Planning report · Limerick City And County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 11:32

Augustinian Lane, Shannon B

52.66237, -8.62737

Homes here mostly date from before 1919. 4 planning files on this house, the latest from 2026. Home extensions nearby almost always get approved (94%). 111 homes approved 389 m away haven't started.

See on the mapWatch this area

Not held yet for Limerick City and County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 4 planning files on this house, the latest from 2026.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 4 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2026: 2661020 · apartments, approved2026: 2560904 · garden room, approved2025: 2560482 · garden room, withdrawn or invalid2022: 221037 · work already done, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2661020 · apartments · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  2. 2026
    2560904 · garden room · approved 2026 · started, not signed off
    approvedstartedsigned off
  3. 2025
    2560482 · garden room · withdrawn
    approved?started?signed off?
  4. 2022
    221037 · work already done · approved 2022 · work already done
    approvedstartedsigned off?
On this site
M2
Zoning · Major town centre
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

City Centre: To protect, consolidate and facilitate the development of the City Centre commercial, retail, educational, leisure, residential, social and community uses and facilities.

The main town centre — retail, offices, civic uses, apartments.

limerick development plan 2022 2028 · 29 Jul 2022 – 1 Jun 2028

Heritage inventory26 within 100 m shop/retail outlet; Saint Augustine's Catholic Church

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Limerick Gasworks (749 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings310store/warehouse; The Old Maternity Hospital
Monuments5Excavation - miscellaneous; Sheela-na-gig (present location)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 25 on the draft 2027 map; 22 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–95% by type. A new house in a garden is harder: 81% approved, and 1 in 2 is asked for more information.

Single-storey rear44 decided · more info asked 43%
93% · council 97%
Two-storey rear20 decided · more info asked 50%
90% · council 97%
Attic or dormer39 decided · more info asked 44%
95% · council 93%
First-floor16 decided · more info asked 25%
88% · council 93%
New house in a garden or site16 decided · more info asked 44%
81% · council 91%
Approved nearbyLimerick City And overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 135 nearby, 2,374 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 71 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 126 days; Appeal window: 4 weeks; Building starts: 138 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 49–55 (n=118)53 daysIf more info asked (1 in 3)With further information: median 126 days (n=79)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 138 days after permission (n=55)138 days after permissionSigned off56% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated197 decided home extensions, 55 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 8 appealed refusals became permissions. 3 of 29 appealed approvals were reversed.

    Refusals appealed8 decided
    2 became permissions
    Approvals appealed29 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 5 in the last 12 months
    • 501218 Refused · Whitewater Boutique , Denmark Street , Limerick. · 260 m
    • 500956 Refused · 23 Sarsfield Street , Limerick · 232 m
    • 500247 Granted · 3-4 Robert Street , Prior's Land , Limerick · 294 m
    • 500749 Granted with conditions · 4 Lower Gerald Griffin Street, Limerick, Limerick · 371 m
    • 323849 Other · 'Cleeves Riverside Quarter' in the townland of Farranshone More in… · 449 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Augustinian Lane, Shannon B with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homes
    1. 1No.35 Cecil Street, Limerick 2661144No decision yet · 117 m
    2. 228 & 29 William Street Upper, Limerick. 268461No decision yet · 457 m
    3. 316 Thomas St., Limerick. 26156Approved with conditions · 123 m
    4. 4Augustinian Lane, Roches Street 2661020Approved with conditions · 0 m
    5. 594 O'Connell Street 221367Approved, no sign building has started · 247 m
    6. 634-41 Catherine St. 2561242Approved, no sign building has started · 277 m
    7. 73-4 Robert Street 2560365Approved, no sign building has started · 304 m
    8. 848 - 50 Parnell Street 2660134Approved, no sign building has started · 308 m
    9. 9High Street 2460633Approved, no sign building has started · 354 m
    10. 10No. 1–4 James Street and 6 and 7 Upper Mallow Street 2360345Approved, no sign building has started · 370 m
    11. 11McEnery's Shop and Railway Hotel 221172Approved, no sign building has started · 389 m
    12. 12Michael Street 2560771Approved, no sign building has started · 468 m
    13. 130.2 ha zoned for homesEmpty land zoned for homes · 181 m
    14. 140.1 ha zoned for homesEmpty land zoned for homes · 206 m
    15. 151.5 ha zoned for homesEmpty land zoned for homes · 341 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 138 permissions since 2016, 35 show a start notice and 7 have a completion certificate.

    151 applications lodged within 500 m. Council: 140 approved, 11 refused. After appeals: 138 approved. Of those: 7 signed off, 3 built with the owner's opt-out, 25 started, 97 with no start notice found, 6 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT140: lodged → approved11: lodged → refused138: approved → approved11: refused → refused2 approved by the council, refused after an appeal97: approved → no start notice found3: approved → built, owner opted out25: approved → started, not signed off7: approved → signed off6: approved → ran out151 lodged151 lodged140 approved140 approved11 refused11 refused138 approved138 approved13 refused13 refused97 no start notice found97 no start notice found3 built, owner opted out3 built, owner opted out25 started, not signed off25 started, not signed off7 signed off7 signed off6 ran out6 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured151 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    5 deadlines within 500 m; the first closes 4 Nov 2026.

    5 deadlines in the next 30 days: 2026-11-04 268461: application received — demolition of an existing single-storey derelict former dwelling, including rear ancillary extension and outbuildings, a; 2026-11-05 2661144: application received — a) the change of use of the ground floor from commercial use to residential use, b) the change of use of the first, seco; 2026-11-06 26156: CONDITIONAL — a change of use of the existing apartments at first, second and third floor levels into student accommodation with commu; 2026-11-12 ACP 501218: Refuse permission; 2026-11-18 2661020: CONDITIONAL — change of development Granted permission under Planning Ref. 25/60904 for the following : the conversion of existing grotoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec268461: application received — demolition of an existing single-storey derelict former dwelling, including rear ancillary extension and outbuildings, a · 457 m away · 2026-11-042661144: application received — a) the change of use of the ground floor from commercial use to residential use, b) the change of use of the first, seco · 117 m away · 2026-11-0526156: CONDITIONAL — a change of use of the existing apartments at first, second and third floor levels into student accommodation with commu · 123 m away · 2026-11-06ACP 501218: Refuse permission · 260 m away · 2026-11-122661020: CONDITIONAL — change of development Granted permission under Planning Ref. 25/60904 for the following : the conversion of existing gro · 0 m away · 2026-11-18
    Comments closeTime to appeal endsHigh Court window ends
    • Comments close 4 Nov 20263 days left
      2268461 · application received — demolition of an existing single-storey derelict former dwelling, including rear ancillary…
      €20 to the council · 457 m away
    • Comments close 5 Nov 20264 days left
      12661144 · application received — a) the change of use of the ground floor from commercial use to residential use, b) the change…
      €20 to the council · 117 m away
    • Time to appeal ends 6 Nov 20265 days left
      326156 · CONDITIONAL — a change of use of the existing apartments at first, second and third floor levels into student…
      €220 to An Coimisiún Pleanála (€110 observer) · 123 m away
    • Time to ask the High Court for a review ends 12 Nov 202611 days left
      Refuse permission
      260 m away
    • Time to appeal ends 18 Nov 202617 days left
      42661020 · CONDITIONAL — change of development Granted permission under Planning Ref. 25/60904 for the following : the conversion…
      €220 to An Coimisiún Pleanála (€110 observer) · 0 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    111 homes 389 m away were approved Jun 2023 with no start notice yet; the permission runs to May 2029.

    McEnery's Shop and… · 111 homes: 111 homes approved Jun 2023, not started; 34-41 Catherine St. · 76 homes: 76 homes approved Jun 2026, not started; 48 - 50 Parnell Street · 32 homes: 32 homes approved May 2026, not started; 94 O'Connell Street · 24 homes: 24 homes approved Sep 2023, not started2023202420252026202720282029203020312032McEnery's Shop and… · 111 homes389 m · 221172111 homes approved Jun 2023, not started111 homes approved Jun 2023, not started34-41 Catherine St. · 76 homes277 m · 256124276 homes approved Jun 2026, not started76 homes approved Jun 2026, not started48 - 50 Parnell Street · 32 homes308 m · 266013432 homes approved May 2026, not started32 homes approved May 2026, not started94 O'Connell Street · 24 homes247 m · 22136724 homes approved Sep 2023, not started24 homes approved Sep 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 13 within 500 m

    Approved, not started 8

    Empty land zoned for homes 5

    • 130.2 ha zoned for homes · no homes built on it yet · 181 m
    • 140.1 ha zoned for homes · no homes built on it yet · 206 m
    • 151.5 ha zoned for homes · no homes built on it yet · 341 m
    • 2.2 ha zoned for homes · no homes built on it yet · 474 m
    • 3.4 ha zoned for homes · no homes built on it yet · 479 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 28 and 34 a year; busiest 2025. 93% of decisions were approvals.

    2021: 19, 2022: 28, 2023: 29, 2024: 29, 2025: 34, 2026: 120102030402021: 19 approved19’21*2022: 27 approved2022: 1 refused28’222023: 26 approved2023: 3 refused29’232024: 26 approved2024: 3 refused29’242025: 31 approved2025: 3 refused34’252026: 11 approved2026: 1 refused12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 228 & 29 William Street Upper , Limerick. comments close 4 Nov 2026
      demolition of an existing single-storey derelict former dwelling, including rear ancillary extension and…
      26846130 Sept 2026457 m
    • 1No.35 Cecil Street , Limerick comments close 5 Nov 2026
      a) the change of use of the ground floor from commercial use to residential use, b) the change of use of the…
      26611441 Oct 2026117 m
    Every application within 500 m 37 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 13 in the last 12 months
    1 signed off as finished12 not signed off
    • The Bishops Quay, Limerick · 30 Sept 2026 · start notice not signed off · 380 m
    • Unit 2 @ 1BQ, Bishop's Quay, Limerick · 31 Aug 2026 · 7-day notice not signed off · 2461201 · 251 m
    • 37B Cruise's Street, Limerick, V94 Y6F9 · 8 Jun 2026 · 1 homes · start notice not signed off · 215 m
    • 43 Wickham Street, Limerick, V94 K667 · 5 Jun 2026 · start notice not signed off · 24/61272 · 274 m
    • 66 O'Connell Street, Limerick, v94 XK2R · 24 Apr 2026 · 9 homes · 7-day notice not signed off · 24/60151 · 351 m
    • 11 Glentworth Street, Limerick, V94 X3C7 · 20 Apr 2026 · start notice not signed off · 25/282 · 205 m
    • 6 William Street, Limerick, V94 EF85 · 23 Feb 2026 · 6 homes · start notice not signed off · 2461298 · 181 m
    • 21 Upper Gerald Griffin Street, Limerick, V94N938 · 9 Feb 2026 · 1 homes · start notice signed off · 2560673 · 299 m
    • Augustinian Lane, Roches Street, Limerick, V94 R60H · 31 Jan 2026 · 6 homes · 7-day notice not signed off · 25/60904 · 12 m
    • 69 Catherine Street, Limerick, V94 R7N2 · 30 Jan 2026 · 1 homes · start notice not signed off · 48 m
    • 3 Michael Street, Limerick, V94 4X26 · 23 Jan 2026 · start notice not signed off · ABP-304028-19 & ABP-311981-21 & ABP-315085-22 · 497 m
    • 45 Cecil Street, Limerick, V94 HX85 · 7 Jan 2026 · start notice not signed off · 25/60568 · 125 m
    • 18 Cecil Street, Limerick, V94 RX23 · 10 Nov 2025 · 3 homes · 7-day notice not signed off · 155 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 313 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Riocht na Si · Crèche16 May 2024 · report · Tusla Early Years Inspectorate134 m
    Nursery Times · Crèche31 Jan 2025 · report · Tusla Early Years Inspectorate335 m
    Limerick Social Service Council Early Years Service · Crèche25 Aug 2025 · report · Tusla Early Years Inspectorate344 m
    OneWorld Pre- School · Crèche5 Nov 2025 · report · Tusla Early Years Inspectorate344 m
    Coolmine Mid-West Early Years Service · Crèche29 Jan 2026 · report · Tusla Early Years Inspectorate386 m
    Poppins's Pre- School Professionals · Crèche27 Nov 2024 · report · Tusla Early Years Inspectorate438 m
    Presentation Pre- School · Crèche22 Oct 2025 · report · Tusla Early Years Inspectorate484 m
    Clanmaurice Preschool · Crèche31 Jul 2025 · report · Tusla Early Years Inspectorate653 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Limerick City and County Council.
    Homes approved
    Here675
    Council middle0
    Homes started
    Here230
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    50% of homes built before 1971 (council 31%). 2% owner-occupied (council 65%).

    Homes built before 1971
    50% · council 31%
    Homes built since 2001
    6% · council 29%
    Owner-occupied
    2% · council 65%
    Rented
    63% · council 27%
    Children under 15
    4% · council 19%
    Aged 65 and over
    7% · council 16%
    Households with 2+ cars
    2% · council 41%
    Work mainly from home
    9% · council 10%
    This small area (248 people)Limerick City And

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 128034003

    Bus
    43 m
    Roches Street · 303, 304, 305 · busiest stop within 500 m: 14 an hour at peak
    Nearest school
    328 m
    St Augustines Spec Sch, 24 pupils
    Schools, stops and the council

    Schools

    • St Augustines Spec Sch · primary · 24 pupils · 328 m
    • Coláiste Nano Nagle · postprimary · 365 pupils · 424 m
    • Presentation Primary School · primary · 279 pupils · 484 m
    • St Michaels Ns · primary · 126 pupils · 520 m
    • Scoil Iosagain · primary · 222 pupils · 520 m
    • Colaiste Mhichil · postprimary · 349 pupils · 544 m
    • St Michaels · primary · 116 pupils · 557 m
    • Limerick School Project · primary · 203 pupils · 714 m

    Stops 58

    • Roches Street · 303, 304, 305, 310 · 10/hour at peak · 43 m
    • O'Connell Street · 301, 304, 306, WI05 · 7/hour at peak · 140 m
    • Harvey's Quay · 303, 305A, 306, 310, 314, 320 · 6/hour at peak · 169 m
    • Harvey's Quay · 302, 317, 317A, 330X, 343 · 6/hour at peak · 171 m
    • William Street · 303, 304, 305, 305A, 309, 310 · 14/hour at peak · 174 m
    • Sarsfield St · 304, 310 · 6/hour at peak · 188 m
    • Sarsfield St · 302, 306, 310 · 1/hour at peak · 202 m
    • Henry Street · 251, 301, 304, 306 · 7/hour at peak · 254 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Augustines Spec Sch · 328 m0% pupils (24)
    • Coláiste Nano Nagle · 424 m+2.5% pupils (365)
    • Presentation Primary School · 484 m-0.7% pupils (279)
    • St Michaels Ns · 520 m+9.6% pupils (126)
    • Scoil Iosagain · 520 m-2.6% pupils (222)
    • Colaiste Mhichil · 544 m+0.9% pupils (349)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (2560904) started Jan 2026, never signed off: is it finished?
      Ask for: The completion certificate, or an engineer's opinion of compliance.
      Seller · solicitor
    2. Apartments (2661020) approved 2026, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    3. Work already done (221037): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    4. 24 homes approved 247 m away (94 O'Connell Street), not started: what is planned?
      Ask for: The planning file for 221367.
      Council
    5. Application 117 m away open for comments until 5 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Prior's-Land
    Electoral division
    Shannon B
    Electoral area
    Limerick City West
    Council
    Limerick City And County Council
    Everything we found, as a list 8 lines
    • 1 job on this site started but never signed off as finished.
    • Zoned M2 (major town centre); no vacant land tax.
    • 13 sites nearby could change: 8 approved schemes, 5 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 5 Nov 2026.
    • 313 homes approved nearby, not started; largest 111 at McEnery's Shop and Railway Hotel.
    • William Street (bus 303, 304) 174 m away: 14 an hour at morning peak; 138 from all stops within 500 m.
    • Here (2022 census): 63% rent (council 27%); 7% of homes empty (council 8%); most built before 1919; 4% drive to work (council 60%); population up 34% since 2016.
    • The council decides in a median 61 days (about 9 weeks); 42% are asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 11:32 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.