PlanningRegister.ie
Planning report · Limerick City And County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 19:53

Clonkeen, The Municipal District of Cappamore — Kilmallock, County Limerick, Munster, Éire / Ireland

52.64853, -8.40586

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2020.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2020.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of FarnaneBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2020: 20217 · work already done, approved2019: 1 file on Farnane2020: 1 file on Farnane2021: 1 file on Farnane2022: 1 file on Farnane2023: 1 file on Farnane2024: 2 files on Farnane7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2020
    20217 · work already done · approved 2020 · work already done
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To provide for residential development, protect and improve existing residential amenity.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

limerick development plan 2022 2028 · 29 Jul 2022 – 1 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Murroe (802 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1War of Independence Memorial
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 96% approved, and 1 in 2 are asked for more information.

New house in a garden or site24 decided · more info asked 50%
96% · council 92%
Approved nearbyLimerick City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 24 nearby, 2,583 council-wide

Figure 3

Farnane, file by file since 2019

New houses in side gardens or on sites: 5 of 5.

7 planning files on Farnane since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2020 · other work · approved · 20906No number · 2022 · other work · approved · 22856New house in a side gardenNo number · 2019 · new house · approved · 191077No number · 2021 · new house · approved · 21431No number · 2023 · new house · approved · 2360649No number · 2024 · new house · approved · 2460766No number · 2024 · new house · approved · 2461208
ApprovedRefusedWithdrawn or invalid

7 files with "Farnane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Clonkeen, The Municipal District of Cappamore — Kilmallock, County Limerick, Munster, Éire / Ireland with 3 numbered planning items
    ⌖ the houseApproved
    1. 151 The Oaks, Liscreagh Murroe 2660532Approved with conditions · 288 m
    2. 2Murroewood, Murroe 2561303Approved with conditions · 371 m
    3. 3Murroewood, Murroe 2660167Approved with conditions · 386 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 22 permissions since 2016, 10 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    22 applications lodged within 500 m. Council: 22 approved, 0 refused. After appeals: 22 approved. Of those: 0 signed off, 7 built with the owner's opt-out, 3 started, 7 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT22: lodged → approved22: approved → approved7: approved → no start notice found7: approved → built, owner opted out3: approved → started, not signed off5: approved → ran out22 lodged22 lodged22 approved22 approved22 approved22 approved7 no start notice found7 no start notice found7 built, owner opted out7 built, owner opted out3 started, not signed off3 started, not signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured22 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 6

      Applications within 500 m, by year

      Between 1 and 5 a year; busiest 2022. 100% of decisions were approvals.

      2018: 2, 2019: 1, 2020: 2, 2021: 3, 2022: 5, 2023: 3, 2024: 2, 2025: 2, 2026: 205102018: 2 approved2’18*2019: 1 approved1’192020: 2 approved2’202021: 3 approved3’212022: 5 approved5’222023: 3 approved3’232024: 2 approved2’242025: 2 approved2’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2018 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 4 in the last 12 months

      See every application on the map

      • 151 The Oaks , Liscreagh Murroe , Co. Limerick Approved with conditions
        the conversion of the attic area to habitable accommodation, the installation of a new dormer window to the…
        26605322 Jul 2026288 m
      • 3Murroewood , Murroe , Co. Limerick. Approved with conditions
        a change of house design from that granted under Planning Ref. 22-1039 and all associated site works
        266016713 Apr 20261 homes386 m
      • 2Murroewood , Murroe , Co. Limerick Approved with conditions
        for the construction of a vehicular entrance, single storey dwelling house, wastewater treatment system and…
        256130328 Aug 20261 homes371 m
      • Murroewood , Murroe , Co. Limerick Withdrawn or not valid
        the construction of a vehicular entrance, single storey dwelling house, connection to mains sewer together…
        256116813 Nov 20251 homes371 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      Building work nearby 5 in the last 12 months
      5 no sign-off needed
      • Murroewood, Moroe, Limerick · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 221040 · 427 m
      • Murroewood, Moroe, Limerick · 13 Jul 2026 · short notice no sign-off needed · 221040 · 408 m
      • Murroewood, Moroe, Limerick · 13 Jul 2026 · short notice no sign-off needed · 221039 · 415 m
      • Murroewood, Moroe, Limerick · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660167 · 427 m
      • Farnane, Murroe, Limerick · 7 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2360649 · 480 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Daydreams Childcare · Crèche9 May 2025 · report · Tusla Early Years Inspectorate58 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area About as busy as most of Limerick City and County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here10
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Question 5

      What's the area like?

      Figure 7

      This street block against the council

      0% of homes built before 1971 (council 31%). 67% owner-occupied (council 65%).

      Homes built before 1971
      0% · council 31%
      Homes built since 2001
      90% · council 29%
      Owner-occupied
      67% · council 65%
      Rented
      30% · council 27%
      Children under 15
      34% · council 19%
      Aged 65 and over
      2% · council 16%
      Households with 2+ cars
      52% · council 41%
      Work mainly from home
      7% · council 10%
      This small area (292 people)Limerick City And

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127047004

      Bus
      392 m
      Murroe · 332 · busiest stop within 500 m: 0 an hour at peak
      Nearest school
      559 m
      S N Ma Rua, 142 pupils
      Schools, stops and the council

      Schools

      • S N Ma Rua · primary · 142 pupils · 559 m

      Stops 2

      • Murroe · 332 · 0/hour at peak · 392 m
      • Murroe · 332 · 0/hour at peak · 407 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Ma Rua · 559 m-0.7% pupils (142)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Council consultation portalsPublic20 Oct 2026, 01:41open
      Council meetings (ModernGov)Public20 Oct 2026, 02:32open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (20217): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Farnane
      Electoral division
      Clonkeen
      Electoral area
      Cappamore-Kilmallock
      Council
      Limerick City And County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 20217, approved 2020, work already done.
      • Zoned R2 (existing residential); no vacant land tax.
      • Nothing nearby looks set to change.
      • Murroe (bus 332) 392 m away: 7 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 67% owner-occupied (council 65%); 4% of homes empty (council 8%); most built 2001–2010; 82% drive to work (council 60%); population up 8% since 2016.
      • The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
      • 4 applications nearby in the last 12 months.
      • 10 homes started within 1 km in 3 years (council middle 2).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
      www2.courts.ie—© the publisher20 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 20 Oct 2026, 19:53 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.