PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 10 Nov 2026, 09:00

St Johns Villas

52.79465, -6.16632

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (93%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

arklow and environs local area plan · 4 Mar 2018 – 23 Oct 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Arklow and Environs (692 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings12Saint Saviour's Church (Arklow); house
Radon grid squares1
Monuments2R146652; Battlefield
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 12 on the draft 2027 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record · fetched 10 Nov 2026, 00:04
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.08 Nov 2026, 23:20open
EPA licensed facilities (LEAP)CC BY 4.010 Nov 2026, 00:04open
Residential Zoned Land Tax mapsCC BY 4.09 Nov 2026, 00:15open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 40% approved, and 1 in 5 is asked for more information.

Single-storey rear11 decided · more info asked 0%
100% · council 95%
Attic or dormer11 decided · more info asked 9%
91% · council 92%
New house in a garden or site10 decided · more info asked 20%
40% · council 81%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 32 nearby, 1,683 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 50 days. 1 in 8 is asked for more information, which adds about 56 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 8): 104 days; Appeal window: 4 weeks; Building starts: 109 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 47–54 (n=59)50 daysIf more info asked (1 in 8)With further information: median 104 days (n=8)104 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 109 days after permission (n=20)109 days after permissionSigned off45% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated67 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 8 appealed refusals became permissions. 1 of 6 appealed approvals were reversed.

    Refusals appealed8 decided
    2 became permissions
    Approvals appealed6 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around St Johns Villas with 3 numbered planning items
    ⌖ the houseDerelict buildingApproved
    1. 1Derelict site DS/172 DS/172Derelict building · 304 m
    2. 2Lidl Wexford Road, (and adjoining former Healy Premises at Y14 Y072) 2660582Approved with conditions · 179 m
    3. 3c. 0.010 ha site in the car park of Tesco Extra, Wexford Road 2660445Approved with conditions · 334 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 34 permissions since 2016, 7 show a start notice and 1 has a completion certificate.

    46 applications lodged within 500 m. Council: 33 approved, 13 refused. After appeals: 34 approved. Of those: 1 signed off, 3 built with the owner's opt-out, 3 started, 26 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved13: lodged → refused33: approved → approved12: refused → refused1 refused by the council, approved after an appeal26: approved → no start notice found3: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off1: approved → ran out46 lodged46 lodged33 approved33 approved13 refused13 refused34 approved34 approved12 refused12 refused26 no start notice found26 no start notice found3 built, owner opted out3 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured46 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Derelict building 1

      • 1Derelict site DS/172 · listed as derelict · 304 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 10 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
      Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
      Derelict sites registersCC BY 4.09 Nov 2026, 23:25open
      National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.09 Nov 2026, 00:15open
      Figure 7

      Applications within 500 m, by year

      Between 7 and 15 a year; busiest 2022. 72% of decisions were approvals.

      2021: 3, 2022: 15, 2023: 7, 2024: 11, 2025: 8, 2026: 2051015202021: 3 approved3’21*2022: 8 approved2022: 7 refused15’222023: 5 approved2023: 2 refused7’232024: 9 approved2024: 2 refused11’242025: 6 approved2025: 2 refused8’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 10 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
      Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
      Building work nearby 2 in the last 12 months
      2 not signed off
      • Wexford Road, Arklow, Wicklow · 7 Oct 2026 · 7-day notice not signed off · 24/60284 · 257 m
      • Wexford Road, Arklow, Wicklow · 7 Oct 2026 · 7-day notice not signed off · 24/60284 · 253 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 10 Nov 2026, 04:54
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      An Scoil Bheag · Crèche7 May 2025 · report · Tusla Early Years Inspectorate371 m
      Pixies Pre-School · Crèche16 Feb 2026 · report · Tusla Early Years Inspectorate373 m
      Blackberry Academy Montessori · Crèche16 Jul 2025 · report · Tusla Early Years Inspectorate544 m
      Budding Tots Montessori Preschool · Crèche23 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 813 m
      Frances' Little Flowers · Crèche14 Apr 2026 · report · Tusla Early Years Inspectorateapprox. 813 m
      Imagination Station · Crèche6 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 813 m
      Millie's Playschool · Crèche15 Oct 2024 · report · Tusla Early Years Inspectorateapprox. 813 m
      Ballyflanigan Montessori Pre- school · Crèche12 Jun 2025 · report · Tusla Early Years Inspectorateapprox. 813 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area Busier than most of Wicklow County Council.
      Homes approved
      Here100
      Council middle0
      Homes started
      Here35
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
      Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
      National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      41% of homes built before 1971 (council 26%). 68% owner-occupied (council 71%).

      Homes built before 1971
      41% · council 26%
      Homes built since 2001
      0% · council 32%
      Owner-occupied
      68% · council 71%
      Rented
      31% · council 24%
      Children under 15
      7% · council 21%
      Aged 65 and over
      32% · council 15%
      Households with 2+ cars
      25% · council 48%
      Work mainly from home
      5% · council 14%
      This small area (189 people)Wicklow

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257004020

      Bus
      270 m
      Arklow W · 183, 2, 740A · busiest stop within 500 m: 3 an hour at peak
      Nearest school
      320 m
      Arklow CBS, 392 pupils
      Homes sold nearby
      39
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Arklow CBS · postprimary · 392 pupils · 320 m
      • St John's Senior School · primary · 323 pupils · 385 m
      • Carysfort Mxd NS · primary · 197 pupils · 509 m
      • Glenart College · postprimary · 633 pupils · 581 m
      • St Michael's and St Peter's Junior School · primary · 250 pupils · 606 m
      • Gaelscoil An Inbhir Mhoir · primary · 242 pupils · 607 m
      • St Marys College · postprimary · 527 pupils · 655 m
      • Gaelcholáiste na Mara · postprimary · 279 pupils · 725 m

      Stops 8

      • Arklow W · 183, 2, 740A, 800, 800a, BR01 · 3/hour at peak · 270 m
      • Arklow W · 183, 2, 740A, 800, 800a, BR01 · 1/hour at peak · 275 m
      • Arklow · Dublin - Europort · 0/hour at peak · 462 m
      • Arklow Stn · 183, 800, 800a · 1/hour at peak · 473 m
      • Arklow · 2 · 1/hour at peak · 580 m
      • Yardland · 183 · 0/hour at peak · 736 m
      • Arklow · 2 · 1/hour at peak · 763 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Arklow CBS · 320 m+2.3% pupils (392)
      • St John's Senior School · 385 m-8% pupils (323)
      • Carysfort Mxd NS · 509 m-0.5% pupils (197)
      • Glenart College · 581 m+0.6% pupils (633) · an extension 2026, approved with conditions
      • St Michael's and St Peter's Junior School · 606 m-10.1% pupils (250) · an extension 2024, approved with conditions
      • Gaelscoil An Inbhir Mhoir · 607 m-12% pupils (242) · temporary classrooms 2024, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 10 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.08 Nov 2026, 23:06open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
      Council consultation portalsPublic10 Nov 2026, 01:21open
      Council meetings (ModernGov)Public10 Nov 2026, 02:40open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Sheephouse
      Electoral division
      Arklow No. 1 Urban
      Electoral area
      Arklow
      Council
      Wicklow County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 1 site nearby could change: 1 derelict.
      • Arklow W (bus 183, 2) 270 m away: 3 an hour at morning peak; 5 from all stops within 500 m.
      • Here (2022 census): 68% owner-occupied (council 71%); 7% of homes empty (council 7%); most built 1971–1980; 53% drive to work (council 58%); population up 4% since 2016.
      • 1 home extension within 250 m since 2026.
      • Around here the council decides in a median 52 days (about 7 weeks); 1 in 4 is asked for more information.
      • 2 applications nearby in the last 12 months.
      • Glenart College, 581 m away: an extension approved (2026).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.06 Nov 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.010 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public10 Nov 2026
      www2.courts.ie—© the publisher9 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.09 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.010 Nov 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.08 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public10 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.010 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence10 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.09 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.06 Nov 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.08 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 10 Nov 2026, 09:00 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.