PlanningRegister.ie
Planning report · Clare County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:45

Shanaway Road

52.84301, -9.02438

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2024. 16 homes approved 342 m away haven't started.

See on the mapWatch this area

Not held yet for Clare County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilnacallyBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2024: 2460110 · garage, approved2021: 1 file on Kilnacally2022: 1 file on Kilnacally2023: 1 file on Kilnacally2024: 2 files on Kilnacally5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2460110 · garage · approved 2024 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

ennis and environs · 20 Apr 2023 – 19 Apr 2029

ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

ennis and environs settlement plan variation no 1 · 20 Apr 2023 – 19 Apr 2029

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments10Ringfort - cashel; Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 17 on the draft 2027 map; 17 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

New house in a garden or site10 decided · more info asked 30%
80% · council 90%
Approved nearbyClare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 1,607 council-wide

Figure 3

Kilnacally, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

5 planning files on Kilnacally since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 2166Porches, roofs, otherNo number · 2023 · other work · approved · 23459No number · 2024 · other work · approved · 24411New house in a side gardenNo number · 2022 · new house · approved · 221035No number · 2024 · new house · approved · 2460110
ApprovedRefusedWithdrawn or invalid

5 files with "Kilnacally" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    0 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Shanaway Road with 9 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesBuilding startedNo decision yet
    1. 1BallyLannidy 22263Approved, no sign building has started · 342 m
    2. 23.2 ha zoned for homesEmpty land zoned for homes · 61 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 112 m
    4. 40.6 ha zoned for homesEmpty land zoned for homes · 150 m
    5. 50.8 ha zoned for homesEmpty land zoned for homes · 185 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 187 m
    7. 7Shanaway Road, Kilnacally 22/1035Building started · 193 m
    8. 80.4 ha zoned for homesEmpty land zoned for homes · 215 m
    9. 9Kilquane, Ballylannidy 2560786No decision yet · 283 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 16 permissions since 2016, 4 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    17 applications lodged within 500 m. Council: 16 approved, 1 refused. After appeals: 16 approved. Of those: 0 signed off, 3 built with the owner's opt-out, 1 started, 6 with no start notice found, 6 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT16: lodged → approved1: lodged → refused16: approved → approved1: refused → refused6: approved → no start notice found3: approved → built, owner opted out1: approved → started, not signed off6: approved → ran out17 lodged17 lodged16 approved16 approved1 refused1 refused16 approved16 approved1 refused1 refused6 no start notice found6 no start notice found3 built, owner opted out3 built, owner opted out1 started, not signed off1 started, not signed off6 ran out6 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured17 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      16 homes 342 m away were approved Jun 2024 with no start notice yet; the permission runs to Jun 2029.

      BallyLannidy · 16 homes: 16 homes approved Jun 2024, not started2024202520262027202820292030BallyLannidy · 16 homes342 m · 2226316 homes approved Jun 2024, not started16 homes approved Jun 2024, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 11 within 500 m

      Approved, not started 1

      • BallyLannidy · 16 homes approved Jun 2024, not started · 342 m

      Empty land zoned for homes 10

      • 23.2 ha zoned for homes · no homes built on it yet · 61 m
      • 30.2 ha zoned for homes · no homes built on it yet · 112 m
      • 40.6 ha zoned for homes · no homes built on it yet · 150 m
      • 50.8 ha zoned for homes · no homes built on it yet · 185 m
      • 60.2 ha zoned for homes · no homes built on it yet · 187 m
      • 80.4 ha zoned for homes · no homes built on it yet · 215 m
      • 0.7 ha zoned for homes · no homes built on it yet · 252 m
      • 0.2 ha zoned for homes · no homes built on it yet · 265 m
      • 2.3 ha zoned for homes · no homes built on it yet · 303 m
      • 6.3 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 2 and 4 a year; busiest 2024. 94% of decisions were approvals.

      2021: 7, 2022: 3, 2023: 2, 2024: 4, 2025: 105102021: 6 approved2021: 1 refused7’21*2022: 3 approved3’222023: 2 approved2’232024: 4 approved4’242025: 1 approved1’25
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 1 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 1 in the last 12 months
      1 not signed off
      • 7Shanaway Road, Kilnacally,, Ennis, Clare · 24 Jul 2026 · 1 homes · start notice not signed off · 22/1035 · 193 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Homes coming 16 not started
      • 1BallyLannidy · 16 homes · not started · runs out 10 Jun 2029 · 342 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Woodstock · 16 applications in 10 years · 93% approved · most common: rear

      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Source: Housing estates · fetched 27 Oct 2026, 23:03
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      How busy is this area About as busy as most of Clare County Council.
      Homes approved
      Here16
      Council middle0
      Homes started
      Here4
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      3% of homes built before 1971 (council 26%). 83% owner-occupied (council 72%).

      Homes built before 1971
      3% · council 26%
      Homes built since 2001
      48% · council 32%
      Owner-occupied
      83% · council 72%
      Rented
      14% · council 21%
      Children under 15
      23% · council 20%
      Aged 65 and over
      12% · council 17%
      Households with 2+ cars
      73% · council 47%
      Work mainly from home
      14% · council 11%
      This small area (519 people)Clare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 037057064

      Bus
      167 m
      Kilnacally · NS2 · busiest stop within 500 m: 2 an hour at peak
      Schools, stops and the council

      Schools

      None nearby.

        Stops 4

        • Kilnacally · NS2 · 167 m
        • Kilnacally · NS2 · 2/hour at peak · 211 m
        • Shanvogh · NS2 · 2/hour at peak · 600 m
        • Shanvogh · NS2 · 2/hour at peak · 607 m
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 02:21
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        Council consultation portalsPublic31 Oct 2026, 01:06open
        Council meetings (ModernGov)Public31 Oct 2026, 02:21open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Garage (2460110) built without official sign-off: built properly?
          Ask for: An engineer's opinion of compliance.
          Seller · solicitor
        2. On the vacant land tax map: is the 3% tax being paid?
          Ask for: Your solicitor's check of liability or exemption.
          Solicitor
        3. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Kilnacally
        Electoral division
        Ennis Rural
        Electoral area
        Ennis
        Council
        Clare County Council
        Everything we found, as a list 8 lines
        • 1 application on this site; latest 2460110, approved 2024, started, no sign-off needed.
        • Zoned R2 (existing residential); on the vacant land tax map.
        • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
        • 16 homes approved nearby, not started; largest 16 at BallyLannidy.
        • Kilnacally (bus NS2) 211 m away: 2 an hour at morning peak.
        • Here (2022 census): 83% owner-occupied (council 72%); 8% of homes empty (council 17%); most built 2001–2010; 71% drive to work (council 66%); population up 9% since 2016.
        • Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
        • 1 applications nearby in the last 12 months.
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 25
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
        www2.courts.ie—© the publisher31 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 31 Oct 2026, 23:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.