PlanningRegister.ie
Planning report · Carlow County Council · 2000 m around the house · the last 12 months · 20 Oct 2026, 05:56

Bridge Street, Tullowphelim

52.80288, -6.73671

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (96%). A building site 84 m away stopped before it was finished.

See on the mapWatch this area

Not held yet for Carlow County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (CW008-045----)
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Centre: To protect, provide for and/or improve town and village centre facilities and uses

The main town centre — retail, offices, civic uses, apartments.

carlow county development plan 2022 2028 variation number 3 tullow district town plan 2026 · 4 Jul 2022 – 3 Jul 2028

Protected building13 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory5 within 100 m house; house
Monument zoneOn this site Historic town, Templeowen,Tullowbeg,Tullowphelim; Cross, Tullowphelim
Radon1 in 10 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings22Mount Wolseley; forge/smithy
Radon grid squares1
Monuments34Mill - unclassified; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 90% are asked for more information.

New house in a garden or site10 decided · more info asked 90%
100% · council 89%
Approved nearbyCarlow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 720 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 50 days. 1 in 2 is asked for more information, which adds about 90 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 2): 183 days; Appeal window: 4 weeks; Building starts: 117 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 46–52 (n=22)50 daysIf more info asked (1 in 2)With further information: median 183 days (n=23)183 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 117 days after permission (n=19)117 days after permissionSigned off63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated45 decided home extensions, 19 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 5 appealed refusals became permissions. 0 of 6 appealed approvals were reversed.

    Refusals appealed5 decided
    3 became permissions
    Approvals appealed6 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501670 Pending · Tullow Hill , Tullow , Co.Carlow · 1.1 km
    • 500945 Withdrawn · The Green Templeowen , Abbey St , Tullow · 258 m
    • 500944 Invalid · The Green Templeowen , Abbey St , Tullow · 258 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher20 Oct 2026, 01:39open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 4

    What's changing around you?

    Street map around Bridge Street, Tullowphelim with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingBuilding site that stoppedApprovedNo decision yetRefused
    1. 1THOMAS TRAYNOR STREET, TULLOW 2660290No decision yet · 194 m
    2. 2The Green Templeowen, Abbey St 2660297No decision yet · 258 m
    3. 37 Shillelagh Rd, Tullowphelim 2660229Approved with conditions · 1.1 km
    4. 4Carlow Road, TullowBuilding site that stopped · 84 m
    5. 5Bridge Street, Tullow 2560394Approved with conditions · 89 m
    6. 62 Bishop Street, Tullow 2560329Approved with conditions · 97 m
    7. 7Monastery Court, New Chapel Lane 2560368Approved with conditions · 204 m
    8. 8Hawkins Lane, Tullow 2538Approved with conditions · 243 m
    9. 9Dublin Road Tullowphelim, Tullow 2660265No decision yet · 288 m
    10. 10Bunclody Rd., Tullow 2660109Refused · 740 m
    11. 11Shillelagh Road, Tullowphelim 2560414Refused · 836 m
    12. 12Carlow Road, Tullow 2660131No decision yet · 843 m
    13. 134 & 5 Thomas Traynor Road, 'Traynor Avenue' 2660213No decision yet · 949 m
    14. 14Tullow Industrial Estate, Tullow 2660206No decision yet · 1.0 km
    15. 15Tullow Hill, Tullow 2660105Approved with conditions · 1.1 km
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 47 permissions since 2016, 17 show a start notice and 4 have a completion certificate.

    49 applications lodged within 500 m. Council: 48 approved, 1 refused. After appeals: 47 approved. Of those: 4 signed off, 6 built with the owner's opt-out, 7 started, 23 with no start notice found, 7 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT48: lodged → approved1: lodged → refused47: approved → approved1: refused → refused1 approved by the council, withdrawn or invalid after an appeal23: approved → no start notice found6: approved → built, owner opted out7: approved → started, not signed off4: approved → signed off7: approved → ran out49 lodged49 lodged48 approved48 approved1 refused1 refused47 approved47 approved1 refused1 refused1 withdrawn1 withdrawn23 no start notice found23 no start notice found6 built, owner opted out6 built, owner opted out7 started, not signed off7 started, not signed off4 signed off4 signed off7 ran out7 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured49 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 2.0 km; the first closes 27 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-27 2660290: application received — THE INSTALLATION OF AN OFF-LICENCE AREA FOR THE SALE OF BEER AND SPIRITS OFF THE PREMISES, INSTALLATION OF A PIZZA TAKEA; 2026-11-04 2660297: application received — revisions to part of the residential development previously permitted under Planning Ref. 25/60228. It is proposed to ex; 2026-11-05 2660229: CONDITIONAL — extension and alterations to existing dwelling and all associated site workstoday25 Oct30 Oct4 Nov9 Nov14 Nov19 Nov2660290: application received — THE INSTALLATION OF AN OFF-LICENCE AREA FOR THE SALE OF BEER AND SPIRITS OFF THE PREMISES, INSTALLATION OF A PIZZA TAKEA · 194 m away · 2026-10-272660297: application received — revisions to part of the residential development previously permitted under Planning Ref. 25/60228. It is proposed to ex · 258 m away · 2026-11-042660229: CONDITIONAL — extension and alterations to existing dwelling and all associated site works · 1.1 km away · 2026-11-05
    Comments closeTime to appeal ends
    • Comments close 27 Oct 20267 days left
      12660290 · application received — THE INSTALLATION OF AN OFF-LICENCE AREA FOR THE SALE OF BEER AND SPIRITS OFF THE PREMISES,…
      €20 to the council · 194 m away
    • Comments close 4 Nov 202615 days left
      22660297 · application received — revisions to part of the residential development previously permitted under Planning Ref.…
      €20 to the council · 258 m away
    • Time to appeal ends 5 Nov 202616 days left
      32660229 · CONDITIONAL — extension and alterations to existing dwelling and all associated site works
      €220 to An Coimisiún Pleanála (€110 observer) · 1.1 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Carlow Road, Tullow · 16 homes: 16 homes, started Feb 2018, never signed off20182019202020212022202320242025202620272028Carlow Road, Tullow · 16 homes84 m16 homes, started Feb 2018, never signed off16 homes, started Feb 2018, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 2.0 km

    Building site that stopped 1

    • 4Carlow Road, Tullow · 16 homes, started Feb 2018, never signed off · 84 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 3 and 8 a year; busiest 2024. 98% of decisions were approvals.

    2017: 2, 2018: 6, 2019: 5, 2020: 5, 2021: 5, 2022: 5, 2023: 3, 2024: 8, 2025: 1005102017: 2 approved2’17*2018: 5 approved2018: 1 refused6’182019: 5 approved5’192020: 5 approved5’202021: 5 approved5’212022: 5 approved5’222023: 3 approved3’232024: 8 approved8’242025: 10 approved10’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 32 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 12 in the last 12 months
    9 not signed off3 no sign-off needed
    • The Green, Templeowen, Abbey Street, Tullow, Carlow · 21 Sept 2026 · 35 homes · start notice not signed off · 25/60228 · 345 m
    • Barrack Street, Tullow, Carlow · 18 Aug 2026 · 3 homes · start notice not signed off · 2460182 · 276 m
    • Ouragh Road, Tullow, Carlow · 10 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560118 · 549 m
    • Loughmartin Business Park, Tullow, Carlow · 23 Jul 2026 · start notice not signed off · 2560035 · 1.3 km
    • Tullowland, Tullow, Carlow, R93CA21 · 5 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2660028 · 1.5 km
    • Station Road, Tullow, Carlow · 26 May 2026 · 4 homes · start notice not signed off · ABP-320214-24 · 309 m
    • Wolseley Park, Mount Wolseley Golf and Country Club, Tullow, Carlow · 22 May 2026 · 1 homes · start notice not signed off · 25/60351 · 1.4 km
    • 33 Ballymurphy Road, Tullow, Carlow, R93 HW20 · 27 Apr 2026 · 1 homes · short notice no sign-off needed · 468 m
    • Mill Street, Tullow, Carlow, R93 WK22 · 13 Apr 2026 · 2 homes · start notice not signed off · 2560098 · 168 m
    • Bunclody Road, Tullow, Carlow, R93 D402 · 9 Mar 2026 · 7-day notice not signed off · 2560237 · 915 m
    • New Chapel Lane, Tullow, Carlow, R93 X4H1 · 22 Jan 2026 · start notice not signed off · 238 m
    • Bunclody Road, Tullow, Carlow, r93 v585 · 20 Oct 2025 · 7-day notice not signed off · 2460161 · 1.1 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Forward Steps Resource Centre · Crèche15 May 2025 · report · Tusla Early Years Inspectorate248 m
    Respond Early Years Service, Slaney View · Crèche28 Feb 2025 · report · Tusla Early Years Inspectorate630 m
    Tots to Teens · Crèche5 Apr 2024 · report · Tusla Early Years Inspectorate906 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Carlow County Council.
    Homes approved
    Here102
    Council middle0
    Homes started
    Here107
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    21% owner-occupied (council 65%).

    Homes built before 1971
    19% · council 27%
    Homes built since 2001
    42% · council 35%
    Owner-occupied
    21% · council 65%
    Rented
    63% · council 29%
    Children under 15
    19% · council 20%
    Aged 65 and over
    12% · council 15%
    Households with 2+ cars
    10% · council 44%
    Work mainly from home
    7% · council 11%
    This small area (157 people)Carlow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 017051014

    Road noise
    65–69 dB
    day–night average (EPA 2022)
    Bus
    36 m
    Tullow Centre · 800 · busiest stop within 500 m: 0 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    274 m
    S N Phadraig Naofa, 150 pupils
    Homes sold nearby
    1
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Phadraig Naofa · primary · 150 pupils · 274 m
    • St Columbas NS · primary · 93 pupils · 295 m
    • S N Muire Lourdes · primary · 195 pupils · 319 m
    • Tullow Community School · postprimary · 901 pupils · 480 m

    Stops 8

    • Tullow Centre · 800 · 0/hour at peak · 36 m
    • Tullow Centre · 800 · 0/hour at peak · 60 m
    • Tullow South · 369, 800 · 0/hour at peak · 289 m
    • Tullow South · 369, 800 · 0/hour at peak · 290 m
    • Tullow North · 132, 369, 874 · 0/hour at peak · 346 m
    • Tullow North · 132, 369, 874 · 0/hour at peak · 356 m
    • St Patrick's Park · 874 · 535 m
    • St Patrick's Park · 874 · 0/hour at peak · 556 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Phadraig Naofa · 274 m-8.5% pupils (150)
    • St Columbas NS · 295 m+2.2% pupils (93)
    • S N Muire Lourdes · 319 m-8% pupils (195)
    • Tullow Community School · 480 m+3.4% pupils (901)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Stalled build 84 m away (Carlow Road, Tullow): what happens next?
      Ask for: Ask the agent and the council.
      Council
    4. Application 194 m away open for comments until 27 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Mapped at 65–69 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Tullowphelim
    Electoral division
    Tullow Urban
    Electoral area
    Tullow
    Council
    Carlow County Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); monument zone; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 stalled build.
    • 2 applications open for comments nearby; nearest closes 27 Oct 2026.
    • Tullow Centre (bus 800) 36 m away: 4 a day, fewer than one an hour at morning peak; 2 from all stops within 500 m.
    • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 63% rent (council 29%); 16% of homes empty (council 8%); most built 2001–2010; 44% drive to work (council 62%); population up 10% since 2016.
    • The council decides in a median 81 days (about 12 weeks); 52% are asked for more information.
    • Homes started within 1 km: 46 in the last year, 54 three years before.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 05:56 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.