PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 07:57

Parkmore Road, Carnew

52.71470, -6.49393

Homes here mostly date from before 1919.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CarnewBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 5 files on Carnew2022: 1 file on Carnew2023: 5 files on Carnew2024: 2 files on Carnew2025: 5 files on Carnew2026: 2 files on Carnew20 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G4
Zoning · Open space
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningG4 · Open space
What it says

Active Open Space: To protect and enhance existing and provide for new active open space.

Open space and recreational amenity, to be preserved as such.

carnew town plan · 23 Oct 2022 – 23 Oct 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Irish Flexible Packaging Limited (364 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings8worker's house; Sycamore Lodge
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Carnew, file by file since 2021

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

20 planning files on Carnew since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 2 · 2021 · rear · approved · 21480No number · 2024 · other extension · approved · 24495No number · 2025 · side · approved · 25178No number · 2025 · first-floor · approved · 25239Porches, roofs, otherNo number · 2021 · other work · approved · 211126No number · 2021 · other work · refused · 211189No number · 2021 · other work · approved · 21151No number · 2021 · other work · approved · 21330No number · 2022 · other work · approved · 221404No number · 2023 · other work · refused · 23170No. 2 · 2023 · other work · approved · 23258No number · 2023 · other work · approved · 23391No number · 2023 · other work · approved · 23557No. 32B · 2023 · other work · approved · 2360160No number · 2024 · other work · approved · 2460789No number · 2025 · other work · approved · 2531No number · 2025 · other work · approved · 2559No number · 2026 · other work · approved · 2660292No number · 2026 · other work · approved · 2660634New house in a side gardenNo number · 2025 · new house · approved · 2560730
ApprovedRefusedWithdrawn or invalid

20 files with "Carnew" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    What appeals changed

    1 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Parkmore Road, Carnew with 3 numbered planning items
    ⌖ the houseEmpty land zoned for homesApproved
    1. 10.4 ha zoned for homesEmpty land zoned for homes · 274 m
    2. 2Aughrim Road, Carnew 2660634Approved with conditions · 0 m
    3. 3Aughrim Road, Carnew 2660292Approved with conditions · 0 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 12 permissions since 2016, 2 show a start notice and 0 have a completion certificate.

    12 applications lodged within 500 m. Council: 11 approved, 1 refused. After appeals: 12 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 1 started, 7 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT11: lodged → approved1: lodged → refused11: approved → approved1 refused by the council, approved after an appeal7: approved → no start notice found1: approved → built, owner opted out1: approved → started, not signed off3: approved → ran out12 lodged12 lodged11 approved11 approved1 refused1 refused12 approved12 approved7 no start notice found7 no start notice found1 built, owner opted out1 built, owner opted out1 started, not signed off1 started, not signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured12 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 10.4 ha zoned for homes · no homes built on it yet · 274 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 6

      Applications within 500 m, by year

      Between 1 and 2 a year; busiest 2025. 92% of decisions were approvals.

      2021: 5, 2022: 1, 2023: 1, 2024: 1, 2025: 2, 2026: 205102021: 4 approved2021: 1 refused5’21*2022: 1 approved1’222023: 1 approved1’232024: 1 approved1’242025: 2 approved2’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      • 2Aughrim Road , Carnew , Co. Wicklow Approved with conditions
        erect a hurling wall in our existing sports ground with all associated site works
        266063420 Aug 20260 m
      • 3Aughrim Road , Carnew , Co. Wicklow Approved with conditions
        1) permission for retention of part removal of existing wall and formation of hardcore area and 2) permission…
        26602924 Jun 20260 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 1 in the last 12 months
      1 no sign-off needed
      • Schoolheight, Brunswick Row, Carnew, Wicklow · 30 Mar 2026 · 1 homes · short notice no sign-off needed · 25239 · 431 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area About as busy as most of Wicklow County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here3
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 7

      This street block against the council

      67% of homes built before 1971 (council 26%). 72% owner-occupied (council 71%).

      Homes built before 1971
      67% · council 26%
      Homes built since 2001
      8% · council 32%
      Owner-occupied
      72% · council 71%
      Rented
      20% · council 24%
      Children under 15
      12% · council 21%
      Aged 65 and over
      22% · council 15%
      Households with 2+ cars
      44% · council 48%
      Work mainly from home
      6% · council 14%
      This small area (147 people)Wicklow

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257021008

      Bus
      605 m
      Carnew · 132, 800a
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      679 m
      All Saints National School, 23 pupils
      Homes sold nearby
      5
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • All Saints National School · primary · 23 pupils · 679 m
      • Coláiste Bhríde Carnew · postprimary · 830 pupils · 765 m
      • Carnew NS · primary · 185 pupils · 768 m

      Stops 2

      • Carnew · 132, 800a · 1/hour at peak · 605 m
      • Carnew · 132, 800a · 632 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • All Saints National School · 679 m-17.9% pupils (23)
      • Coláiste Bhríde Carnew · 765 m-7.4% pupils (830)
      • Carnew NS · 768 m-3.1% pupils (185) · 2 classrooms 2024, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G4 (open space), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Carnew
      Electoral division
      Carnew
      Electoral area
      Baltinglass
      Council
      Wicklow County Council
      Everything we found, as a list 8 lines
      • Zoned G4 (open space); not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 empty zoned plot.
      • No morning-peak service within 500 m; nearest is Carnew, 605 m away (3 a day).
      • Here (2022 census): 72% owner-occupied (council 71%); 13% of homes empty (council 7%); most built before 1919; 58% drive to work (council 58%); population up 10% since 2016.
      • The council decides in a median 54 days (about 8 weeks); 39% are asked for more information.
      • 2 applications nearby in the last 12 months.
      • Carnew NS, 768 m away: 2 classrooms approved (2024). Pupils down 3% last year.
      • 3 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      water.ie—© the publisher · flag only—
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 07:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.