PlanningRegister.ie
Planning report · Clare County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 20:33

Fairyfield

52.69205, -8.62013

Homes here mostly date from the 1970s. 2 planning files on this house, the latest from 2025.

See on the mapWatch this area

Not held yet for Clare County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 2 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2026: 2560657 · new house, approved2025: 24204 · new house, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2560657 · new house · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  2. 2025
    24204 · new house · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  • 22 Jun 2026 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
On this site
R2
Zoning · Existing residential
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

parteen settlement plan · 20 Apr 2023 – 19 Apr 2029

ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

parteen settlement plan variation no 1 · 20 Apr 2023 – 19 Apr 2029

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2Parteen-a-Lax; Saint Patrick's Church (Saint Patricks)
Monuments9Castle - unclassified; Weir - fish
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 17 on the draft 2027 map; 17 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 60% approved, and 1 in 2 are asked for more information.

New house in a garden or site5 decided · more info asked 60%
60% · council 90%
Approved nearbyClare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 5 nearby, 1,607 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=16)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated21 decided home extensions, 6 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Fairyfield with 7 numbered planning items
    ⌖ the houseBuilding startedEmpty land zoned for homes
    1. 180 Fairyfield, Parteen P2560657Building started · 6 m
    2. 22.9 ha zoned for homesEmpty land zoned for homes · 14 m
    3. 32.4 ha zoned for homesEmpty land zoned for homes · 27 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 186 m
    5. 51.2 ha zoned for homesEmpty land zoned for homes · 200 m
    6. 60.5 ha zoned for homesEmpty land zoned for homes · 249 m
    7. 71.7 ha zoned for homesEmpty land zoned for homes · 300 m
    Figure 4

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 22.9 ha zoned for homes · no homes built on it yet · 14 m
      • 32.4 ha zoned for homes · no homes built on it yet · 27 m
      • 40.3 ha zoned for homes · no homes built on it yet · 186 m
      • 51.2 ha zoned for homes · no homes built on it yet · 200 m
      • 60.5 ha zoned for homes · no homes built on it yet · 249 m
      • 71.7 ha zoned for homes · no homes built on it yet · 300 m
      • 0.4 ha zoned for homes · no homes built on it yet · 311 m
      • 0.9 ha zoned for homes · no homes built on it yet · 353 m
      • 0.5 ha zoned for homes · no homes built on it yet · 353 m
      • 0.8 ha zoned for homes · no homes built on it yet · 394 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 5

      Applications within 500 m, by year

      Between 2 and 3 a year; busiest 2024. 100% of decisions were approvals.

      2021: 1, 2022: 2, 2024: 3, 2025: 105102021: 1 approved1’21*2022: 2 approved2’222024: 3 approved3’242025: 1 approved1’25
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 0 in the last 12 months

      See every application on the map

        How we work this out
        Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
        Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
        SourceLicenceFetchedLink
        National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
        An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
        Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
        Building work nearby 1 in the last 12 months
        1 no sign-off needed
        • 180 Fairyfield, Parteen, Clare · 22 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · P2560657 · 6 m
        How we work this out
        Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
        Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
        SourceLicenceFetchedLink
        Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
        0
        Named places nearby: estate, schemes, crèches, schools

        Named places estate, developments, inspections

        Crèches and schools inspected

        NameLatest inspectionDistance
        Tiggers Nest · Crèche10 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 538 m
        Caterpillar Kids Pre- School and Afterschool Service · Crèche30 Jul 2024 · report · Tusla Early Years Inspectorate764 m
        How we work this out
        Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
        Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
        SourceLicenceFetchedLink
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        Tusla early years registerPublic register28 Oct 2026, 23:19open
        How busy is this area About as busy as most of Clare County Council.
        Homes approved
        Here0
        Council middle0
        Homes started
        Here3
        Council middle2
        How we work this out
        Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
        Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
        SourceLicenceFetchedLink
        An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
        Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
        National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
        Question 5

        What's the area like?

        Figure 6

        This street block against the council

        91% owner-occupied (council 72%).

        Homes built before 1971
        21% · council 26%
        Homes built since 2001
        4% · council 32%
        Owner-occupied
        91% · council 72%
        Rented
        7% · council 21%
        Children under 15
        15% · council 20%
        Aged 65 and over
        26% · council 17%
        Households with 2+ cars
        58% · council 47%
        Work mainly from home
        15% · council 11%
        This small area (387 people)Clare

        MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 037009005

        Bus
        312 m
        Parteen · 313
        Nearest school
        490 m
        Sn An Phairtin Mixed, 317 pupils
        Schools, stops and the council

        Schools

        • Sn An Phairtin Mixed · primary · 317 pupils · 490 m

        Stops 3

        • Parteen · 313 · 312 m
        • Ballykeelaun · 313 · 1/hour at peak · 691 m
        • Ballykeelaun · 313 · 1/hour at peak · 698 m

        Schools growing or shrinking planning in 3 years · pupils last year

        • Sn An Phairtin Mixed · 490 m+4.6% pupils (317)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
        Council consultation portalsPublic31 Oct 2026, 01:06open
        Council meetings (ModernGov)Public31 Oct 2026, 02:21open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. New house (2560657) approved 2026, not started: still planned?
          Ask for: The grant, and whether it stays with the house.
          Seller · solicitor
        2. New house (24204) approved 2025, not started: still planned?
          Ask for: The grant, and whether it stays with the house.
          Seller · solicitor
        3. On the vacant land tax map: is the 3% tax being paid?
          Ask for: Your solicitor's check of liability or exemption.
          Solicitor
        4. Building work started 6 m away: for how long?
          Ask for: The planning conditions for P2560657.
          Agent · council
        5. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Garraun
        Electoral division
        Ballyglass
        Electoral area
        Shannon
        Council
        Clare County Council
        Everything we found, as a list 8 lines
        • 2 applications on this site; latest 2560657, approved 2026, not started, runs out 2031.
        • Zoned R2 (existing residential); on the vacant land tax map.
        • 10 sites nearby could change: 10 empty zoned plots.
        • No morning-peak service within 500 m; nearest is Ballykeelaun, 691 m away (5 a day).
        • Here (2022 census): 91% owner-occupied (council 72%); 4% of homes empty (council 17%); most built 1971–1980; 70% drive to work (council 66%).
        • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
        • 1 building job started within 250 m in the last six months.
        • 3 homes started within 1 km in 3 years (council middle 2).
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 26
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
        www2.courts.ie—© the publisher30 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 31 Oct 2026, 20:33 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.