PlanningRegister.ie
Planning report · Tipperary County Council · 2000 m around the house · the last 12 months · 29 Oct 2026, 20:42

Barry's Bridge, Thurles

52.67975, -7.81007

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (98%). 52 homes approved 967 m away haven't started.

See on the mapWatch this area

Not held yet for Tipperary County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G5
Zoning · Open space and amenity
Yes
Protected or listed · inside the zone around a recorded monument (TN041-042006-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningG5 · Open space and amenity
What it says

Amenity: To provide, preserve and enhance open space, biodiversity and amenity uses

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

thurles and environs local area plan 2024 2030 · 25 Mar 2024 – 12 Feb 2030

Protected building11 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory10 within 100 m Ursuline Convent; Barry's Bridge
Monument zoneOn this site Bridge, Thurles Townparks; Gateway, Thurles Townparks

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings104Ardfort House; Saint Mary's Health Centre
Monuments51R136626; R136630
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 187 on the draft 2027 map; 187 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 91% approved, and 1 in 3 is asked for more information.

New house in a garden or site11 decided · more info asked 36%
91% · council 97%
Approved nearbyTipperary overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 11 nearby, 1,032 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 4 is asked for more information, which adds about 64 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 4): 114 days; Appeal window: 4 weeks; Building starts: 109 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 48–55 (n=46)51 daysIf more info asked (1 in 4)With further information: median 114 days (n=14)114 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 109 days after permission (n=20)109 days after permissionSigned off65% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated60 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 2 appealed refusals became permissions. 0 of 3 appealed approvals were reversed.

    Refusals appealed2 decided
    0 became permissions
    Approvals appealed3 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Barry's Bridge, Thurles with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedLarge schemeBuilding startedEmpty land zoned for homes
    1. 15 Friar Street, Thurles 2661017No decision yet · 455 m
    2. 2Community Hospital of the Assumption, Castlemeadows Thurles 2660979No decision yet · 1.0 km
    3. 317 Hazelwood, Dublin Road 2661037No decision yet · 1.2 km
    4. 4Dublin Road, Thurles 2660622Approved with conditions · 933 m
    5. 5Brittas Road 2460922Approved, no sign building has started · 924 m
    6. 6Brittas Road 2560674Approved, no sign building has started · 967 m
    7. 7Lands to Rear of Rosendale and 4 Friar Street & to North-West of Croke Gardens, Garryvicleheen 2660255No decision yet · 488 m
    8. 8Innisfail, Kickham Street 2660760No decision yet · 663 m
    9. 9Suirside Place, Thurles CN0141829TTBuilding started · 54 m
    10. 100.4 ha zoned for homesEmpty land zoned for homes · 138 m
    11. 110.1 ha zoned for homesEmpty land zoned for homes · 182 m
    12. 120.2 ha zoned for homesEmpty land zoned for homes · 342 m
    13. 135.1 ha zoned for homesEmpty land zoned for homes · 346 m
    14. 140.7 ha zoned for homesEmpty land zoned for homes · 371 m
    15. 150.2 ha zoned for homesEmpty land zoned for homes · 374 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 41 permissions since 2016, 8 show a start notice and 2 have a completion certificate.

    47 applications lodged within 500 m. Council: 41 approved, 6 refused. After appeals: 41 approved. Of those: 2 signed off, 2 built with the owner's opt-out, 4 started, 31 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT41: lodged → approved6: lodged → refused41: approved → approved6: refused → refused31: approved → no start notice found2: approved → built, owner opted out4: approved → started, not signed off2: approved → signed off2: approved → ran out47 lodged47 lodged41 approved41 approved6 refused6 refused41 approved41 approved6 refused6 refused31 no start notice found31 no start notice found2 built, owner opted out2 built, owner opted out4 started, not signed off4 started, not signed off2 signed off2 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured47 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 2.0 km; the first closes 9 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-09 2660979: application received — the development of lands involving the following works within the curtilage of a Protected Structure (RPS reference no. ; 2026-11-18 2660622: CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey and part single s; 2026-11-19 2661017: application received — the change of use of existing hair/beauty salon to residential accommodation and all associated site works; 2026-11-26 2661037: application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together with all associated workstoday3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov2660979: application received — the development of lands involving the following works within the curtilage of a Protected Structure (RPS reference no. · 1 km away · 2026-11-092660622: CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey and part single s · 933 m away · 2026-11-182661017: application received — the change of use of existing hair/beauty salon to residential accommodation and all associated site works · 455 m away · 2026-11-192661037: application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together with all associated works · 1.2 km away · 2026-11-26
    Comments closeTime to appeal ends
    • Comments close 9 Nov 202611 days left
      22660979 · application received — the development of lands involving the following works within the curtilage of a Protected…
      €20 to the council · 1.0 km away
    • Time to appeal ends 18 Nov 202620 days left
      42660622 · CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey…
      €220 to An Coimisiún Pleanála (€110 observer) · 933 m away
    • Comments close 19 Nov 202621 days left
      12661017 · application received — the change of use of existing hair/beauty salon to residential accommodation and all associated…
      €20 to the council · 455 m away
    • Comments close 26 Nov 202628 days left
      32661037 · application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together…
      €20 to the council · 1.2 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    52 homes 967 m away were approved Oct 2025 with no start notice yet; the permission runs to Oct 2030.

    Brittas Road · 52 homes: 52 homes approved Oct 2025, not started; Brittas Road · 44 homes: 44 homes approved Aug 2025, not started202420252026202720282029203020312032Brittas Road · 52 homes967 m · 256067452 homes approved Oct 2025, not started52 homes approved Oct 2025, not startedBrittas Road · 44 homes924 m · 246092244 homes approved Aug 2025, not started44 homes approved Aug 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 12 within 2.0 km

    Approved, not started 2

    • Brittas Road · 44 homes approved Aug 2025, not started · 924 m
    • Brittas Road · 52 homes approved Oct 2025, not started · 967 m

    Empty land zoned for homes 10

    • 100.4 ha zoned for homes · no homes built on it yet · 138 m
    • 110.1 ha zoned for homes · no homes built on it yet · 182 m
    • 120.2 ha zoned for homes · no homes built on it yet · 342 m
    • 135.1 ha zoned for homes · no homes built on it yet · 346 m
    • 140.7 ha zoned for homes · no homes built on it yet · 371 m
    • 150.2 ha zoned for homes · no homes built on it yet · 374 m
    • 0.5 ha zoned for homes · no homes built on it yet · 382 m
    • 0.1 ha zoned for homes · no homes built on it yet · 386 m
    • 0.3 ha zoned for homes · no homes built on it yet · 389 m
    • 0.7 ha zoned for homes · no homes built on it yet · 393 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 8 and 12 a year; busiest 2025. 87% of decisions were approvals.

    2021: 7, 2022: 8, 2023: 9, 2024: 9, 2025: 12, 2026: 2051015202021: 7 approved7’21*2022: 8 approved8’222023: 8 approved2023: 1 refused9’232024: 7 approved2024: 2 refused9’242025: 10 approved2025: 2 refused12’252026: 1 approved2026: 1 refused2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 51 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 15 in the last 12 months
    2 signed off as finished6 not signed off7 no sign-off needed
    • RAILWAY ROAD, Thurles, Tipperary, E41XF34 · 31 Oct 2026 · start notice not signed off · 2660391 · 788 m
    • Wrensborough, Drish,Dublin Road, Thurles, Tipperary · 29 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2561285 · 1.9 km
    • 3 Mill Road, Thurles, Tipperary, E41 Y078 · 22 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2660179 · 775 m
    • Nenagh road, Thurles, Tipperary · 11 Aug 2026 · start notice not signed off · 2461043 · 2.0 km
    • Abbey Road, Thurles, Tipperary, E41 YY44 · 1 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660172 · 1.1 km
    • Railway station, Thurles, Thurles, Tipperary, E41 HF20 · 30 Jun 2026 · 7-day notice not signed off · 876 m
    • Abbey Road, Thurles, Tipperary · 24 Jun 2026 · short notice no sign-off needed · 2660172 · 1.1 km
    • 11 Riverwood, Durlas, Tipperary · 15 Jun 2026 · 1 homes · 7-day notice not signed off · 2560125 · 637 m
    • 9Suirside Place, Thurles, Tipperary, E41 PE82 · 11 May 2026 · start notice signed off · 54 m
    • Windsor Grove, Mill Road, Thurles, Tipperary · 17 Mar 2026 · 2 homes · start notice not signed off · 2560982 · 885 m
    • Slievenamon Road, Thurles, Tipperary · 2 Feb 2026 · start notice signed off · 2460829 · 791 m
    • 18 Willowmere Drive, Thurles, Tipperary · 27 Dec 2025 · short notice no sign-off needed · 201229 · 1.1 km
    • 10 Windsor Grove, Thurles, Tipperary, E41 A8X7 · 24 Nov 2025 · 1 homes · short notice no sign-off needed · 25147 · 943 m
    • 18 Sarsfield Street, Thurles, Tipperary, E41 AW68 · 17 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2560079 · 645 m
    • Sarsfield Street, Thurles, Tipperary, E41 N244 · 3 Nov 2025 · 1 homes · start notice not signed off · 2360881 · 719 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Homes coming 96 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Angel's Pre- School · Crèche13 Feb 2024 · report · Tusla Early Years Inspectorate41 m
    Busy Bees Pre- School · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate116 m
    Little Explorers Playschool · Crèche12 Jan 2023 · report · Tusla Early Years Inspectorate391 m
    Naíonra Dhurlas Eile Teoranta · Crèche7 Feb 2024 · report · Tusla Early Years Inspectorate398 m
    Thurles Targeted Early Intervention Service · Crèche2 Dec 2025 · report · Tusla Early Years Inspectorate506 m
    ABC Pre-School · Crèche9 Mar 2026 · report · Tusla Early Years Inspectorate520 m
    Abc Preschool Scoil Ailbhe · Crèche26 Aug 2025 · report · Tusla Early Years Inspectorate580 m
    Rahealty N.S. Pre- School · Crèche11 Sept 2024 · report · Tusla Early Years Inspectorate800 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Tipperary County Council.
    Homes approved
    Here96
    Council middle0
    Homes started
    Here193
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    12% of homes built before 1971 (council 33%). 55% owner-occupied (council 69%).

    Homes built before 1971
    12% · council 33%
    Homes built since 2001
    38% · council 29%
    Owner-occupied
    55% · council 69%
    Rented
    41% · council 24%
    Children under 15
    29% · council 20%
    Aged 65 and over
    17% · council 18%
    Households with 2+ cars
    50% · council 46%
    Work mainly from home
    5% · council 10%
    This small area (459 people)Tipperary

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 217162028

    Bus
    183 m
    Mary Immaculate College Thurles · OY2 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    41 m
    Ursuline Secondary School, 895 pupils
    Schools, stops and the council

    Schools

    • Ursuline Secondary School · postprimary · 895 pupils · 41 m
    • Scoil Angela · primary · 219 pupils · 201 m
    • Presentation Primary School · primary · 247 pupils · 265 m
    • Presentation Secondary School · postprimary · 559 pupils · 267 m
    • C.B.S. Thurles · postprimary · 571 pupils · 332 m
    • Scoil Ailbhe · primary · 189 pupils · 580 m
    • Gaelscoil Durlas Eile · primary · 194 pupils · 938 m
    • Coláiste Mhuire Co-Ed · postprimary · 601 pupils · 1.2 km

    Stops 11

    • Mary Immaculate College Thurles · OY2 · 183 m
    • Thurles · 391, 393, 394, 395, 396, 397 · 2/hour at peak · 290 m
    • Thurles SC · 896 · 0/hour at peak · 476 m
    • Thurles SC · 896 · 0/hour at peak · 490 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Ursuline Secondary School · 41 m+2.9% pupils (895)
    • Scoil Angela · 201 m-3.1% pupils (219)
    • Presentation Primary School · 265 m+2.5% pupils (247)
    • Presentation Secondary School · 267 m+1.6% pupils (559) · an extension 2024, approved with conditions
    • C.B.S. Thurles · 332 m+2.7% pupils (571)
    • Scoil Ailbhe · 580 m-1.6% pupils (189)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Council consultation portalsPublic29 Oct 2026, 01:01open
    Council meetings (ModernGov)Public29 Oct 2026, 02:14open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Zoned G5 (open space and amenity), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. Application 455 m away open for comments until 19 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Building work started 54 m away: for how long?
      Ask for: The agent's answer.
      Agent · council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Monacocka
    Electoral division
    Thurles Urban
    Electoral area
    Thurles
    Council
    Tipperary County Council
    Everything we found, as a list 8 lines
    • Zoned G5 (open space and amenity); monument zone; no vacant land tax.
    • 12 sites nearby could change: 2 approved schemes, 10 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 19 Nov 2026.
    • 96 homes approved nearby, not started; largest 52 at Brittas Road.
    • Thurles (bus 391, 393) 290 m away: 2 an hour at morning peak.
    • Here (2022 census): 55% owner-occupied (council 69%); 4% of homes empty (council 10%); most built 1991–2000; 71% drive to work (council 66%); population up 4% since 2016.
    • Around here the council decides in a median 63 days (about 9 weeks); 47% are asked for more information.
    • 51 applications nearby in the last 12 months; 92% approved (council 96%); 31% for work already built (council 30%).
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
    www2.courts.ie—© the publisher28 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 29 Oct 2026, 20:42 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.