PlanningRegister.ie
Planning report · Clare County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:30

R462, Tulla

52.86663, -8.76173

Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2024. 39 homes approved 124 m away haven't started.

See on the mapWatch this area

Not held yet for Clare County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 2 planning files on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 2 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of TullaBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: 2460509 · extension, approved2024: 2460125 · extension, approved2021: 6 files on Tulla2022: 5 files on Tulla2023: 5 files on Tulla2024: 8 files on Tulla2025: 5 files on Tulla2026: 3 files on Tulla32 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2460509 · extension · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2024
    2460125 · extension · approved 2024 · not started, runs out 2029
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

tulla settlement plan · 20 Apr 2023 – 19 Apr 2029

ZoningR2 · Existing residential
What it says

Existing Residential: The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

tulla settlement plan variation no 1 · 20 Apr 2023 – 19 Apr 2029

Heritage inventory1 within 100 m Saint Mochulla's Church (Tulla)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7Tulla Library; Tulla Constabulary Barrack
Monuments6Enclosure; Burnt mound
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 57 on the draft 2027 map; 57 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 7 is asked for more information.

New house in a garden or site13 decided · more info asked 15%
100% · council 90%
Approved nearbyClare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 13 nearby, 1,607 council-wide

Figure 3

Tulla, file by file since 2021

10 of 11 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.

32 planning files on Tulla since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · porch / front · approved · 211301No number · 2021 · other extension · approved · 21229No. 4 · 2021 · rear · approved · 21419No number · 2022 · single-storey rear · approved · 22931No number · 2023 · porch / front · approved · 23282No. 4 · 2023 · rear · approved · 23462No number · 2024 · rear · approved · 2460125No number · 2024 · rear · approved · 2460509No. 13 · 2025 · single-storey rear · approved · 2512No. 9 · 2025 · other extension · refused · 2579No number · 2026 · other extension · approved · 26118Porches, roofs, otherNo number · 2021 · other work · approved · 21214No number · 2021 · other work · approved · 21626No number · 2022 · other work · approved · 221058No number · 2022 · other work · approved · 22150No number · 2022 · other work · refused · 22406No number · 2022 · other work · approved · 22708No number · 2023 · other work · approved · 2360084No number · 2023 · other work · approved · 2360327No number · 2023 · other work · approved · 2360388No number · 2024 · other work · approved · 24205No number · 2024 · other work · approved · 2460041No number · 2024 · other work · approved · 2460475No number · 2024 · other work · approved · 2460622No number · 2025 · other work · approved · 2560332No number · 2025 · other work · approved · 2560582No number · 2025 · other work · approved · 2560633No number · 2026 · other work · approved · 26147New house in a side gardenNo number · 2021 · new house · approved · 211166No number · 2024 · new house · approved · 2415No number · 2024 · new house · approved · 2418No number · 2026 · new house · approved · 2645
ApprovedRefusedWithdrawn or invalid

32 files with "Tulla" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–57 (n=14)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated14 decided home extensions, 4 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    0 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around R462, Tulla with 9 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesApproved
    1. 1Church Road 2460622Approved, no sign building has started · 124 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 35 m
    3. 32.0 ha zoned for homesEmpty land zoned for homes · 62 m
    4. 43.3 ha zoned for homesEmpty land zoned for homes · 146 m
    5. 52.2 ha zoned for homesEmpty land zoned for homes · 147 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 154 m
    7. 71.6 ha zoned for homesEmpty land zoned for homes · 170 m
    8. 8Tulla, Co. Clare 25381Approved · 223 m
    9. 9Bunavory Td, Tulla 26147Approved with conditions · 423 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 26 permissions since 2016, 5 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    28 applications lodged within 500 m. Council: 26 approved, 2 refused. After appeals: 26 approved. Of those: 0 signed off, 3 built with the owner's opt-out, 2 started, 12 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT26: lodged → approved2: lodged → refused26: approved → approved2: refused → refused12: approved → no start notice found3: approved → built, owner opted out2: approved → started, not signed off9: approved → ran out28 lodged28 lodged26 approved26 approved2 refused2 refused26 approved26 approved2 refused2 refused12 no start notice found12 no start notice found3 built, owner opted out3 built, owner opted out2 started, not signed off2 started, not signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured28 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      39 homes 124 m away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2030.

      Church Road · 39 homes: 39 homes approved Sep 2025, not started20242025202620272028202920302031Church Road · 39 homes124 m · 246062239 homes approved Sep 2025, not started39 homes approved Sep 2025, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 10 within 500 m

      Approved, not started 1

      • Church Road · 39 homes approved Sep 2025, not started · 124 m

      Empty land zoned for homes 9

      • 20.2 ha zoned for homes · no homes built on it yet · 35 m
      • 32.0 ha zoned for homes · no homes built on it yet · 62 m
      • 43.3 ha zoned for homes · no homes built on it yet · 146 m
      • 52.2 ha zoned for homes · no homes built on it yet · 147 m
      • 60.2 ha zoned for homes · no homes built on it yet · 154 m
      • 71.6 ha zoned for homes · no homes built on it yet · 170 m
      • 0.4 ha zoned for homes · no homes built on it yet · 171 m
      • 0.9 ha zoned for homes · no homes built on it yet · 183 m
      • 0.3 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 4 and 8 a year; busiest 2024. 93% of decisions were approvals.

      2021: 5, 2022: 5, 2023: 4, 2024: 8, 2025: 4, 2026: 205102021: 5 approved5’21*2022: 4 approved2022: 1 refused5’222023: 4 approved4’232024: 8 approved8’242025: 3 approved2025: 1 refused4’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      • 9Bunavory Td , Tulla , Co. Clare Approved with conditions
        to modify existing entrance to include new agricultural gate entrance alongside relocated vehicular entrance…
        2614723 Jul 2026423 m
      • 8Tulla , Co. Clare Approved
        to Extend the Appropriate Period of Planning Permission for P24/60475 to alter house types approved under…
        253818 Jan 20261 homes223 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 1 in the last 12 months
      1 not signed off
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Homes coming 39 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Bright Sparks Montessori · Crèche25 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 172 m
      Tulla Community Preschool · Crèche2 Dec 2025 · report · Tusla Early Years Inspectorate513 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Clare County Council.
      Homes approved
      Here51
      Council middle0
      Homes started
      Here115
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      50% of homes built before 1971 (council 26%). 80% owner-occupied (council 72%).

      Homes built before 1971
      50% · council 26%
      Homes built since 2001
      31% · council 32%
      Owner-occupied
      80% · council 72%
      Rented
      15% · council 21%
      Children under 15
      23% · council 20%
      Aged 65 and over
      17% · council 17%
      Households with 2+ cars
      56% · council 47%
      Work mainly from home
      17% · council 11%
      This small area (235 people)Clare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 037150004

      Bus
      244 m
      Tulla West · 318, 342, 344 · busiest stop within 500 m: 1 an hour at peak
      Nearest school
      123 m
      St Mochullas N.S., 259 pupils
      Schools, stops and the council

      Schools

      • St Mochullas N.S. · primary · 259 pupils · 123 m
      • St. Joseph's Secondary School Tulla · postprimary · 727 pupils · 383 m

      Stops 4

      • Tulla West · 318, 342, 344 · 1/hour at peak · 244 m
      • Tulla West · 318, 342, 344 · 1/hour at peak · 247 m
      • Tulla · 318, 342, 344 · 1/hour at peak · 373 m
      • Tulla · 318, 342, 344 · 1/hour at peak · 383 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Mochullas N.S. · 123 m+1.2% pupils (259) · a pitch or play area 2025, approved with conditions
      • St. Joseph's Secondary School Tulla · 383 m-0.1% pupils (727)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Extension (2460509) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      2. Extension (2460125) approved 2024, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      3. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      4. 39 homes approved 124 m away (Church Road), not started: what is planned?
        Ask for: The planning file for 2460622.
        Council
      5. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Tulla
      Electoral division
      Tulla
      Electoral area
      Killaloe
      Council
      Clare County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2460509, approved 2025, started, no sign-off needed.
      • Zoned R2 (existing residential); on the vacant land tax map.
      • 10 sites nearby could change: 1 approved scheme, 9 empty zoned plots.
      • 39 homes approved nearby, not started; largest 39 at Church Road.
      • Tulla West (bus 318, 342) 244 m away: 10 a day, fewer than one an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 80% owner-occupied (council 72%); 20% of homes empty (council 17%); most built before 1919; 64% drive to work (council 66%); population up 4% since 2016.
      • 1 home extension within 250 m since 2025.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 23:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.