PlanningRegister.ie
Planning report · Limerick City And County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 06:37

R518

52.60034, -8.97554

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2026. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CloonreaskBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2026: 26237 · apartments, undecided2023: 2 files on Cloonreask2024: 1 file on Cloonreask2026: 1 file on Cloonreask4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    26237 · apartments · no decision yet
    approved?started?signed off?
On this site
Yes
Protected or listed · inside the zone around a recorded monument (LI011-092003-); a building in the national heritage inventory (21826003)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Heritage inventoryOn this site house
Monument zoneOn this site Castle - Anglo-Norman masonry castle, Aghalacka; Bridge, Aghalacka,Askeaton,Cloonreask

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Askeaton Housing Estate (Lismakeera) (417 m); Askeaton (901 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings20Saint Mary's Catholic Church; house
Monuments19Historic town; Bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Cloonreask, file by file since 2023

4 planning files on Cloonreask since 2023, by kind and decision.2023202420252026Extensions, atticsPorches, roofs, otherNo number · 2023 · other work · approved · 23346No. 3 · 2023 · other work · approved · 23387No number · 2024 · other work · approved · 2460396No number · 2026 · other work · approved · 2660751New house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Cloonreask" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 52–55 (n=8)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated9 decided home extensions, 2 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around R518 with 4 numbered planning items
    ⌖ the houseOpen for commentsApprovedRefused
    1. 1Main St, Brewrey Lane 26237No decision yet · 5 m
    2. 2Townlands of Coolrahnee Cloonreask Askeaton and Moig South, Askeaton 2660751Approved with conditions · 30 m
    3. 3Unit 1 & 2, St Mary's Terrace 2660775Approved with conditions · 108 m
    4. 4Church St., Askeaton 26120Refused · 285 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 11 permissions since 2016, 1 show a start notice and 0 have a completion certificate.

    12 applications lodged within 500 m. Council: 11 approved, 1 refused. After appeals: 11 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 1 started, 9 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT11: lodged → approved1: lodged → refused11: approved → approved1: refused → refused9: approved → no start notice found1: approved → started, not signed off1: approved → ran out12 lodged12 lodged11 approved11 approved1 refused1 refused11 approved11 approved1 refused1 refused9 no start notice found9 no start notice found1 started, not signed off1 started, not signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured12 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    1 deadline within 500 m; the first closes 13 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-13 26237: application received — construction of 5 no 2 storey terraced housing units ( 4 no 3 bed & 1 number 2 bed ) fronting Main St. including a pedestoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec26237: application received — construction of 5 no 2 storey terraced housing units ( 4 no 3 bed & 1 number 2 bed ) fronting Main St. including a pedes · 5 m away · 2026-11-13
    Comments close
    • Comments close 13 Nov 202612 days left
      126237 · application received — construction of 5 no 2 storey terraced housing units ( 4 no 3 bed & 1 number 2 bed ) fronting…
      €20 to the council · 5 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2023. 92% of decisions were approvals.

    2021: 2, 2022: 1, 2023: 3, 2024: 1, 2025: 2, 2026: 305102021: 2 approved2’21*2022: 1 approved1’222023: 3 approved3’232024: 1 approved1’242025: 2 approved2’252026: 2 approved2026: 1 refused3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Main St , Brewrey Lane , Askeaton comments close 13 Nov 2026
      construction of 5 no 2 storey terraced housing units ( 4 no 3 bed & 1 number 2 bed ) fronting Main St.…
      262379 Oct 202610 homes5 m
    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Happy Faces · Crèche3 Nov 2025 · report · Tusla Early Years Inspectorate408 m
    Happy Faces Creche · Crèche14 Mar 2024 · report · Tusla Early Years Inspectorateapprox. 958 m
    Clever Kidz · Crèche19 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 958 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Limerick City and County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    46% of homes built before 1971 (council 31%). 33% owner-occupied (council 65%).

    Homes built before 1971
    46% · council 31%
    Homes built since 2001
    38% · council 29%
    Owner-occupied
    33% · council 65%
    Rented
    62% · council 27%
    Children under 15
    14% · council 19%
    Aged 65 and over
    31% · council 16%
    Households with 2+ cars
    15% · council 41%
    Work mainly from home
    7% · council 10%
    This small area (300 people)Limerick City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127010004

    Bus
    174 m
    Askeaton · 314 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    408 m
    Scoil Naomh Muire, Eas Géitine, 157 pupils
    Homes sold nearby
    1
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Naomh Muire, Eas Géitine · primary · 157 pupils · 408 m
    • Colaiste Mhuire · postprimary · 268 pupils · 409 m

    Stops 5

    • Askeaton · 314 · 1/hour at peak · 174 m
    • Askeaton · 314 · 1/hour at peak · 179 m
    • Deel Manor · 314 · 1/hour at peak · 236 m
    • Deel Manor · 314 · 1/hour at peak · 251 m
    • St Francis Avenue · 314 · 1/hour at peak · 770 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Naomh Muire, Eas Géitine · 408 m-2.5% pupils (157)
    • Colaiste Mhuire · 409 m-8.8% pupils (268)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Apartments (26237) awaits a decision: what is planned?
      Ask for: The application on the council's website.
      Seller · solicitor
    2. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    3. Application 5 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Cloonreask
    Electoral division
    Askeaton West
    Electoral area
    Adare-Rathkeale
    Council
    Limerick City And County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 26237, no decision yet.
    • Heritage-listed; monument zone; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 13 Nov 2026.
    • Askeaton (bus 314) 174 m away: 8 a day, fewer than one an hour at morning peak; 3 from all stops within 500 m.
    • Here (2022 census): 62% rent (council 27%); 16% of homes empty (council 8%); most built 2001–2010; 54% drive to work (council 60%); population up 4% since 2016.
    • The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
    • 6 applications nearby in the last 12 months.
    What the terms mean 4 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 06:37 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.