry · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60367 · 460 m
      • 6 Doon Bay Chalets, Doon Bay Road,, Ballybunion, Kerry, V31 D611 · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 22986 · 487 m
      • Kit Ahern Road, Ballybunion, Kerry · 23 Jan 2026 · start notice not signed off · 201110 · 205 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 15 Oct 2026, 00:44
      SourceLicenceFetchedLink
      bcmsCC-BY-4.015 Oct 2026, 00:44open
      Homes coming 39 not started
      • 1Church Road · 27 homes · not started · runs out 11 Mar 2031 · 457 m
      • 2SANDHILL ROAD · 12 homes · not started · runs out 23 Oct 2030 · 467 m
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.015 Oct 2026, 00:44open
      npadCC-BY-4.015 Oct 2026, 02:04open
      social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Tir na Nog Community Childcare · Crèche8 Jul 2024 · report · Tusla Early Years Inspectorate109 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
      SourceLicenceFetchedLink
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)14 Oct 2026, 23:20open
      How busy is this area Busier than most of Kerry County Council.
      Homes approved
      Here39
      Council middle0
      Homes started
      Here33
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.015 Oct 2026, 00:44open
      npadCC-BY-4.015 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      48% of homes built before 1971 (council 26%). 74% owner-occupied (council 70%).

      Homes built before 1971
      48% · council 26%
      Homes built since 2001
      20% · council 32%
      Owner-occupied
      74% · council 70%
      Rented
      13% · council 24%
      Children under 15
      15% · council 18%
      Aged 65 and over
      30% · council 19%
      Households with 2+ cars
      29% · council 44%
      Work mainly from home
      10% · council 11%
      This small area (189 people)Kerry

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 077104006/077104007

      Bus
      204 m
      Ballybunnion · 314 · busiest stop within 500 m: 0 an hour at peak
      Nearest school
      440 m
      Scoil Íosagáin, 202 pupils
      Schools, stops and the council

      Schools

      • Scoil Íosagáin · primary · 202 pupils · 440 m
      • St. Joseph's Secondary School · postprimary · 349 pupils · 675 m

      Stops 4

      • Ballybunnion · 314 · 204 m
      • Ballybunnion · 272 · 321 m
      • Ballybunnion · 272, 314 · 0/hour at peak · 340 m
      • The Scallops · 274 · 0/hour at peak · 352 m

      Schools growing or shrinking planning in 3 years · pupils last year

      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.015 Oct 2026, 02:04open
      consultpublic15 Oct 2026, 01:32open
      moderngovpublic15 Oct 2026, 01:32open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Garden room (2460119) approved 2024, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Porch (171296) ran out unbuilt in 2023: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      3. Porch (17878) refused 2017: built anyway?
        Ask for: The seller's answer and your surveyor's check.
        Seller · solicitor
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballybunnion
      Electoral division
      Killehenny
      Electoral area
      Listowel
      Council
      Kerry County Council
      Everything we found, as a list 8 lines
      • 3 applications on this site; latest 2460119, approved 2024, not started, runs out 2029.
      • Zoned M4 (major town centre); heritage-listed; no vacant land tax.
      • 12 sites nearby could change: 2 approved schemes, 10 empty zoned plots.
      • 39 homes approved nearby, not started; largest 27 at Church Road.
      • Ballybunnion (bus 272, 314) 340 m away: 9 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 74% owner-occupied (council 70%); 54% of homes empty (council 22%); most built 1919–1945; 62% drive to work (council 62%); population up 10% since 2016.
      • 2 home extensions within 250 m since 2026. Most were single-storey rear extensions.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.014 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public15 Oct 2026
      www2.courts.ie—all-rights-reserved15 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public15 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.015 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…15 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 15 Oct 2026, 12:33 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.