Bloodmill Road, Castletroy
Homes here mostly date from after 2016. 2 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (97%). 111 homes approved 229 m away haven't started.
Not held yet for Limerick City and County Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 53 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 5 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built after 2016, with building records online. 2 planning files on this house, the latest from 2025.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 20252560063 · alterations · approved 2025 · not started, runs out 2028approvedstartedsigned off
- 20242360740 · apartments · approved 2024 · not started, runs out 2028approvedstartedsigned off
Zoning, protection, tax and flood: the detail
What it says
Mixed Use: To provide for a mixture of residential and compatible commercial uses.
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
limerick development plan 2022 2028 · 29 Jul 2022 – 1 Jun 2028
Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
| Within 500 m | Count | For example |
|---|---|---|
| Monuments | 19 | Well; Ritual site - holy well |
How we work this out
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 19 Oct 2026, 00:29
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 18 Oct 2026, 23:24 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 19 Oct 2026, 00:29 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 89% approved, and 1 in 2 are asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 79 nearby, 3,715 council-wide
Towlerton, file by file since 2017
16 files with "Towlerton" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2017–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 53 days. 1 in 4 is asked for more information, which adds about 63 days. Building starts about 5 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated125 decided home extensions, 40 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
1 of 9 appealed refusals became permissions. 2 of 14 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 1 in the last 12 months
- 324206 Granted with conditions · Groody Road & Caisle?n Na hAbhann , Kilbane Castletroy , Limerick · 278 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 20 Oct 2026, 01:39 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
What's changing around you?
- 1Towlerton 2560063
- 2Towlerton 2660275
- 3Groody Road & Caisleán Na hAbhann 2660089
- 42.6 ha zoned for homes
- 5Bloodmill Road, Towlerton 22950
- 64.9 ha zoned for homes
- 70.8 ha zoned for homes
- 81.2 ha zoned for homes
- 93.0 ha zoned for homes
- 100.4 ha zoned for homes
- 11Towlerton, Ballysimon 2660731
- 12City East Plaza, Towlerton 2561317
What happens to applications within 500 m
Permission isn't building. Of 19 permissions since 2016, 6 show a start notice and 6 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured19 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
111 homes 229 m away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 12 within 500 m
Approved, not started 3
- Towlerton · 48 homes approved Apr 2025, not started · 1 m
- Towlerton · 111 homes approved Sep 2026, not started · 229 m
- Groody Road & Caisleán Na hAbhann · 22 homes approved Mar 2026, not started · 335 m
Empty land zoned for homes 9
- 42.6 ha zoned for homes · no homes built on it yet · 66 m
- 64.9 ha zoned for homes · no homes built on it yet · 153 m
- 70.8 ha zoned for homes · no homes built on it yet · 199 m
- 81.2 ha zoned for homes · no homes built on it yet · 246 m
- 93.0 ha zoned for homes · no homes built on it yet · 257 m
- 100.4 ha zoned for homes · no homes built on it yet · 264 m
- 0.1 ha zoned for homes · no homes built on it yet · 372 m
- 1.0 ha zoned for homes · no homes built on it yet · 391 m
- 2.0 ha zoned for homes · no homes built on it yet · 0 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
| Derelict sites registers | CC BY 4.0 | 19 Oct 2026, 23:17 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 19 Oct 2026, 00:29 | open |
Applications within 500 m, by year
Between 1 and 4 a year; busiest 2025. 100% of decisions were approvals.
2017 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 4 in the last 12 months
See every application on the map
- 11Towlerton , Ballysimon , Limerick Approved with conditionsmodifications to the permitted Building C under Application Register Reference 25/60219 (originally granted…
- 2Towlerton , Ballysimon , Limerick Approved with conditionsa Large-Scale Residential Development (LRD) Application Development of 212 no. Residential Units and a…
- 3Groody Road & Caisleán Na hAbhann , Kilbane Castletroy , Limerick Approved with conditionsa Large Scale Residential Development (LRD) on land situated between the Groody Road and Caisleán Na hAbhann,…
- 12City East Plaza , Towlerton , Ballysimon Co. Limerick. Approved with conditionsthe development of a site which adjoins the existing Northern Trust offices and comprises that area of land…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
Building work nearby 1 in the last 12 months
- 5Bloodmill Road, Towlerton, Limerick · 18 Sept 2026 · 7-day notice not signed off · 22950 · 89 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
Homes coming 181 not started
- 2Towlerton · 111 homes · not started · runs out 22 Sept 2031 · 229 m
- 1Towlerton · 48 homes · not started · runs out 4 Sept 2028 · 1 m
- Towlerton · 38 homes · building started · 63 m
- 3Groody Road & Caisleán Na hAbhann · 22 homes · not started · runs out 21 Jul 2031 · 335 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
| Social housing construction status report | CC BY-SA 4.0 | 9 Oct 2026, 23:01 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| The Old School ABC · Crèche | 15 Apr 2026 · report · Tusla Early Years Inspectorate | approx. 939 m |
| Tall Trees Childcare · Crèche | 11 May 2026 · report · Tusla Early Years Inspectorate | 988 m |
How we work this out
How busy is this area Busier than most of Limerick City and County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 20 Oct 2026, 01:45 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
What's the area like?
This street block against the council
90% owner-occupied (council 65%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 127026016/01
Schools, stops and the council
Schools
- Limerick Educate Together Secondary School · postprimary · 811 pupils · 286 m
Stops 13
- Brookfield Hl · 310 · 2/hour at peak · 296 m
- Caisleán na hAbhann · 310 · 2/hour at peak · 306 m
- City E Pza · 310 · 2/hour at peak · 344 m
- Caisleán na hAbhann · 310 · 2/hour at peak · 358 m
- City E Pza · 310 · 2/hour at peak · 364 m
- Brú na Gruadán · 310 · 2/hour at peak · 514 m
- Brú na Gruadán · 310 · 2/hour at peak · 543 m
- Amharc Muileann · 310 · 2/hour at peak · 576 m
Schools growing or shrinking planning in 3 years · pupils last year
- Limerick Educate Together Secondary School · 286 m+13.6% pupils (811)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 18 Oct 2026, 23:44 | open |
| Department of Education school list | CC BY 4.0 | 27 Sept 2026, 23:32 | open |
| National Planning Application Database | CC BY 4.0 | 20 Oct 2026, 02:09 | open |
| Council consultation portals | Public | 20 Oct 2026, 01:41 | open |
| Council meetings (ModernGov) | Public | 20 Oct 2026, 02:32 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Alterations (2560063) approved 2025, not started: still planned?Seller · solicitorAsk for: The grant, and whether it stays with the house.
- Apartments (2360740) approved 2024, not started: still planned?Seller · solicitorAsk for: The grant, and whether it stays with the house.
- On the vacant land tax map: is the 3% tax being paid?SolicitorAsk for: Your solicitor's check of liability or exemption.
- 48 homes approved 1 m away (Towlerton), not started: what is planned?CouncilAsk for: The planning file for 2560063.
- 111 homes approved 229 m away (Towlerton), not started: what is planned?CouncilAsk for: The planning file for 2660275.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Towlerton
- Electoral division
- Ballysimon
- Electoral area
- Limerick City East
- Council
- Limerick City And County Council
Everything we found, as a list 8 lines
- 2 applications on this site; latest 2560063, approved 2025, not started, runs out 2028.
- Zoned M1 (metro / rail economic corridor); on the vacant land tax map.
- 12 sites nearby could change: 3 approved schemes, 9 empty zoned plots.
- 181 homes approved nearby, not started; largest 111 at Towlerton.
- Brookfield Hl (bus 310) 296 m away: 2 an hour at morning peak; 10 from all stops within 500 m.
- Here (2022 census): 90% owner-occupied (council 65%); 5% of homes empty (council 8%); most built 2016 or later; 73% drive to work (council 60%); population up 22% since 2016.
- Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
- Homes started within 1 km: 34 in the last year, 19 three years before.
What the terms mean 6 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 25
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 16 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 20 Oct 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 20 Oct 2026 |
| www2.courts.ie | — | © the publisher | 20 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 19 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 18 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 20 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 20 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 20 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 18 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 9 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 14 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 18 Oct 2026 |