Planning report · Tipperary County Council · 500 m around the house · the last 12 months · 27 Oct 2026, 12:17

Carrick Street, Mullinahone

52.51155, -7.50528

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2024.

See on the mapWatch this area

Not held yet for Tipperary County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MullinahoneBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2025: 2460803 · change of use, refused2024: 24159 · change of use, withdrawn or invalid2021: 4 files on Mullinahone2022: 2 files on Mullinahone2023: 3 files on Mullinahone2024: 6 files on Mullinahone2025: 1 file on Mullinahone2026: 1 file on Mullinahone17 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2460803 · change of use · refused 2025
    approvedstarted?signed off?
  2. 2024
    24159 · change of use · withdrawn
    approved?started?signed off?
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (TS063-071001-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town / Village Centre: To provide and enhance village centre facilities to improve the service provision to the rural hinterland

The main town centre — retail, offices, civic uses, apartments.

tipperary county development plan 2022 2028 settlement plans · 22 Aug 2022 – 11 Jul 2028

Protected building4 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory2 within 100 m War of Independence Monument; house
Monument zoneOn this site Castle - hall-house, Mullinahone; Settlement cluster, Mullinahone

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Mullinahone (455 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7The Barracks; house
Monuments10R138540; R138556
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 33 on the draft 2027 map; 33 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

New house in a garden or site5 decided · more info asked 60%
100% · council 97%
Approved nearbyTipperary overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 5 nearby, 1,032 council-wide

Figure 3

Mullinahone, file by file since 2021

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

17 planning files on Mullinahone since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · single-storey rear · approved · 211820No number · 2024 · single-storey rear · approved · 2413No number · 2024 · other extension · approved · 2460910No. 10 · 2025 · two-storey rear · approved · 2560640Porches, roofs, otherNo number · 2021 · other work · approved · 211022No number · 2021 · other work · approved · 211664No number · 2022 · other work · approved · 22299No number · 2022 · other work · approved · 22390No number · 2023 · other work · approved · 23239No number · 2023 · other work · approved · 2360634No number · 2023 · other work · approved · 2360961No number · 2024 · other work · approved · 2460774No number · 2024 · other work · refused · 2460803No number · 2026 · other work · approved · 2660047New house in a side gardenNo number · 2021 · new house · approved · 21860No number · 2024 · new house · approved · 2460302No number · 2024 · new house · approved · 2460830
ApprovedRefusedWithdrawn or invalid

17 files with "Mullinahone" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    1 of 3 appealed approvals were reversed.

    Approvals appealed3 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Carrick Street, Mullinahone with 10 numbered planning items
    ⌖ the houseLarge schemeEmpty land zoned for homesBuilding startedNo decision yetApproved
    1. 1Carrick Road, Mullinahone 2561198No decision yet · 209 m
    2. 20.8 ha zoned for homesEmpty land zoned for homes · 49 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 100 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 112 m
    5. 510 Carrick Street, Mullinahone 2560640Building started · 121 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 127 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 129 m
    8. 80.6 ha zoned for homesEmpty land zoned for homes · 142 m
    9. 9The Barracks Killaghy Street, Mullinahone 2660060No decision yet · 128 m
    10. 10Killaghy, Mullinahone 2660047Approved with conditions · 479 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 14 permissions since 2016, 4 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    16 applications lodged within 500 m. Council: 15 approved, 1 refused. After appeals: 14 approved. Of those: 0 signed off, 4 built with the owner's opt-out, 0 started, 10 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT15: lodged → approved1: lodged → refused14: approved → approved1: refused → refused1 approved by the council, refused after an appeal10: approved → no start notice found4: approved → built, owner opted out16 lodged16 lodged15 approved15 approved1 refused1 refused14 approved14 approved2 refused2 refused10 no start notice found10 no start notice found4 built, owner opted out4 built, owner opted out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured16 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 20.8 ha zoned for homes · no homes built on it yet · 49 m
      • 30.4 ha zoned for homes · no homes built on it yet · 100 m
      • 40.3 ha zoned for homes · no homes built on it yet · 112 m
      • 60.2 ha zoned for homes · no homes built on it yet · 127 m
      • 70.2 ha zoned for homes · no homes built on it yet · 129 m
      • 80.6 ha zoned for homes · no homes built on it yet · 142 m
      • 1.5 ha zoned for homes · no homes built on it yet · 158 m
      • 1.0 ha zoned for homes · no homes built on it yet · 184 m
      • 1.0 ha zoned for homes · no homes built on it yet · 189 m
      • 0.2 ha zoned for homes · no homes built on it yet · 207 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 7

      Applications within 500 m, by year

      Between 1 and 6 a year; busiest 2024. 94% of decisions were approvals.

      2021: 4, 2022: 2, 2023: 2, 2024: 6, 2025: 1, 2026: 105102021: 4 approved4’21*2022: 2 approved2’222023: 2 approved2’232024: 5 approved2024: 1 refused6’242025: 1 approved1’252026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      Building work nearby 1 in the last 12 months
      1 no sign-off needed
      • 510 Carrick Street, Mullinahone, Tipperary, E41 T970 · 22 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2560640 · 121 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Mullinahone Community Playgroup · Crèche6 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 86 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area About as busy as most of Tipperary County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here2
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      50% owner-occupied (council 69%).

      Homes built before 1971
      38% · council 33%
      Homes built since 2001
      23% · council 29%
      Owner-occupied
      50% · council 69%
      Rented
      49% · council 24%
      Children under 15
      17% · council 20%
      Aged 65 and over
      20% · council 18%
      Households with 2+ cars
      38% · council 46%
      Work mainly from home
      5% · council 10%
      This small area (337 people)Tipperary

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 217134003

      Nearest school
      408 m
      S N Michil Naofa, 137 pupils
      Schools, stops and the council

      Schools

      • S N Michil Naofa · primary · 137 pupils · 408 m

      Stops 0

        Schools growing or shrinking planning in 3 years · pupils last year

        • S N Michil Naofa · 408 m-3.5% pupils (137)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
        Council consultation portalsPublic27 Oct 2026, 00:57open
        Council meetings (ModernGov)Public27 Oct 2026, 01:57open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Change of use (2460803) refused 2025: built anyway?
          Ask for: The seller's answer and your surveyor's check.
          Seller · solicitor
        2. Next to a recorded monument: does digging need notice?
          Ask for: Details of past works from the seller.
          Seller · council
        3. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Mullinahone
        Electoral division
        Mullinahone
        Electoral area
        Carrick-On-Suir
        Council
        Tipperary County Council
        Everything we found, as a list 8 lines
        • 2 applications on this site; latest 2460803, refused 2025.
        • Zoned M2 (major town centre); monument zone; no vacant land tax.
        • 10 sites nearby could change: 10 empty zoned plots.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 50% owner-occupied (council 69%); 12% of homes empty (council 10%); most built 2001–2010; 70% drive to work (council 66%); population up 3% since 2016.
        • The council decides in a median 55 days (about 8 weeks); 39% are asked for more information.
        • 6 applications nearby in the last 12 months.
        • 1 building job started within 250 m in the last six months.
        What the terms mean 6 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 29
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
        www2.courts.ie—© the publisher26 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
        services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 27 Oct 2026, 12:17 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.