How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 53 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
No zoning in the plans we hold.
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Cappamore (996 m)
| Within 2.0 km | Count | For example |
|---|---|---|
| Heritage inventory buildings | 20 | Cappamore Co-Operative Creamery; Cappamore Bridge |
| Monuments | 47 | Ringfort - rath; Mound |
How we work this out
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 2 Nov 2026, 23:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 1 Nov 2026, 23:13 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 2 Nov 2026, 23:44 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 11 nearby, 1,581 council-wide
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 53 days.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated12 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
1 of 2 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 1 in the last 12 months
- 324164 Pending · in the townlands of Carrow, Moheragh, Gortaderry, Co. Tipperary;… · 603 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 2 Nov 2026, 23:14 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
What's changing around you?
- 1Turagh, Cappamore 2661018
- 2Dromsallagh, Cappamore 2660926
- 3Dromsally Woods 2260015
- 40.1 ha zoned for homes
- 50.3 ha zoned for homes
- 60.6 ha zoned for homes
- 70.2 ha zoned for homes
- 80.4 ha zoned for homes
- 90.5 ha zoned for homes
- 10Superoil Service Station, Dromsally Road 2660157
- 11Limerick College of Further Education, Cappamore Campus 2660768
- 12Moore St., Cappamore 26118
- 13Doon Road, Gortnascarry 2660262
- 14Cappamore Community Centre, Portnard Cappamore 2660872
- 15Parochial House, Portnard Cappamore 2660601
The next 30 days
2 deadlines within 2.0 km; the first closes 4 Nov 2026.
- Time to appeal ends 4 Nov 20261 day left22660926 · CONDITIONAL — the demolition of existing single storey extension to side of the existing dwelling house, construction…€220 to An Coimisiún Pleanála (€110 observer) · 825 m away
- Time to appeal ends 19 Nov 202616 days left12661018 · CONDITIONAL — completion of a one and half storey rear extension to existing dwelling and the demolition of former side…€220 to An Coimisiún Pleanála (€110 observer) · 692 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
41 homes 813 m away were approved Oct 2023 with no start notice yet; the permission runs to Oct 2028.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 11 within 2.0 km
Approved, not started 1
- Dromsally Woods · 41 homes approved Oct 2023, not started · 813 m
Empty land zoned for homes 10
- 40.1 ha zoned for homes · no homes built on it yet · 512 m
- 50.3 ha zoned for homes · no homes built on it yet · 528 m
- 60.6 ha zoned for homes · no homes built on it yet · 551 m
- 70.2 ha zoned for homes · no homes built on it yet · 556 m
- 80.4 ha zoned for homes · no homes built on it yet · 561 m
- 90.5 ha zoned for homes · no homes built on it yet · 584 m
- 0.4 ha zoned for homes · no homes built on it yet · 611 m
- 1.6 ha zoned for homes · no homes built on it yet · 616 m
- 1.6 ha zoned for homes · no homes built on it yet · 661 m
- 0.9 ha zoned for homes · no homes built on it yet · 664 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
| Derelict sites registers | CC BY 4.0 | 2 Nov 2026, 23:17 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
Every application within 2.0 km 11 in the last 12 months
See every application on the map
- 1Turagh , Cappamore , Co. Limerick. Approved with conditionscompletion of a one and half storey rear extension to existing dwelling and the demolition of former side and…
- 2Dromsallagh , Cappamore , Co. Limerick Approved with conditionsthe demolition of existing single storey extension to side of the existing dwelling house, construction of a…
- 14Cappamore Community Centre , Portnard Cappamore , Co. Limerick Approved with conditionsinstallation of a standalone Pod structure, 21 square metres, as a sensory room and safe space ancillary to…
- 11Limerick College of Further Education , Cappamore Campus , Cappamore Co. Limerick No decision yeta) construct a standalone single storey building for use within the existing campus, with the new building to…
- 15Parochial House , Portnard Cappamore , Limerick Approved with conditionsall works already executed, including: Removal of heating system and some finishes throughout, including…
- 12Moore St. , Cappamore , Co. Limerick. Approved with conditionsthe construction of 2 semi-detached two storey dwelling houses with associated car parking off existing…
- Gortnagarde , Cappamore , Co. Limerick Approved with conditionsconstruction of a Milking parlour building incorporating holding yard with crush/ drafting yard, meal bin,…
- 13Doon Road , Gortnascarry , Cappamore Co. Limerick Approved with conditions(a) hardcore area to yard; (b) concrete floor area in existing haybarn; (c) external concrete floor with…
- 10Superoil Service Station , Dromsally Road , Cappamore Co. Limerick. No decision yetshop renovations / alterations and revised internal layout to the existing shop, rear extension to shop…
- Doon Road , Gortnascarry , Cappamore Co. Limerick Withdrawn or not valid(a) hardcore area to yard; (b) concrete floor area in existing haybarn; (c) external concrete floor with…
- Dromclogher , Cappamore , Co. Limerick. Approved with conditionsPERMISSION for administration building and staff carparking, extension to truck parts storage building,…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
Building work nearby 4 in the last 12 months
- DROMSALLAGH, Cappamore, Limerick, V94 W5RE · 27 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 221112 · 634 m
- Tuogh, Towerhill Cross, Limerick · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60004 · 1.3 km
- Gortnascarry, Cappamore, Limerick · 1 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2561012 · 1.1 km
- Ollie's Place', Main Street, Turagh, Cappamore, Limerick, V94 TXW8 · 6 May 2026 · 2 homes · start notice not signed off · 2460929 · 810 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 3 Nov 2026, 03:31
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
Homes coming 41 not started
- 3Dromsally Woods · 41 homes · not started · runs out 16 Oct 2028 · 813 m
- Moore Street · 22 homes · building started · 740 m
- Turagh Crescent · 17 homes · building started · 873 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
How busy is this area Busier than most of Limerick City and County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 3 Nov 2026, 03:31 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
What's the area like?
This street block against the council
95% owner-occupied (council 65%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127039001
Schools, stops and the council
Schools
- Scoil ChaitríOna · primary · 82 pupils · 638 m
Stops 2
Schools growing or shrinking planning in 3 years · pupils last year
- Scoil ChaitríOna · 638 m+9.3% pupils (82)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 3 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 1 Nov 2026, 23:05 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 05:02 | open |
| Council consultation portals | Public | 3 Nov 2026, 01:12 | open |
| Council meetings (ModernGov) | Public | 3 Nov 2026, 02:30 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Tuogh
- Electoral division
- Cappamore
- Electoral area
- Cappamore-Kilmallock
- Council
- Limerick City And County Council
Everything we found, as a list 8 lines
- No vacant land tax.
- 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
- 41 homes approved nearby, not started; largest 41 at Dromsally Woods.
- No scheduled public transport within 800 m.
- Here (2022 census): 95% owner-occupied (council 65%); 6% of homes empty (council 8%); most built 2001–2010; 75% drive to work (council 60%); population up 5% since 2016.
- The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
- 11 applications nearby in the last 12 months; 100% approved (council 90%).
- 54 homes started within 1 km in 3 years (council middle 2).
What the terms mean 6 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 26
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 3 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 3 Nov 2026 |
| www2.courts.ie | — | © the publisher | 2 Nov 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 2 Nov 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 2 Nov 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 1 Nov 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 3 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 3 Nov 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 3 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 1 Nov 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 1 Nov 2026 |