Planning Register
Site report · 500 m radius · generated 13 Sept 2026, 15:02

Vale Road

Eircode Coordinates 52.80617, -6.17722Local authority Wicklow County Council
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

What closes soonest 0 open windows

No observation, appeal or consultation window is open within 500 m today.

    Sources: acp, consult, moderngov, npad, rzlt · fetched 12 Sept 2026, 00:05
    SourceLicenceFetchedLink
    acpCC-BY-4.012 Sept 2026, 00:05open
    consultpublic12 Sept 2026, 02:04open
    moderngovpublic12 Sept 2026, 21:48open
    npadCC-BY-4.012 Sept 2026, 20:38open
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Where this is

    Local authority
    Wicklow County Council
    Sources: places, parcels · fetched 11 Sept 2026, 21:28
    SourceLicenceFetchedLink
    placesCC-BY-4.011 Sept 2026, 21:28open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    Zoning evaluated against the point

    No zoning objective covers this site in the current plan (or the plan is not loaded for this county).

    Source: zoning · fetched 12 Sept 2026, 02:04
    SourceLicenceFetchedLink
    zoningCC-BY-4.012 Sept 2026, 02:04open

    Designations and constraints within 500 m

    No OPW CFRAM/NIFM flood extent within 500 m.

    DesignationCountExamples
    Radon risk area1About 1 in 10 homes in this area is likely to have high radon levels
    Sources: constraints, constraints.radon · fetched 11 Sept 2026, 19:11
    SourceLicenceFetchedLink
    constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11open
    constraints.radonCC-BY-4.011 Sept 2026, 19:11open

    Residential Zoned Land Tax

    This site is not on the current draft or final RZLT map.

    Source: rzlt · fetched 12 Sept 2026, 00:23
    SourceLicenceFetchedLink
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Planning applications 10 in 5 years within 500 m

    Recent decisions and applications

    6
    Conditional
    2
    N/a
    2
    Unconditional
    • Site at Avoca River Park Arklow Town Marsh 10 and 11 Ferrybank Road , within the townlands of Shelton Abbey Marsh and Ferrybank , Co. Wicklow Conditional
      the following works to connect Avoca River Park to public services: • an underground foul pump station and an above ground kiosk with a total height of 1.8m within a secure compound located on lands at Avoca River Park; • a watermain with a total length of c. 2.2km and a foul rising main with a total length of c. 2.2km from the proposed pump station, traversing lands within Avoca River Park, the existing trackway through the marsh, 10 and 11 Ferrybank and terminating in the public road (R772); • installation of fibre connections with a total length of c. 2.2km with fibre ducts; • connection to the existing Uisce Éireann foul network and watermain network; • all associated site development works above and below ground
      2660038received 22 Jan 2026decided 13 Aug 2026445 m away
    • Avoca River Park , Arklow , Co. Wicklow Conditional
      The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
      2560806received 9 Oct 2025decided 27 Nov 2025384 m away
    • Site located at and to the east of Avoca River Park , Arklow , Co. Wicklow Conditional
      • 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
      2560594received 1 Aug 2025decided 24 Apr 2026323 m away
    • Vale Road (Townland of Ballyraine Lower) , Arklow , Co. Wicklow Unconditional
      Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
      2584received 9 Apr 2025decided 9 Jul 20250 m away
    • Site at Avoca River Park , Arklow , Co. Wicklow Conditional
      proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
      23843received 17 Nov 2023decided 28 Mar 2024473 m away
    • Sigma Aldrich Ireland Ltd , Vale Road , Arklow Conditional
      the proposed development will consist of replacing the existing boundary fence on three of the site boundaries with a stronger more secure type of fence as shown on the drawings submitted with this application
      2360047received 16 May 2023decided 7 Jul 2023113 m away
    • Sigma Aldrich Ireland Ltd , Vale Road , Arklow Co. Wicklow N/a
      The proposed development will consist of replacing the existing boundary fence on three of the site boundaries with a stronger more secure type of fence as shown on the drawings with this application.
      2360037received 9 May 2023115 m away
    • Heatherside , Vale Road Yardland Td , Vale Road Arklow N/a
      the as constructed dwelling houses (House Type F3h) at sites 7, 8 & 9 The Rise to replace as granted (House Type F3, Reg Ref 20/235) together with all associated site works within an existing estate (Heatherside being constructed at present) pursuant to Plan Reg. Ref 08/610066, 13/610035, 19/373, 20/235 & 21/1218
      2378received 30 Jan 2023440 m away
    • Site located at Avoca River Park , Arklow , Co. Wicklow Conditional
      the proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
      2372received 27 Jan 2023decided 14 Jun 2023390 m away
    • Heatherside , Vale Road , Yardland Td Unconditional
      extend the appropriate period of 08/610066 - residential development comprising a creche; 185 houses with 4 house types; 8 duplex units over 8 apartments; new access/relief road and infrastructure linking Vale Road to Lamberton Avenue; all services and ancillary site development works; relocation of part of existing overhead ESB lines; with temporary effluent treatment plant and sewerage pumping station at Yardland Td
      211218received 8 Oct 2021decided 13 Jan 2022443 m away

    `description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.

    Source: npad · fetched 12 Sept 2026, 20:38
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Sept 2026, 20:38open

    Appeals 0 in 5 years within 500 m

    No appeal to An Coimisiún Pleanála within 500 m in 5 years.

      Source: acp · fetched 12 Sept 2026, 00:05
      SourceLicenceFetchedLink
      acpCC-BY-4.012 Sept 2026, 00:05open

      Commencement notices 0 in 3 years within 500 m

      No commencement notice lodged with the Building Control Management System nearby.

        One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).

        Source: bcms · fetched 12 Sept 2026, 23:34
        SourceLicenceFetchedLink
        bcmsCC-BY-4.012 Sept 2026, 23:34open

        Sales 0 in 36 months within 500 m

        No Property Price Register sale geocoded within 500 m in 36 months.

        Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
        SourceLicenceFetchedLink
        cara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14open
        pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31open

        Consultations 0 matched by place

        No open council consultation covers this place.

          Source: consult · fetched 12 Sept 2026, 02:04
          SourceLicenceFetchedLink
          consultpublic12 Sept 2026, 02:04open

          Council items 0 in 24 months

          No committee item is geolinked to this place. Council minutes are linked at county or electoral-area level, so this is usually empty for a single house.

            Source: moderngov · fetched 12 Sept 2026, 21:48
            SourceLicenceFetchedLink
            moderngovpublic12 Sept 2026, 21:48open

            Capacity and public land

            No publishable utility-capacity record within the radius.

            No site on the LDA register of relevant public lands within 500 m.

            Source: lda_lands · fetched 11 Sept 2026, 16:43
            SourceLicenceFetchedLink
            lda_landsCC-BY-4.011 Sept 2026, 16:43open

            Schools and public transport within 1.0 km

            Schools

            None within 1.0 km.

              Stops 0 · routes

                Sources: gtfs, schools · fetched 11 Sept 2026, 19:16
                SourceLicenceFetchedLink
                gtfsCC-BY-4.011 Sept 2026, 19:16open
                schoolsCC-BY-4.011 Sept 2026, 16:41open

                Sources used in this report

                SectionSourceLicenceFetched
                LocationplacesCC-BY-4.011 Sept 2026, 21:28
                ParcelparcelsCC-BY-4.011 Sept 2026, 19:06
                ZoningzoningCC-BY-4.012 Sept 2026, 02:04
                Constraintsconstraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11
                Constraintsconstraints.radonCC-BY-4.011 Sept 2026, 19:11
                RzltrzltCC-BY-4.012 Sept 2026, 00:23
                PlanningnpadCC-BY-4.012 Sept 2026, 20:38
                AppealsacpCC-BY-4.012 Sept 2026, 00:05
                CommencementsbcmsCC-BY-4.012 Sept 2026, 23:34
                Salescara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14
                SalespprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31
                Consultationsconsultpublic12 Sept 2026, 02:04
                Council itemsmoderngovpublic12 Sept 2026, 21:48
                Public landlda_landsCC-BY-4.011 Sept 2026, 16:43
                Projectssocial_housingCC-BY-SA-4.011 Sept 2026, 20:13
                AmenitiesgtfsCC-BY-4.011 Sept 2026, 19:16
                AmenitiesschoolsCC-BY-4.011 Sept 2026, 16:41
                DeadlinesacpCC-BY-4.012 Sept 2026, 00:05
                Deadlinesconsultpublic12 Sept 2026, 02:04
                Deadlinesmoderngovpublic12 Sept 2026, 21:48
                DeadlinesnpadCC-BY-4.012 Sept 2026, 20:38
                DeadlinesrzltCC-BY-4.012 Sept 2026, 00:23

                Generated 13 Sept 2026, 15:02 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.