Planning report · Clare County Council · 2000 m around the house · the last 12 months · 26 Oct 2026, 17:29

Ardnacrusha, Ballyglass ED, Shannon Municipal District, County Clare, Munster, Éire / Ireland

52.70356, -8.60897

Homes here mostly date from the 1950s. 21 homes approved 503 m away haven't started.

See on the mapWatch this area

Not held yet for Clare County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings5Ardnacrusha Power Station; Saint Patrick's Catholic Church
Monuments32Castle - tower house; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 54 on the draft 2027 map; 54 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.

New house in a garden or site7 decided · more info asked 29%
100% · council 90%
Approved nearbyClare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 7 nearby, 1,600 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 50 days.

    Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 50–53 (n=10)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated14 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 502017 Pending · Derryfadda, Clonlara, Co. Clare. · 1.9 km
    • 324491 Pending · at Ballyglass, Blackwater, Castlebank, Lakyle, Mountcatherine,… · 512 m
    • 323980 Pending · in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and… · 1.2 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Ardnacrusha, Ballyglass ED, Shannon Municipal District, County Clare, Munster, Éire / Ireland with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1No. 2 Highgrove, Blackwater 2660559Approved with conditions · 1.5 km
    2. 2Firhill Gortatogher 2560702Approved, no sign building has started · 503 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 366 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 397 m
    5. 50.8 ha zoned for homesEmpty land zoned for homes · 426 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 451 m
    7. 70.4 ha zoned for homesEmpty land zoned for homes · 511 m
    8. 81.0 ha zoned for homesEmpty land zoned for homes · 518 m
    9. 98 Firhill, Parteen 2660323Approved with conditions · 416 m
    10. 10Doncla House, Lackyle 26213Approved with conditions · 698 m
    11. 11Rosmadda West, Blackwater 2641Approved with conditions · 759 m
    12. 12Castlebank, Ardnacrusha 2697Approved with conditions · 767 m
    13. 13Ardeevin ESB Houses, Castlebank 2560660Approved with conditions · 920 m
    14. 14Blackwater Demesne, Blackwater 2660117No decision yet · 1.2 km
    15. 15Shannakyle, Parteen 2560698Approved with conditions · 1.4 km
    Figure 5

    The next 30 days

    1 deadline within 2.0 km; the first closes 16 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-16 2660559: CONDITIONAL — of a side extension to the existing house and a detached shed to the rear of the property along with associated site wortoday31 Oct5 Nov10 Nov15 Nov20 Nov25 Nov2660559: CONDITIONAL — of a side extension to the existing house and a detached shed to the rear of the property along with associated site wor · 1.5 km away · 2026-11-16
    Time to appeal ends
    • Time to appeal ends 16 Nov 202621 days left
      12660559 · CONDITIONAL — of a side extension to the existing house and a detached shed to the rear of the property along with…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.5 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    21 homes 503 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Firhill Gortatogher · 21 homes: 21 homes approved Oct 2026, not started202420252026202720282029203020312032Firhill Gortatogher · 21 homes503 m · 256070221 homes approved Oct 2026, not started21 homes approved Oct 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 1

    Empty land zoned for homes 10

    • 30.2 ha zoned for homes · no homes built on it yet · 366 m
    • 40.2 ha zoned for homes · no homes built on it yet · 397 m
    • 50.8 ha zoned for homes · no homes built on it yet · 426 m
    • 60.2 ha zoned for homes · no homes built on it yet · 451 m
    • 70.4 ha zoned for homes · no homes built on it yet · 511 m
    • 81.0 ha zoned for homes · no homes built on it yet · 518 m
    • 0.3 ha zoned for homes · no homes built on it yet · 607 m
    • 0.5 ha zoned for homes · no homes built on it yet · 623 m
    • 0.3 ha zoned for homes · no homes built on it yet · 654 m
    • 4.3 ha zoned for homes · no homes built on it yet · 654 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 1 a year; busiest 2024. 100% of decisions were approvals.

    2021: 2, 2024: 1, 2025: 1, 2026: 105102021: 2 approved2’21*2024: 1 approved1’242025: 1 approved1’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 2.0 km 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 8 in the last 12 months
    6 not signed off2 no sign-off needed
    • Shannakyle, Parteen, Clare · 30 Oct 2026 · 1 homes · start notice not signed off · P2560698 · 1.4 km
    • Carrig an tSlabhra, Athlunkard, Clare · 24 Jul 2026 · 101 homes · start notice not signed off · P25-60108 · 1.8 km
    • Carrig an tSlabhra, Athlunkard, Clare · 24 Jul 2026 · 101 homes · start notice not signed off · P25-60108 · 1.8 km
    • 80 Fairyfield, Parteen, Clare · 22 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · P2560657 · 1.5 km
    • 15-18 Carrig an tSlabhra, Athlunkard, Clare · 5 Jun 2026 · 101 homes · 7-day notice not signed off · P25-60108 · 1.8 km
    • 01-04 Carrig an tSlabhra, Athlunkard, Clare · 5 Jun 2026 · 101 homes · 7-day notice not signed off · P25-60108 · 1.8 km
    • No. 11-14, Carrig an tSlabhra,, Athlunkard, Clare · 5 Jun 2026 · 101 homes · 7-day notice not signed off · P25-60108 · 1.7 km
    • Esb Houses, Ardnacrusha, Clare, V94XE7C · 26 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25-60660 · 967 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 21 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Caterpillar Kids Pre- School and Afterschool Service · Crèche30 Jul 2024 · report · Tusla Early Years Inspectorate722 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area About as busy as most of Clare County Council.
    Homes approved
    Here21
    Council middle0
    Homes started
    Here4
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    44% of homes built before 1971 (council 26%). 78% owner-occupied (council 72%).

    Homes built before 1971
    44% · council 26%
    Homes built since 2001
    18% · council 32%
    Owner-occupied
    78% · council 72%
    Rented
    18% · council 21%
    Children under 15
    17% · council 20%
    Aged 65 and over
    23% · council 17%
    Households with 2+ cars
    52% · council 47%
    Work mainly from home
    15% · council 11%
    This small area (172 people)Clare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 037009009/01

    Bus
    537 m
    Lakyle Heights · 313, 318
    Nearest school
    1.0 km
    Sn An Phairtin Mixed, 317 pupils
    Schools, stops and the council

    Schools

    • Sn An Phairtin Mixed · primary · 317 pupils · 1.0 km

    Stops 18

    • Lakyle Heights · 313, 318 · 1/hour at peak · 537 m
    • Lakyle Heights · 313, 318 · 1/hour at peak · 546 m
    • Gortatogher · 313 · 1/hour at peak · 591 m
    • Gortatogher · 313 · 1/hour at peak · 601 m
    • Rosmadda West · 313 · 1/hour at peak · 652 m
    • Rosmadda West · 313 · 1/hour at peak · 673 m
    • Rosmadda West · 345 · 0/hour at peak · 687 m
    • Rosmadda West · 345 · 0/hour at peak · 703 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Council consultation portalsPublic26 Oct 2026, 00:55open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballykeelaun
    Electoral division
    Ballyglass
    Electoral area
    Shannon
    Council
    Clare County Council
    Everything we found, as a list 8 lines
    • No vacant land tax.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 21 homes approved nearby, not started; largest 21 at Firhill Gortatogher.
    • No morning-peak service within 500 m; nearest is Lakyle Heights, 537 m away (1 an hour).
    • Here (2022 census): 78% owner-occupied (council 72%); 11% of homes empty (council 17%); most built 1946–1960; 76% drive to work (council 66%).
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • 17 applications nearby in the last 12 months; 93% approved (council 94%).
    • 4 homes started within 1 km in 3 years (council middle 2).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
    www2.courts.ie—© the publisher25 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 26 Oct 2026, 17:29 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.