Glendine Road

52.66935, -7.25128

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2023. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

Not held yet for Kilkenny County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of GlendineBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2023: 23191 · porch, approved2023: 23180 · porch, withdrawn or invalid2021: 2 files on Glendine2022: 1 file on Glendine2023: 3 files on Glendine2024: 3 files on Glendine2025: 4 files on Glendine2026: 1 file on Glendine14 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    23191 · porch · approved 2023 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2023
    23180 · porch · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kilkenny city and county development plan 2021 2027 · 15 Oct 2021 – 14 Oct 2027

ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kilkenny city and county development plan 2021 variation 8b · 15 Oct 2021 – 15 Oct 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings8Fairview; Richview House
Monuments3Burial; R139402
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 18 on the draft 2027 map; 18 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

Single-storey rear27 decided · more info asked 30%
96% · council 95%
Two-storey rear11 decided · more info asked 36%
100% · council 99%
New house in a garden or site30 decided · more info asked 60%
100% · council 85%
Approved nearbyKilkenny overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 68 nearby, 1,236 council-wide

Figure 3

Glendine, file by file since 2021

6 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

14 planning files on Glendine since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 21952No. 5 · 2023 · other extension · approved · 23127No. 41 · 2023 · single-storey rear · approved · 2360293No number · 2024 · attic conversion / dormer · approved · 2460094No number · 2024 · attic conversion / dormer · approved · 2460389No number · 2025 · rear · approved · 2560607Porches, roofs, otherNo number · 2021 · other work · approved · 21849No number · 2023 · other work · approved · 2362No. 4 · 2024 · other work · approved · 2460461No number · 2025 · other work · refused · 2560065No number · 2025 · other work · approved · 2560271No number · 2025 · other work · approved · 2560629No number · 2026 · other work · approved · 2660090New house in a side gardenNo number · 2022 · new house · approved · 22772
ApprovedRefusedWithdrawn or invalid

14 files with "Glendine" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 60 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 116 days; Appeal window: 4 weeks; Building starts: 194 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=67)53 daysIf more info asked (1 in 3)With further information: median 116 days (n=34)116 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 194 days after permission (n=39)194 days after permissionSigned off72% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated101 decided home extensions, 39 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 7 appealed refusals became permissions. 2 of 7 appealed approvals were reversed.

    Refusals appealed7 decided
    2 became permissions
    Approvals appealed7 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500630 Refused · Glendine Road , Glendine , Kilkenny. · 84 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Glendine Road with 13 numbered planning items
    ⌖ the houseAppealEmpty land zoned for homesApprovedNo decision yet
    1. 1Glendine Road, Glendine 500630Appeal: refused · 84 m
    2. 24.3 ha zoned for homesEmpty land zoned for homes · 34 m
    3. 30.8 ha zoned for homesEmpty land zoned for homes · 102 m
    4. 48.8 ha zoned for homesEmpty land zoned for homes · 104 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 209 m
    6. 60.7 ha zoned for homesEmpty land zoned for homes · 218 m
    7. 75.3 ha zoned for homesEmpty land zoned for homes · 236 m
    8. 8Rossmore, Castlecomer Road 2660079Approved with conditions · 108 m
    9. 9KILKENNY GOLF CLUB, GLENDINE 2660090Approved with conditions · 155 m
    10. 10Bleach Road, Dunmore 2560763No decision yet · 286 m
    11. 11Kilkenny College, Glendine Road 2660141Approved with conditions · 416 m
    12. 12NEWPARK LOWER, CASTLECOMER ROAD 2660615No decision yet · 459 m
    13. 13NEWPARK LOWER, CASTLECOMER ROAD 2660306No decision yet · 464 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 36 permissions since 2016, 14 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    39 applications lodged within 500 m. Council: 37 approved, 2 refused. After appeals: 36 approved. Of those: 2 signed off, 9 built with the owner's opt-out, 3 started, 19 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT37: lodged → approved2: lodged → refused36: approved → approved2: refused → refused1 approved by the council, refused after an appeal19: approved → no start notice found9: approved → built, owner opted out3: approved → started, not signed off2: approved → signed off3: approved → ran out39 lodged39 lodged37 approved37 approved2 refused2 refused36 approved36 approved3 refused3 refused19 no start notice found19 no start notice found9 built, owner opted out9 built, owner opted out3 started, not signed off3 started, not signed off2 signed off2 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured39 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 24.3 ha zoned for homes · no homes built on it yet · 34 m
      • 30.8 ha zoned for homes · no homes built on it yet · 102 m
      • 48.8 ha zoned for homes · no homes built on it yet · 104 m
      • 50.3 ha zoned for homes · no homes built on it yet · 209 m
      • 60.7 ha zoned for homes · no homes built on it yet · 218 m
      • 75.3 ha zoned for homes · no homes built on it yet · 236 m
      • 0.3 ha zoned for homes · no homes built on it yet · 239 m
      • 1.5 ha zoned for homes · no homes built on it yet · 246 m
      • 1.7 ha zoned for homes · no homes built on it yet · 252 m
      • 4.6 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 6 and 10 a year; busiest 2025. 95% of decisions were approvals.

      2021: 7, 2022: 6, 2023: 6, 2024: 7, 2025: 10, 2026: 305102021: 7 approved7’21*2022: 6 approved6’222023: 6 approved6’232024: 7 approved7’242025: 8 approved2025: 2 refused10’252026: 3 approved3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 7 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 1 in the last 12 months
      1 not signed off
      • Beechwood, Richview, Castlecomer Road., Kilkenny · 5 Dec 2025 · 2 homes · start notice not signed off · 2560056 · 284 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Fairy Folk · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorate336 m
      Early Days Montessori · Crèche24 Jul 2025 · report · Tusla Early Years Inspectorate347 m
      The Growing Patch Childcare Centre · Crèche20 Mar 2026 · report · Tusla Early Years Inspectorate846 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Kilkenny County Council.
      Homes approved
      Here50
      Council middle0
      Homes started
      Here45
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      77% owner-occupied (council 72%).

      Homes built before 1971
      26% · council 29%
      Homes built since 2001
      35% · council 34%
      Owner-occupied
      77% · council 72%
      Rented
      20% · council 23%
      Children under 15
      27% · council 20%
      Aged 65 and over
      15% · council 16%
      Households with 2+ cars
      46% · council 50%
      Work mainly from home
      9% · council 11%
      This small area (569 people)Kilkenny

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 097063044

      Road noise
      55–59 dB
      day–night average (EPA 2022)
      Bus
      88 m
      Glendine · 897, KK1 · busiest stop within 500 m: 2 an hour at peak
      Nearest school
      188 m
      Kilkenny Mixed NS, 198 pupils
      Schools, stops and the council

      Schools

      • Kilkenny Mixed NS · primary · 198 pupils · 188 m
      • Kilkenny College · postprimary · 928 pupils · 298 m

      Stops 11

      • Glendine · 897, KK1 · 2/hour at peak · 88 m
      • Kilkenny Coll · 897 · 0/hour at peak · 297 m
      • Glendine · KK1 · 2/hour at peak · 302 m
      • Glendine · 897 · 0/hour at peak · 403 m
      • Kilkenny Coll · KK1 · 2/hour at peak · 554 m
      • Kilkenny Coll · KK1 · 2/hour at peak · 558 m
      • Glenbawn · KK1 · 2/hour at peak · 653 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Kilkenny Mixed NS · 188 m-4.8% pupils (198)
      • Kilkenny College · 298 m+1% pupils (928) · a pitch or play area 2026, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Porch (23191) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      2. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Glendine
      Electoral division
      Kilkenny Rural
      Electoral area
      Kilkenny
      Council
      Kilkenny County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 23191, approved 2023, started, no sign-off needed.
      • Zoned R2 (existing residential); not protected; on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Glendine (bus 897, KK1) 88 m away: 2 an hour at morning peak; 5 from all stops within 500 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 77% owner-occupied (council 72%); 8% of homes empty (council 9%); most built 2001–2010; 68% drive to work (council 65%); population up 4% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 37% are asked for more information.
      • Homes started within 1 km: 8 in the last year, 13 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 00:25 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.