PlanningRegister.ie
Planning report · Clare County Council · 2000 m around the house · the last 12 months · 19 Oct 2026, 16:43

Kiltenanlea ED, Shannon Municipal District, County Clare, Munster, Éire / Ireland

52.72252, -8.54247

Homes here mostly date from the 1970s. 2 applications nearby open for comments.

See on the mapWatch this area

Not held yet for Clare County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CoollisteigeBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 1 file on Coollisteige2022: 1 file on Coollisteige2024: 1 file on Coollisteige3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings3Saint Senan's Catholic Church; Cloonlara Church (Kiltenanlea)
Monuments17Enclosure; Sheela-na-gig (present location)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 35 on the draft 2027 map; 35 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved, and 1 in 2 is asked for more information.

New house in a garden or site30 decided · more info asked 43%
83% · council 90%
Approved nearbyClare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 30 nearby, 2,601 council-wide

Figure 3

Coollisteige, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

3 planning files on Coollisteige since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2022 · two-storey rear · approved · 22398Porches, roofs, otherNo number · 2024 · other work · refused · 2460287New house in a side gardenNo number · 2021 · new house · approved · 211137
ApprovedRefusedWithdrawn or invalid

3 files with "Coollisteige" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–53 (n=14)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated18 decided home extensions, 1 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 3 appealed refusals became permissions.

    Refusals appealed3 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months
    • 500253 Granted · Coolderry, Dromintobin North, Dromintobin South, Knockbrack Lower,… · 1.3 km
    • 324491 Pending · at Ballyglass, Blackwater, Castlebank, Lakyle, Mountcatherine,… · 1.8 km
    • 501057 Granted · Lisduff, Clonlara, Co. Clare. · 1.0 km
    • 500290 Refused · 9 Glor na Srutha, Clonlara, Co. Clare. · 806 m
    • 323980 Pending · in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and… · 1.9 km
    • 500266 Invalid · 9 Glor na Srutha, Clonlara, Co. Clare. · 806 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher19 Oct 2026, 01:37open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 4

    What's changing around you?

    Street map around Kiltenanlea ED, Shannon Municipal District, County Clare, Munster, Éire / Ireland with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingEmpty land zoned for homesNo decision yetApproved
    1. 1Saint Senan's Church of Ireland, Church Road 2660659No decision yet · 792 m
    2. 2Errinagh, Clonlara 2660653No decision yet · 1.5 km
    3. 3Coolisteige, Clonlara 2660545Refused · 902 m
    4. 4Coolisteige, Clonlara 2660546Refused · 941 m
    5. 52.3 ha zoned for homesEmpty land zoned for homes · 527 m
    6. 61.8 ha zoned for homesEmpty land zoned for homes · 528 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 576 m
    8. 80.1 ha zoned for homesEmpty land zoned for homes · 599 m
    9. 90.8 ha zoned for homesEmpty land zoned for homes · 634 m
    10. 100.1 ha zoned for homesEmpty land zoned for homes · 636 m
    11. 11Coolisteig, Clonlara 2660358No decision yet · 162 m
    12. 12Clonlara Tld., Clonlara 2660373No decision yet · 531 m
    13. 13Coolisteige, Clonlara 25353Approved with conditions · 680 m
    14. 14Doonass, Clonlara 26138No decision yet · 702 m
    15. 15Coolisteige, Clonlara 25363Approved with conditions · 713 m
    Figure 6

    The next 30 days

    6 deadlines within 2.0 km; the first closes 22 Oct 2026.

    6 deadlines in the next 30 days: 2026-10-22 ACP 318782: Refuse Perm.; 2026-10-29 ACP 500253: Grant permission; 2026-11-06 2660546: REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works; 2026-11-06 2660545: REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works; 2026-11-11 2660653: application received — to retain revised site boundary as outlined which deviates from that previously granted permission (Planning Ref 15/195); 2026-11-12 2660659: application received — for the change of use of the existing church building to a boxing gymnasium, including internal and external alterationstoday24 Oct29 Oct3 Nov8 Nov13 Nov18 NovACP 318782: Refuse Perm. · 1.1 km away · 2026-10-22ACP 500253: Grant permission · 1.3 km away · 2026-10-292660546: REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works · 941 m away · 2026-11-062660545: REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works · 902 m away · 2026-11-062660653: application received — to retain revised site boundary as outlined which deviates from that previously granted permission (Planning Ref 15/195) · 1.5 km away · 2026-11-112660659: application received — for the change of use of the existing church building to a boxing gymnasium, including internal and external alterations · 792 m away · 2026-11-12
    Comments closeTime to appeal endsHigh Court window ends
    • Time to ask the High Court for a review ends 22 Oct 20263 days left
      Refuse Perm.
      1.1 km away
    • Time to ask the High Court for a review ends 29 Oct 202610 days left
      Grant permission
      1.3 km away
    • Time to appeal ends 6 Nov 202618 days left
      42660546 · REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all…
      €220 to An Coimisiún Pleanála (€110 observer) · 941 m away
    • Time to appeal ends 6 Nov 202618 days left
      32660545 · REFUSED — for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all…
      €220 to An Coimisiún Pleanála (€110 observer) · 902 m away
    • Comments close 11 Nov 202623 days left
      22660653 · application received — to retain revised site boundary as outlined which deviates from that previously granted…
      €20 to the council · 1.5 km away
    • Comments close 12 Nov 202624 days left
      12660659 · application received — for the change of use of the existing church building to a boxing gymnasium, including internal…
      €20 to the council · 792 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 2.0 km

    Empty land zoned for homes 10

    • 52.3 ha zoned for homes · no homes built on it yet · 527 m
    • 61.8 ha zoned for homes · no homes built on it yet · 528 m
    • 70.2 ha zoned for homes · no homes built on it yet · 576 m
    • 80.1 ha zoned for homes · no homes built on it yet · 599 m
    • 90.8 ha zoned for homes · no homes built on it yet · 634 m
    • 100.1 ha zoned for homes · no homes built on it yet · 636 m
    • 2.6 ha zoned for homes · no homes built on it yet · 641 m
    • 0.7 ha zoned for homes · no homes built on it yet · 651 m
    • 0.7 ha zoned for homes · no homes built on it yet · 658 m
    • 0.2 ha zoned for homes · no homes built on it yet · 691 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 2 a year; busiest 2022. 89% of decisions were approvals.

    2020: 2, 2021: 1, 2022: 2, 2024: 2, 2025: 205102020: 2 approved2’20*2021: 1 approved1’212022: 2 approved2’222024: 1 approved2024: 1 refused2’242025: 2 approved2’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2020 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 21 in the last 12 months

    See every application on the map

    • 3Coolisteige , Clonlara , Co. Clare Refused
      for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all…
      26605459 Oct 20261 homes902 m
    • 4Coolisteige , Clonlara , Co. Clare Refused
      for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all…
      26605469 Oct 20261 homes941 m
    • Coollisteige , Clonlara , Co. Clare Approved with conditions
      to carry out the following works: the re-slating and raising of the roof height, a new dormer window to the…
      2619814 Sept 20261 homes759 m
    • Coolisteige , Clonlara , Co. Clare Approved with conditions
      for a change of house design from that granted under planning reference No P23/60008 and P25/401 and all…
      261884 Sept 20261 homes1.0 km
    • 12Clonlara Tld. , Clonlara , Co. Clare No decision yet
      for development which will consist of the construction of a dwelling house, a proprietary waste water…
      26603735 Jun 20261 homes531 m
    • Newtown , Clonlara , Co. Clare Approved with conditions
      to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all…
      2615027 Jul 20261 homes1.9 km
    • 11Coolisteig , Clonlara , Co. Clare V94 C9X9 No decision yet
      of the demolition of the original cottage previously existing on site during the course of development works…
      266035829 May 20261 homes162 m
    • Knockbrack , Clonlara , Co. Clare V94 R59D Approved with conditions
      for the demolition of existing detached dwelling owing to building condemnation and replacement with new…
      266032713 Jul 20261 homes1.3 km
    • Doonass Demesne , Clonlara , Co. Clare V94 VKX0 Approved with conditions
      to construct an 119m2 extension to existing dwelling house, the construction of a new garage, the upgrading…
      266032413 Jul 20261 homes1.6 km
    • 14Doonass , Clonlara , Co. Clare No decision yet
      to carry out the following works: 1. Carry out alterations/modifications to the existing dwelling. 2.…
      2613819 May 20261 homes702 m
    • Hall Green , Bartleystown , Clonlara Approved with conditions
      for (a) removal of existing ground floor roof over living room area, (b) construct first floor above living…
      26601678 May 20261 homes1.5 km
    • Doonass , Clonlara , Co. Clare Approved with conditions
      to construct a detached dwelling house, site entrance, bored well, waste water treatment system and…
      26601658 May 20261 homes1.0 km
    • Lisduff , Clonlara , Co. Clare Approved with conditions
      for the following development which will consist of planning for the construction of a detached dormer…
      261213 Mar 20261 homes1.0 km
    • Coolisteige , Clonlara , Co. Clare Approved with conditions
      for change of house design from that granted under planning reference No P23/60008 and all associated site…
      2540118 Feb 20261 homes1.0 km
    • Doonass , Clonlara , Co. Clare Approved with conditions
      for revised house design and garage design from that permitted under planning permission reference 24/380 and…
      256077229 Apr 20261 homes1.1 km
    • Clonlara Tld. , Clonlara , Co. Clare Withdrawn or not valid
      for development which will consist of the construction of a dwelling house with garage/store a proprietary…
      256072725 Nov 20251 homes531 m
    • 15Coolisteige , Clonlara , Co. Clare Approved with conditions
      to upgrade and relocate waste water treatment system, percolation area and all associated site works
      2536314 May 20261 homes713 m
    • 13Coolisteige , Clonlara , Co. Clare Approved with conditions
      to construct dwelling house, waste water treatment system, percolation area, entrance, RETENTION permission…
      2535312 Mar 20261 homes680 m
    • Lisduff , Clonlara , Co. Clare V94 E7EK Withdrawn or not valid
      to renovate and extend the existing dwelling house to include decommissioning of existing septic tank,…
      25606806 Nov 20251 homes1.2 km
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Building work nearby 4 in the last 12 months
    2 not signed off2 no sign-off needed
    • Lisduff, Coolisteige, Clare · 14 Sept 2026 · short notice no sign-off needed · PL-501057-CE-26 · 1.1 km
    • Doonass, Cooga, Clare · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660165 · 1.1 km
    • Coolistigue, Coolisteige, Clare · 24 Feb 2026 · 1 homes · start notice not signed off · 2560518 · 1.1 km
    • Church Road, Cloonlara, Clare · 4 Nov 2025 · 1 homes · start notice not signed off · 2567 · 995 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Homes coming 0 not started
    • Clonlara · 40 homes · building started · 866 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Clonlara Community Childcare · Crèche27 Apr 2026 · report · Tusla Early Years Inspectorate683 m
    Little Dreamers Pre- school · Crèche9 Jan 2024 · report · Tusla Early Years Inspectorate683 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Clare County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here87
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    90% owner-occupied (council 72%).

    Homes built before 1971
    18% · council 26%
    Homes built since 2001
    26% · council 32%
    Owner-occupied
    90% · council 72%
    Rented
    6% · council 21%
    Children under 15
    21% · council 20%
    Aged 65 and over
    19% · council 17%
    Households with 2+ cars
    63% · council 47%
    Work mainly from home
    15% · council 11%
    This small area (323 people)Clare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 037103001

    Bus
    746 m
    Clonlara · 345
    Nearest school
    855 m
    Scoil Seanain Naofa, 276 pupils
    Schools, stops and the council

    Schools

    • Scoil Seanain Naofa · primary · 276 pupils · 855 m

    Stops 2

    • Clonlara · 345 · 0/hour at peak · 746 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Seanain Naofa · 855 m0% pupils (276)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 792 m away open for comments until 12 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Coollisteige
    Electoral division
    Kiltenanlea
    Electoral area
    Shannon
    Council
    Clare County Council
    Everything we found, as a list 8 lines
    • No vacant land tax.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 12 Nov 2026.
    • No morning-peak service within 500 m; nearest is Clonlara, 746 m away (5 a day).
    • Here (2022 census): 90% owner-occupied (council 72%); 7% of homes empty (council 17%); most built 1971–1980; 66% drive to work (council 66%); population up 4% since 2016.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 1 in the last year, 42 three years before.
    • 21 applications nearby in the last 12 months; 86% approved (council 94%); 14% for work already built (council 20%).
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 16:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.