PlanningRegister.ie
Planning report · Kilkenny County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 07:12

Castlecomer Road

52.66657, -7.25200

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (95%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Kilkenny County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of GlendineBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 1 file on Glendine2022: 1 file on Glendine2023: 1 file on Glendine2024: 1 file on Glendine2025: 3 files on Glendine2026: 1 file on Glendine8 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kilkenny city and county development plan 2021 2027 · 15 Oct 2021 – 14 Oct 2027

ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kilkenny city and county development plan 2021 variation 8b · 15 Oct 2021 – 15 Oct 2027

Heritage inventory1 within 100 m bridge

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings6Richview House; Weston House
Monuments4Enclosure - large enclosure; Burial
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 20 on the draft 2027 map; 20 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

Single-storey rear28 decided · more info asked 29%
96% · council 95%
Two-storey rear12 decided · more info asked 42%
100% · council 99%
Attic or dormer12 decided · more info asked 42%
100% · council 94%
New house in a garden or site27 decided · more info asked 63%
100% · council 85%
Approved nearbyKilkenny overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 79 nearby, 1,441 council-wide

Figure 3

Glendine, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

8 planning files on Glendine since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 21952No. 41 · 2023 · single-storey rear · approved · 2360293No number · 2024 · attic conversion / dormer · approved · 2460389Porches, roofs, otherNo number · 2025 · other work · refused · 2560065No number · 2025 · other work · approved · 2560271No number · 2025 · other work · approved · 2560629No number · 2026 · other work · approved · 2660090New house in a side gardenNo number · 2022 · new house · approved · 22772
ApprovedRefusedWithdrawn or invalid

8 files with "Glendine" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 63 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 118 days; Appeal window: 4 weeks; Building starts: 195 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=74)53 daysIf more info asked (1 in 3)With further information: median 118 days (n=37)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 195 days after permission (n=41)195 days after permissionSigned off68% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated111 decided home extensions, 41 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 9 appealed refusals became permissions. 3 of 9 appealed approvals were reversed.

    Refusals appealed9 decided
    2 became permissions
    Approvals appealed9 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500630 Refused · Glendine Road , Glendine , Kilkenny. · 142 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Castlecomer Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingAppealEmpty land zoned for homesNo decision yetApproved
    1. 19 Crann Arda, Newpark Lower Castlecomer Road 2660659No decision yet · 354 m
    2. 2NEWPARK LOWER, CASTLECOMER ROAD 2660306Approved with conditions · 168 m
    3. 3No.10 Ardilea, Castlecomer Rd 2660068Refused · 457 m
    4. 4Glendine Road, Glendine 500630Appeal: refused · 142 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 15 m
    6. 68.9 ha zoned for homesEmpty land zoned for homes · 56 m
    7. 71.5 ha zoned for homesEmpty land zoned for homes · 83 m
    8. 84.6 ha zoned for homesEmpty land zoned for homes · 125 m
    9. 94.3 ha zoned for homesEmpty land zoned for homes · 142 m
    10. 108.8 ha zoned for homesEmpty land zoned for homes · 143 m
    11. 11NEWPARK LOWER, CASTLECOMER ROAD 2660615No decision yet · 168 m
    12. 12Bleach Road, Dunmore 2560763No decision yet · 288 m
    13. 13Rossmore, Castlecomer Road 2660079Approved with conditions · 396 m
    14. 14Kilkenny College, Glendine Road 2660141Approved with conditions · 452 m
    15. 15KILKENNY GOLF CLUB, GLENDINE 2660090Approved with conditions · 462 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 56 permissions since 2016, 19 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    61 applications lodged within 500 m. Council: 57 approved, 4 refused. After appeals: 56 approved. Of those: 4 signed off, 10 built with the owner's opt-out, 5 started, 28 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT57: lodged → approved4: lodged → refused56: approved → approved4: refused → refused1 approved by the council, refused after an appeal28: approved → no start notice found10: approved → built, owner opted out5: approved → started, not signed off4: approved → signed off9: approved → ran out61 lodged61 lodged57 approved57 approved4 refused4 refused56 approved56 approved5 refused5 refused28 no start notice found28 no start notice found10 built, owner opted out10 built, owner opted out5 started, not signed off5 started, not signed off4 signed off4 signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured61 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 19 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-19 2660068: REFUSED — for - 1. Material change of use of existing detached domestic garage to use as a 2 storey dormer style family flat. ; 2026-11-19 2660659: application received — to construct a garage, gym and home office and all associated site development works; 2026-11-24 2660306: CONDITIONAL — to demolish a disused timber pre-fabricated single storey structure with associated site works to the rear of Newpark Gatoday10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec2660068: REFUSED — for - 1. Material change of use of existing detached domestic garage to use as a 2 storey dormer style family flat. · 457 m away · 2026-11-192660659: application received — to construct a garage, gym and home office and all associated site development works · 354 m away · 2026-11-192660306: CONDITIONAL — to demolish a disused timber pre-fabricated single storey structure with associated site works to the rear of Newpark Ga · 168 m away · 2026-11-24
    Comments closeTime to appeal ends
    • Time to appeal ends 19 Nov 202614 days left
      32660068 · REFUSED — for - 1. Material change of use of existing detached domestic garage to use as a 2 storey dormer style family…
      €220 to An Coimisiún Pleanála (€110 observer) · 457 m away
    • Comments close 19 Nov 202614 days left
      12660659 · application received — to construct a garage, gym and home office and all associated site development works
      €20 to the council · 354 m away
    • Time to appeal ends 24 Nov 202619 days left
      22660306 · CONDITIONAL — to demolish a disused timber pre-fabricated single storey structure with associated site works to the…
      €220 to An Coimisiún Pleanála (€110 observer) · 168 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 50.3 ha zoned for homes · no homes built on it yet · 15 m
    • 68.9 ha zoned for homes · no homes built on it yet · 56 m
    • 71.5 ha zoned for homes · no homes built on it yet · 83 m
    • 84.6 ha zoned for homes · no homes built on it yet · 125 m
    • 94.3 ha zoned for homes · no homes built on it yet · 142 m
    • 108.8 ha zoned for homes · no homes built on it yet · 143 m
    • 2.5 ha zoned for homes · no homes built on it yet · 169 m
    • 0.8 ha zoned for homes · no homes built on it yet · 301 m
    • 1.0 ha zoned for homes · no homes built on it yet · 303 m
    • 0.7 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 8

    Applications within 500 m, by year

    Between 10 and 16 a year; busiest 2023. 93% of decisions were approvals.

    2021: 8, 2022: 10, 2023: 16, 2024: 10, 2025: 12, 2026: 5051015202021: 8 approved8’21*2022: 9 approved2022: 1 refused10’222023: 16 approved16’232024: 10 approved10’242025: 10 approved2025: 2 refused12’252026: 4 approved2026: 1 refused5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 9 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 2 in the last 12 months
    1 not signed off1 no sign-off needed
    • Newpark Lower, Castlecomer Road,, Kilkenny · 19 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2360498 · 380 m
    • Beechwood, Richview, Castlecomer Road., Kilkenny · 5 Dec 2025 · 2 homes · start notice not signed off · 2560056 · 368 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Fairy Folk · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorate505 m
    The Growing Patch Childcare Centre · Crèche20 Mar 2026 · report · Tusla Early Years Inspectorate628 m
    Early Days Montessori · Crèche24 Jul 2025 · report · Tusla Early Years Inspectorate660 m
    Tiddlywinks Creche · Crèche22 Apr 2025 · report · Tusla Early Years Inspectorate911 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Kilkenny County Council.
    Homes approved
    Here18
    Council middle0
    Homes started
    Here47
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    63% owner-occupied (council 72%).

    Homes built before 1971
    32% · council 29%
    Homes built since 2001
    31% · council 34%
    Owner-occupied
    63% · council 72%
    Rented
    29% · council 23%
    Children under 15
    18% · council 20%
    Aged 65 and over
    21% · council 16%
    Households with 2+ cars
    41% · council 50%
    Work mainly from home
    14% · council 11%
    This small area (434 people)Kilkenny

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 097062013

    Road noise
    70–74 dB
    day–night average (EPA 2022)
    Bus
    44 m
    Kilkenny Coll · 897 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    170 m
    Kilkenny Mixed NS, 198 pupils
    Schools, stops and the council

    Schools

    • Kilkenny Mixed NS · primary · 198 pupils · 170 m
    • Kilkenny College · postprimary · 928 pupils · 324 m
    • St Canices Central NS · primary · 648 pupils · 972 m

    Stops 18

    • Kilkenny Coll · 897 · 0/hour at peak · 44 m
    • Kilkenny Coll · KK1 · 2/hour at peak · 250 m
    • Kilkenny Coll · KK1 · 2/hour at peak · 251 m
    • Glendine · 897, KK1 · 2/hour at peak · 337 m
    • Glendine · KK1 · 2/hour at peak · 578 m
    • Newpark Lwr · KK1 · 2/hour at peak · 664 m
    • Glendine · 897 · 0/hour at peak · 689 m
    • Newpark Lwr · KK1 · 2/hour at peak · 710 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Kilkenny Mixed NS · 170 m-4.8% pupils (198)
    • Kilkenny College · 324 m+1% pupils (928) · a pitch or play area 2026, approved with conditions
    • St Canices Central NS · 972 m+0.5% pupils (648)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Application 354 m away open for comments until 19 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 168 m away can be appealed until 24 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Mapped at 70–74 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Glendine
    Electoral division
    Kilkenny No. 2 Urban
    Electoral area
    Kilkenny
    Council
    Kilkenny County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; on the vacant land tax map.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 19 Nov 2026.
    • Glendine (bus 897, KK1) 337 m away: 2 an hour at morning peak; 7 from all stops within 500 m.
    • Noise from road traffic mapped at 70–74 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 63% owner-occupied (council 72%); 7% of homes empty (council 9%); most built 1971–1980; 56% drive to work (council 65%); population up 1% since 2016.
    • Around here the council decides in a median 63 days (about 9 weeks); 47% are asked for more information.
    • Homes started within 1 km: 8 in the last year, 13 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 07:12 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.