PlanningRegister.ie
Planning report · Wexford County Council · 500 m around the house · the last 12 months · 16 Oct 2026, 07:26

Greenwood Avenue

52.51170, -6.28409

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2020. 19 homes approved 451 m away haven't started.

See on the mapWatch this area

Not held yet for Wexford County Council: council consultations.

The council's planning feed has nothing received after 21 Sept 2026: newer applications may be missing.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2020.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallygarranBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2020: 20200385 · garden room, approved2016: 2 files on Ballygarran2018: 1 file on Ballygarran2019: 1 file on Ballygarran2020: 3 files on Ballygarran2021: 1 file on Ballygarran2024: 1 file on Ballygarran2025: 2 files on Ballygarran11 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2020
    20200385 · garden room · approved 2020 · ran out unbuilt
    approvedstartedsigned off
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Kilmuckridge (221 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings3Litterbeg House; water pump
Radon grid squares1
Monuments1R146232
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 81% approved, and 1 in 3 is asked for more information.

New house in a garden or site16 decided · more info asked 38%
81% · council 75%
Approved nearbyWexford overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 3,782 council-wide

Figure 3

Ballygarran, file by file since 2016

0 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

11 planning files on Ballygarran since 2016, by kind and decision.20162017201820192020202120222023202420252026Extensions, atticsNo number · 2020 · first-floor · refused · 20201375Porches, roofs, otherNo number · 2016 · other work · approved · 20160350No number · 2019 · other work · approved · 20190714No number · 2020 · other work · approved · 20200385No number · 2021 · other work · approved · 20210281No number · 2024 · other work · approved · 20240633No number · 2025 · other work · approved · 20250370No number · 2025 · other work · approved · 20250449New house in a side gardenNo number · 2016 · new house · approved · 20160387No number · 2018 · new house · approved · 20180289No number · 2020 · new house · approved · 20200915
ApprovedRefusedWithdrawn or invalid

11 files with "Ballygarran" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2016–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days.

    Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 49–53 (n=16)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated18 decided home extensions, 2 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 2 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.

    Refusals appealed2 decided
    2 became permissions
    Approvals appealed1 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Greenwood Avenue with 2 numbered planning items
    ⌖ the houseApproved, not startedApproved
    1. 1Litter More 20211302Approved, no sign building has started · 451 m
    2. 2Litter Beg, Killincooly 20260912Approved with conditions · 207 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 22 permissions since 2016, 5 show a start notice and 3 have a completion certificate.

    25 applications lodged within 500 m. Council: 20 approved, 5 refused. After appeals: 22 approved. Of those: 3 signed off, 2 built with the owner's opt-out, 0 started, 11 with no start notice found, 6 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved5: lodged → refused20: approved → approved3: refused → refused2 refused by the council, approved after an appeal11: approved → no start notice found2: approved → built, owner opted out3: approved → signed off6: approved → ran out25 lodged25 lodged20 approved20 approved5 refused5 refused22 approved22 approved3 refused3 refused11 no start notice found11 no start notice found2 built, owner opted out2 built, owner opted out3 signed off3 signed off6 ran out6 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured25 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      19 homes 451 m away were approved Jul 2023 with no start notice yet; the permission runs to Jul 2028.

      Litter More · 19 homes: 19 homes approved Jul 2023, not started2023202420252026202720282029Litter More · 19 homes451 m · 2021130219 homes approved Jul 2023, not started19 homes approved Jul 2023, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Approved, not started 1

      • Litter More · 19 homes approved Jul 2023, not started · 451 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 9

      Applications within 500 m, by year

      Between 1 and 6 a year; busiest 2020. 80% of decisions were approvals.

      2016: 2, 2017: 1, 2018: 1, 2019: 1, 2020: 6, 2021: 4, 2022: 2, 2023: 1, 2024: 3, 2025: 3, 2026: 105102016: 2 approved2’16*2017: 1 refused1’172018: 1 approved1’182019: 1 approved1’192020: 3 approved2020: 3 refused6’202021: 4 approved4’212022: 1 approved2022: 1 refused2’222023: 1 approved1’232024: 3 approved3’242025: 3 approved3’252026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 1 in the last 12 months

      See every application on the map

      • 2Litter Beg, Killincooly Approved with conditions
        Permission is sought for (a) The demolition of an existing derelict building
        2026091228 Aug 2026207 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Homes coming 19 not started
      • 1Litter More · 19 homes · not started · runs out 12 Jul 2028 · 451 m
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Kilmuckridge Kids Creche and Montessori · Crèche13 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 808 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area About as busy as most of Wexford County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here10
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      12% of homes built before 1971 (council 25%). 63% owner-occupied (council 70%).

      Homes built before 1971
      12% · council 25%
      Homes built since 2001
      46% · council 38%
      Owner-occupied
      63% · council 70%
      Rented
      33% · council 24%
      Children under 15
      23% · council 20%
      Aged 65 and over
      13% · council 17%
      Households with 2+ cars
      35% · council 46%
      Work mainly from home
      15% · council 10%
      This small area (280 people)Wexford

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 247070003

      Bus
      264 m
      Kilmuckridge · 872
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      163 m
      Coláiste an Átha, 349 pupils
      Schools, stops and the council

      Schools

      • Coláiste an Átha · postprimary · 349 pupils · 163 m
      • St Josephs NS · primary · 193 pupils · 444 m

      Stops 2

      • Kilmuckridge · 872 · 264 m
      • Kilmuckridge · 872 · 268 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Coláiste an Átha · 163 m-4.6% pupils (349)
      • St Josephs NS · 444 m-5.9% pupils (193)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Council consultation portalsPublic16 Oct 2026, 01:34open
      Council meetings (ModernGov)Public16 Oct 2026, 01:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Garden room (20200385) ran out unbuilt in 2025: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      2. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballygarran
      Electoral division
      Killincooly
      Electoral area
      Kilmuckridge
      Council
      Wexford County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 20200385, approved 2020, ran out unbuilt.
      • Not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 approved scheme.
      • The council's planning feed has nothing received after 21 Sep 2026: newer applications may be missing.
      • 19 homes approved nearby, not started; largest 19 at Litter More.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 63% owner-occupied (council 70%); 27% of homes empty (council 16%); most built 2001–2010; 53% drive to work (council 65%); population up 9% since 2016.
      • The council decides in a median 54 days (about 8 weeks); 38% are asked for more information.
      What the terms mean 4 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
      www2.courts.ie—© the publisher16 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 16 Oct 2026, 07:26 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.