PlanningRegister.ie
Planning report · Limerick City And County Council · 2000 m around the house · the last 12 months · 3 Nov 2026, 10:35

R505

52.60780, -8.34322

Homes here mostly date from the 2000s. 41 homes approved 813 m away haven't started.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Cappamore (996 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings20Cappamore Co-Operative Creamery; Cappamore Bridge
Monuments47Ringfort - rath; Mound
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 35 on the draft 2027 map; 32 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.

New house in a garden or site11 decided · more info asked 36%
100% · council 91%
Approved nearbyLimerick City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 11 nearby, 1,581 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=9)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated12 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 2 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.

    Refusals appealed2 decided
    1 became permissions
    Approvals appealed1 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 324164 Pending · in the townlands of Carrow, Moheragh, Gortaderry, Co. Tipperary;… · 603 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher2 Nov 2026, 23:14open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around R505 with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homesNo decision yetApproved
    1. 1Turagh, Cappamore 2661018Approved with conditions · 692 m
    2. 2Dromsallagh, Cappamore 2660926Approved with conditions · 825 m
    3. 3Dromsally Woods 2260015Approved, no sign building has started · 813 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 512 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 528 m
    6. 60.6 ha zoned for homesEmpty land zoned for homes · 551 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 556 m
    8. 80.4 ha zoned for homesEmpty land zoned for homes · 561 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 584 m
    10. 10Superoil Service Station, Dromsally Road 2660157No decision yet · 491 m
    11. 11Limerick College of Further Education, Cappamore Campus 2660768No decision yet · 616 m
    12. 12Moore St., Cappamore 26118Approved with conditions · 792 m
    13. 13Doon Road, Gortnascarry 2660262Approved with conditions · 921 m
    14. 14Cappamore Community Centre, Portnard Cappamore 2660872Approved with conditions · 1.0 km
    15. 15Parochial House, Portnard Cappamore 2660601Approved with conditions · 1.2 km
    Figure 5

    The next 30 days

    2 deadlines within 2.0 km; the first closes 4 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-04 2660926: CONDITIONAL — the demolition of existing single storey extension to side of the existing dwelling house, construction of a new replace; 2026-11-19 2661018: CONDITIONAL — completion of a one and half storey rear extension to existing dwelling and the demolition of former side and rear singltoday8 Nov13 Nov18 Nov23 Nov28 Nov3 Dec2660926: CONDITIONAL — the demolition of existing single storey extension to side of the existing dwelling house, construction of a new replace · 825 m away · 2026-11-042661018: CONDITIONAL — completion of a one and half storey rear extension to existing dwelling and the demolition of former side and rear singl · 692 m away · 2026-11-19
    Time to appeal ends
    • Time to appeal ends 4 Nov 20261 day left
      22660926 · CONDITIONAL — the demolition of existing single storey extension to side of the existing dwelling house, construction…
      €220 to An Coimisiún Pleanála (€110 observer) · 825 m away
    • Time to appeal ends 19 Nov 202616 days left
      12661018 · CONDITIONAL — completion of a one and half storey rear extension to existing dwelling and the demolition of former side…
      €220 to An Coimisiún Pleanála (€110 observer) · 692 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    41 homes 813 m away were approved Oct 2023 with no start notice yet; the permission runs to Oct 2028.

    Dromsally Woods · 41 homes: 41 homes approved Oct 2023, not started2023202420252026202720282029Dromsally Woods · 41 homes813 m · 226001541 homes approved Oct 2023, not started41 homes approved Oct 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 1

    Empty land zoned for homes 10

    • 40.1 ha zoned for homes · no homes built on it yet · 512 m
    • 50.3 ha zoned for homes · no homes built on it yet · 528 m
    • 60.6 ha zoned for homes · no homes built on it yet · 551 m
    • 70.2 ha zoned for homes · no homes built on it yet · 556 m
    • 80.4 ha zoned for homes · no homes built on it yet · 561 m
    • 90.5 ha zoned for homes · no homes built on it yet · 584 m
    • 0.4 ha zoned for homes · no homes built on it yet · 611 m
    • 1.6 ha zoned for homes · no homes built on it yet · 616 m
    • 1.6 ha zoned for homes · no homes built on it yet · 661 m
    • 0.9 ha zoned for homes · no homes built on it yet · 664 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Every application within 2.0 km 11 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Building work nearby 4 in the last 12 months
    1 not signed off3 no sign-off needed
    • DROMSALLAGH, Cappamore, Limerick, V94 W5RE · 27 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 221112 · 634 m
    • Tuogh, Towerhill Cross, Limerick · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60004 · 1.3 km
    • Gortnascarry, Cappamore, Limerick · 1 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2561012 · 1.1 km
    • Ollie's Place', Main Street, Turagh, Cappamore, Limerick, V94 TXW8 · 6 May 2026 · 2 homes · start notice not signed off · 2460929 · 810 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 3 Nov 2026, 03:31
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Homes coming 41 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area Busier than most of Limerick City and County Council.
    Homes approved
    Here22
    Council middle0
    Homes started
    Here54
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    95% owner-occupied (council 65%).

    Homes built before 1971
    30% · council 31%
    Homes built since 2001
    28% · council 29%
    Owner-occupied
    95% · council 65%
    Rented
    4% · council 27%
    Children under 15
    14% · council 19%
    Aged 65 and over
    16% · council 16%
    Households with 2+ cars
    70% · council 41%
    Work mainly from home
    9% · council 10%
    This small area (393 people)Limerick City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127039001

    Nearest school
    638 m
    Scoil ChaitríOna, 82 pupils
    Schools, stops and the council

    Schools

    • Scoil ChaitríOna · primary · 82 pupils · 638 m

    Stops 2

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil ChaitríOna · 638 m+9.3% pupils (82)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      Council consultation portalsPublic3 Nov 2026, 01:12open
      Council meetings (ModernGov)Public3 Nov 2026, 02:30open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Tuogh
      Electoral division
      Cappamore
      Electoral area
      Cappamore-Kilmallock
      Council
      Limerick City And County Council
      Everything we found, as a list 8 lines
      • No vacant land tax.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 41 homes approved nearby, not started; largest 41 at Dromsally Woods.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 95% owner-occupied (council 65%); 6% of homes empty (council 8%); most built 2001–2010; 75% drive to work (council 60%); population up 5% since 2016.
      • The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
      • 11 applications nearby in the last 12 months; 100% approved (council 90%).
      • 54 homes started within 1 km in 3 years (council middle 2).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.03 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public3 Nov 2026
      www2.courts.ie—© the publisher2 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public3 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.03 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence3 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 3 Nov 2026, 10:35 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.