PlanningRegister.ie
Planning report · Tipperary County Council · 500 m around the house · the last 12 months · 30 Oct 2026, 09:45

17 Willowmere Drive, Thurles

52.67994, -7.79393

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (100%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Tipperary County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LognafullaBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 2 files on Lognafulla2023: 1 file on Lognafulla2026: 1 file on Lognafulla4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

thurles and environs local area plan 2024 2030 · 25 Mar 2024 – 12 Feb 2030

Protected building1 within 100 m on the council's record (not republished)
Heritage inventory1 within 100 m Mount Saint Benedict

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings3Innisfail; Mount Saint Benedict
Monuments3R136676; R136713
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 35 on the draft 2027 map; 35 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 67% are asked for more information.

New house in a garden or site6 decided · more info asked 67%
100% · council 97%
Approved nearbyTipperary overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 1,032 council-wide

Figure 3

Lognafulla, file by file since 2021

New houses in side gardens or on sites: 1 of 1.

4 planning files on Lognafulla since 2021, by kind and decision.202120222023202420252026Extensions, atticsPorches, roofs, otherNo. 42 · 2021 · other work · approved · 211422No number · 2021 · other work · approved · 211470No number · 2026 · other work · approved · 2660094New house in a side gardenNo number · 2023 · new house · approved · 2360538
ApprovedRefusedWithdrawn or invalid

4 files with "Lognafulla" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks; Building starts: 119 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–56 (n=25)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 119 days after permission (n=10)119 days after permissionSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated32 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed refusals became permissions. 0 of 2 appealed approvals were reversed.

    Refusals appealed2 decided
    0 became permissions
    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around 17 Willowmere Drive, Thurles with 11 numbered planning items
    ⌖ the houseOpen for commentsWindow closingLarge schemeEmpty land zoned for homesApproved
    1. 117 Hazelwood, Dublin Road 2661037No decision yet · 221 m
    2. 2Dublin Road, Thurles 2660622Approved with conditions · 131 m
    3. 3Innisfail, Kickham Street 2660760No decision yet · 307 m
    4. 45.6 ha zoned for homesEmpty land zoned for homes · 28 m
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 45 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 86 m
    7. 70.8 ha zoned for homesEmpty land zoned for homes · 116 m
    8. 81.3 ha zoned for homesEmpty land zoned for homes · 121 m
    9. 92.1 ha zoned for homesEmpty land zoned for homes · 132 m
    10. 1016 Hazelwood Grove, Thurles 26104Approved with conditions · 111 m
    11. 11Lognafulla Glebe, Dublin Road 2660094Approved with conditions · 233 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 21 permissions since 2016, 5 show a start notice and 1 has a completion certificate.

    21 applications lodged within 500 m. Council: 21 approved, 0 refused. After appeals: 21 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 3 started, 14 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT21: lodged → approved21: approved → approved14: approved → no start notice found1: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off2: approved → ran out21 lodged21 lodged21 approved21 approved21 approved21 approved14 no start notice found14 no start notice found1 built, owner opted out1 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured21 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 18 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-18 2660622: CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey and part single s; 2026-11-26 2661037: application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together with all associated workstoday4 Nov9 Nov14 Nov19 Nov24 Nov29 Nov2660622: CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey and part single s · 131 m away · 2026-11-182661037: application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together with all associated works · 221 m away · 2026-11-26
    Comments closeTime to appeal ends
    • Time to appeal ends 18 Nov 202619 days left
      22660622 · CONDITIONAL — demolition of 8sqm utility room to rear of existing dwelling and construction of a new part two storey…
      €220 to An Coimisiún Pleanála (€110 observer) · 131 m away
    • Comments close 26 Nov 202627 days left
      12661037 · application received — an unauthorised development consisting of a rear flat roof canopy, domestic garage, together…
      €20 to the council · 221 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 45.6 ha zoned for homes · no homes built on it yet · 28 m
    • 50.4 ha zoned for homes · no homes built on it yet · 45 m
    • 60.3 ha zoned for homes · no homes built on it yet · 86 m
    • 70.8 ha zoned for homes · no homes built on it yet · 116 m
    • 81.3 ha zoned for homes · no homes built on it yet · 121 m
    • 92.1 ha zoned for homes · no homes built on it yet · 132 m
    • 0.1 ha zoned for homes · no homes built on it yet · 183 m
    • 2.0 ha zoned for homes · no homes built on it yet · 196 m
    • 1.4 ha zoned for homes · no homes built on it yet · 221 m
    • 1.5 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 6 a year; busiest 2023. 100% of decisions were approvals.

    2021: 4, 2022: 2, 2023: 6, 2024: 3, 2025: 3, 2026: 305102021: 4 approved4’21*2022: 2 approved2’222023: 6 approved6’232024: 3 approved3’242025: 3 approved3’252026: 3 approved3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 117 Hazelwood , Dublin Road , Thurles comments close 26 Nov 2026
      an unauthorised development consisting of a rear flat roof canopy, domestic garage, together with all…
      266103722 Oct 2026221 m
    Every application within 500 m 8 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • Windsor Grove, Mill Road, Thurles, Tipperary · 17 Mar 2026 · 2 homes · start notice not signed off · 2560982 · 312 m
    • 18 Willowmere Drive, Thurles, Tipperary · 27 Dec 2025 · short notice no sign-off needed · 201229 · 21 m
    • 10 Windsor Grove, Thurles, Tipperary, E41 A8X7 · 24 Nov 2025 · 1 homes · short notice no sign-off needed · 25147 · 290 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Rahealty N.S. Pre- School · Crèche11 Sept 2024 · report · Tusla Early Years Inspectorate557 m
    Busy Bees Pre- School · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate976 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Tipperary County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here227
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    7% of homes built before 1971 (council 33%). 63% owner-occupied (council 69%).

    Homes built before 1971
    7% · council 33%
    Homes built since 2001
    37% · council 29%
    Owner-occupied
    63% · council 69%
    Rented
    33% · council 24%
    Children under 15
    20% · council 20%
    Aged 65 and over
    17% · council 18%
    Households with 2+ cars
    36% · council 46%
    Work mainly from home
    8% · council 10%
    This small area (412 people)Tipperary

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 217162006

    Bus
    112 m
    Willowmere Drive · 858a · busiest stop within 500 m: 0 an hour at peak
    Nearest school
    908 m
    Presentation Secondary School, 559 pupils
    Schools, stops and the council

    Schools

    • Presentation Secondary School · postprimary · 559 pupils · 908 m
    • Presentation Primary School · primary · 247 pupils · 964 m

    Stops 3

    • Willowmere Drive · 858a · 0/hour at peak · 112 m
    • Willowmere Drive · 858a · 0/hour at peak · 116 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Presentation Secondary School · 908 m+1.6% pupils (559) · an extension 2024, approved with conditions
    • Presentation Primary School · 964 m+2.5% pupils (247)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Council consultation portalsPublic30 Oct 2026, 01:04open
    Council meetings (ModernGov)Public30 Oct 2026, 02:17open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Application 220 m away open for comments until 26 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 131 m away can be appealed until 18 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Lognafulla
    Electoral division
    Thurles Urban
    Electoral area
    Thurles
    Council
    Tipperary County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; on the vacant land tax map.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 26 Nov 2026.
    • Willowmere Drive (bus 858a) 112 m away: 3 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 63% owner-occupied (council 69%); 6% of homes empty (council 10%); most built 2001–2010; 66% drive to work (council 66%); population up 4% since 2016.
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 63 days (about 9 weeks); 47% are asked for more information.
    • 8 applications nearby in the last 12 months.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
    www2.courts.ie—© the publisher29 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 30 Oct 2026, 09:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.