Planning report · Limerick City And County Council · 2000 m around the house · the last 12 months · 26 Oct 2026, 04:39

Annacotty

52.65185, -8.54488

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (98%). 114 homes approved 1.8 km away haven't started.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings10Cooleen; Sunninghill
Monuments79Ritual site - holy well; Burial ground
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 159 on the draft 2027 map; 157 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 69% approved, and 1 in 2 are asked for more information.

Single-storey rear12 decided · more info asked 0%
100% · council 97%
Attic or dormer12 decided · more info asked 25%
92% · council 93%
New house in a garden or site16 decided · more info asked 50%
69% · council 91%
Approved nearbyLimerick City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 40 nearby, 2,143 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 5 is asked for more information, which adds about 42 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 5): 94 days; Appeal window: 4 weeks; Building starts: 160 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–54 (n=42)53 daysIf more info asked (1 in 5)With further information: median 94 days (n=10)94 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 160 days after permission (n=13)160 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated52 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 3 appealed refusals became permissions. 2 of 6 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed6 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 15 in the last 12 months
    • 502242 Pending · Newtown Avenue , Castletroy , Co. Limerick · 1.0 km
    • 324286 Granted with conditions · Lands at Monaleen Road, Castletroy, Limerick · 1.7 km
    • 501939 Pending · Newcastle,, Castletroy,, Co. Limerick. · 1.9 km
    • 501091 Granted · Rivers , Annacotty , Co. Limerick · 1.3 km
    • 324206 Granted with conditions · Groody Road & Caisle?n Na hAbhann , Kilbane Castletroy , Limerick · 1.9 km
    • 501129 Refused · 24 Castlebrook Green , Castlebrook Manor , Castletroy Limerick · 1.5 km
    • 500972 Granted · Rivers , Annacotty , Co. Limerick. · 1.6 km
    • 500349 Granted · 19 Castlebrooke Cresent, Castlebrooke Manor, Castletroy, Limerick · 1.7 km
    • 323916 Refused · Lands at Rivers Road, Ballyclogh Townland, Castletroy, Co. Limerick · 1.3 km
    • 323968 Granted with conditions · Golf Links Road and Mount Green Road, Newcastle, Castletroy, Limerick · 1.7 km
    • 324164 Pending · in the townlands of Carrow, Moheragh, Gortaderry, Co. Tipperary;… · 1.1 km
    • 500251 Granted · Rivers, Annacotty, Co. Limerick · 1.3 km
    • 324007 Granted · Golf Links Road and Mount Green Road, Newcastle, Castletroy, Limerick · 1.7 km
    • 324013 Granted · Golf Links Road and Mount Green Road, Newcastle, Castletroy, Limerick · 1.7 km
    • 324024 Granted · Golf Links Road and Mount Green Road, Newcastle, Castletroy, Limerick · 1.7 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Annacotty with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedLarge schemeRefusedBuilding startedEmpty land zoned for homes
    1. 1Grange Upper & Grange Lower, Lisnagry 2661142No decision yet · 1.7 km
    2. 2Kilmurry Lodge Hotel, Dublin Road 2661133No decision yet · 1.9 km
    3. 3The National Technology Park, Plassey 2661145No decision yet · 1.9 km
    4. 4Ballysimon Commons, Co. Limerick 2660923Refused · 1.2 km
    5. 5Golf Links Road and Mount Green Road 2560271Approved, no sign building has started · 1.8 km
    6. 6Newtown, Monaleen Road 2660855No decision yet · 545 m
    7. 7Golf Links Road, Castletroy 2660675No decision yet · 968 m
    8. 8Groody Road & Caisleán Na hAbhann, Kilbane Castletroy 2660089Approved with conditions · 1.9 km
    9. 9Pitch & Putt Course, Monaleen road 2660480Refused · 159 m
    10. 10Newtown, Castletroy 24325Building started · 195 m
    11. 112.0 ha zoned for homesEmpty land zoned for homes · 512 m
    12. 122.1 ha zoned for homesEmpty land zoned for homes · 519 m
    13. 130.4 ha zoned for homesEmpty land zoned for homes · 525 m
    14. 141.3 ha zoned for homesEmpty land zoned for homes · 577 m
    15. 151.2 ha zoned for homesEmpty land zoned for homes · 590 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 9 permissions since 2016, 2 show a start notice and 0 have a completion certificate.

    13 applications lodged within 500 m. Council: 9 approved, 4 refused. After appeals: 9 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 1 started, 6 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT9: lodged → approved4: lodged → refused9: approved → approved4: refused → refused6: approved → no start notice found1: approved → built, owner opted out1: approved → started, not signed off1: approved → ran out13 lodged13 lodged9 approved9 approved4 refused4 refused9 approved9 approved4 refused4 refused6 no start notice found6 no start notice found1 built, owner opted out1 built, owner opted out1 started, not signed off1 started, not signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured13 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    5 deadlines within 2.0 km; the first closes 27 Oct 2026.

    5 deadlines in the next 30 days: 2026-10-27 ACP 324286: Grant permission with revised conditions; 2026-11-02 2661133: application received — the erection of high level building signage to the east elevation and west elevation of Kilmurry Lodge Hotel comprising ; 2026-11-03 2660923: REFUSED — - the construction and operation of a wellness facility incorporating 2no. sauna cabins, 4 no. cold plunge tubs, 2no. ch; 2026-11-03 2661142: application received — a solar photovoltaic farm and co-located Battery Energy Storage System within an application area of approximately 19.57; 2026-11-06 2661145: application received — (1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and devetoday31 Oct5 Nov10 Nov15 Nov20 Nov25 NovACP 324286: Grant permission with revised conditions · 1.7 km away · 2026-10-272661133: application received — the erection of high level building signage to the east elevation and west elevation of Kilmurry Lodge Hotel comprising · 1.9 km away · 2026-11-022660923: REFUSED — - the construction and operation of a wellness facility incorporating 2no. sauna cabins, 4 no. cold plunge tubs, 2no. ch · 1.2 km away · 2026-11-032661142: application received — a solar photovoltaic farm and co-located Battery Energy Storage System within an application area of approximately 19.57 · 1.7 km away · 2026-11-032661145: application received — (1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and deve · 1.9 km away · 2026-11-06
    Comments closeTime to appeal endsHigh Court window ends
    • Time to ask the High Court for a review ends 27 Oct 20261 day left
      Grant permission with revised conditions
      1.7 km away
    • Comments close 2 Nov 20267 days left
      22661133 · application received — the erection of high level building signage to the east elevation and west elevation of Kilmurry…
      €20 to the council · 1.9 km away
    • Time to appeal ends 3 Nov 20268 days left
      42660923 · REFUSED — - the construction and operation of a wellness facility incorporating 2no. sauna cabins, 4 no. cold plunge…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.2 km away
    • Comments close 3 Nov 20268 days left
      12661142 · application received — a solar photovoltaic farm and co-located Battery Energy Storage System within an application…
      €20 to the council · 1.7 km away
    • Comments close 6 Nov 202611 days left
      32661145 · application received — (1) partial change of use of the building from the permitted 'advanced office' use to ‘high…
      €20 to the council · 1.9 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    114 homes 1.8 km away were approved Dec 2025 with no start notice yet; the permission runs to Apr 2031.

    Golf Links Road and Mount… · 114 homes: 114 homes approved Dec 2025, not started202420252026202720282029203020312032Golf Links Road and Mount… · 114 homes1.8 km · 2560271114 homes approved Dec 2025, not started114 homes approved Dec 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 1

    Empty land zoned for homes 10

    • 112.0 ha zoned for homes · no homes built on it yet · 512 m
    • 122.1 ha zoned for homes · no homes built on it yet · 519 m
    • 130.4 ha zoned for homes · no homes built on it yet · 525 m
    • 141.3 ha zoned for homes · no homes built on it yet · 577 m
    • 151.2 ha zoned for homes · no homes built on it yet · 590 m
    • 1.0 ha zoned for homes · no homes built on it yet · 607 m
    • 1.0 ha zoned for homes · no homes built on it yet · 614 m
    • 1.3 ha zoned for homes · no homes built on it yet · 620 m
    • 1.3 ha zoned for homes · no homes built on it yet · 631 m
    • 3.8 ha zoned for homes · no homes built on it yet · 644 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 2 a year; busiest 2024. 69% of decisions were approvals.

    2021: 7, 2023: 1, 2024: 2, 2025: 1, 2026: 205102021: 5 approved2021: 2 refused7’21*2023: 1 approved1’232024: 1 approved2024: 1 refused2’242025: 1 approved1’252026: 1 approved2026: 1 refused2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 49 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 24 in the last 12 months
    9 signed off as finished7 not signed off8 no sign-off needed
    • 18 The Oaks, Briarfield, Castletroy, Limerick, V94 TX3A · 16 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2560918 · 1.8 km
    • Carrigeen, Annacotty, Limerick · 8 Oct 2026 · 74 homes · start notice not signed off · 2560399 · 1.6 km
    • 30 Castlemara, Annacotty, Limerick, V94 R5T3 · 29 Sept 2026 · 1 homes · short notice no sign-off needed · 2660439 · 1.4 km
    • Newtown Road, Limerick, V94 T9WF · 24 Aug 2026 · start notice not signed off · 21/55 · 195 m
    • Newtown Centre, Annacotty, Limerick · 10 Jul 2026 · start notice not signed off · 24/60835 · 1.3 km
    • 10Newtown, Castletroy, Limerick, V94 T9WF · 28 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 24325 · 195 m
    • Old Ballysimon Road, Limerick · 20 Apr 2026 · short notice no sign-off needed · 2460423 · 2.0 km
    • Newtown Meadows, Limerick · 10 Apr 2026 · 36 homes · start notice not signed off · 2460420 · 1.0 km
    • Newtown Meadows, Limerick · 10 Apr 2026 · 36 homes · start notice not signed off · 2460420 · 1.1 km
    • Monaleen Road, Limerick · 23 Mar 2026 · 7-day notice signed off · 783 m
    • Monaleen Road, Limerick · 23 Mar 2026 · 7-day notice signed off · 782 m
    • Monaleen Road, Limerick · 23 Mar 2026 · 7-day notice signed off · 793 m
    • Monaleen Road, Limerick · 23 Mar 2026 · 7-day notice signed off · 777 m
    • Old Ballysimon Rd, Limerick, V94 HP9R · 18 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2460423 · 2.0 km
    • Golf Links Road, Limerick, V94 H9TX · 18 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60029 · 1.7 km
    • Monaleen Road, Limerick · 23 Feb 2026 · 7-day notice signed off · 779 m
    • Monaleen Road, Limerick · 23 Feb 2026 · 7-day notice signed off · 733 m
    • Monaleen Road, Limerick · 23 Feb 2026 · 7-day notice signed off · 753 m
    • Walkers Road and Dublin Road, Newcastle, Castletroy, Limerick, Limerick, V94 232W · 20 Feb 2026 · 7-day notice signed off · 1.8 km
    • Dublin Road, Limerick, V94 X884 · 29 Jan 2026 · start notice signed off · 1.7 km
    • 52 Glanntan, Castletroy, Limerick, V94 WPW2 · 28 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560035 · 1.3 km
    • Woodstown View, Annacotty, Limerick · 22 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 21587 · 1.9 km
    • Units 7 & 8/9, Castletroy Shopping Centre, Castletroy,, Limerick, V94 XC78 · 18 Dec 2025 · 7-day notice not signed off · 2560878 · 1.7 km
    • DUBLIN ROAD, CASTLETROY, LIMERICK, Limerick, V94 WTC9 · 10 Nov 2025 · start notice not signed off · 24/61097 · 2.0 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 114 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area About as busy as most of Limerick City and County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here7
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    21% of homes built before 1971 (council 31%). 88% owner-occupied (council 65%).

    Homes built before 1971
    21% · council 31%
    Homes built since 2001
    20% · council 29%
    Owner-occupied
    88% · council 65%
    Rented
    3% · council 27%
    Children under 15
    12% · council 19%
    Aged 65 and over
    31% · council 16%
    Households with 2+ cars
    59% · council 41%
    Work mainly from home
    13% · council 10%
    This small area (315 people)Limerick City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127026037

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Nearest school
    788 m
    Scoil Moin A Lin, 847 pupils
    Schools, stops and the council

    Schools

    • Scoil Moin A Lin · primary · 847 pupils · 788 m
    • Castletroy College · postprimary · 1360 pupils · 1.3 km
    • Gaelscoil Chaladh An Treoigh · primary · 412 pupils · 1.7 km

    Stops 10

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Moin A Lin · 788 m0% pupils (847)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Council consultation portalsPublic26 Oct 2026, 00:55open
      Council meetings (ModernGov)Public26 Oct 2026, 01:54open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Application 1.7 km away open for comments until 3 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Killonan
      Electoral division
      Ballysimon
      Electoral area
      Limerick City East
      Council
      Limerick City And County Council
      Everything we found, as a list 8 lines
      • No vacant land tax.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 3 applications open for comments nearby; nearest closes 3 Nov 2026.
      • 114 homes approved nearby, not started; largest 114 at Golf Links Road and Mount Green Road.
      • No scheduled public transport within 800 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 88% owner-occupied (council 65%); 2% of homes empty (council 8%); most built 1971–1980; 66% drive to work (council 60%); population up 22% since 2016.
      • 1 home extension within 250 m since 2026.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
      www2.courts.ie—© the publisher25 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 26 Oct 2026, 04:39 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.