Wicklow Heights

52.97435, -6.04539

Homes here mostly date from the 1970s. 2 planning files on this house, the latest from 2023. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 2 planning files on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Ballynerrin LowerBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2024: 23701 · extension, approved2017: 171279 · attic or dormer, refused2017: 1 file on Ballynerrin Lower2018: 1 file on Ballynerrin Lower2020: 1 file on Ballynerrin Lower3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    23701 · extension · approved 2024 · not started, runs out 2029
    approvedstartedsigned off
  2. 2017
    171279 · attic or dormer · refused 2017
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wicklow town rathnew local area plan · 23 Jun 2025 – 23 Jun 2031

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Wicklow Port Company (940 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
Monuments2R181294; Burial ground
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), EPA radon map, Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 92% approved, and 1 in 3 is asked for more information.

Single-storey rear25 decided · more info asked 24%
96% · council 96%
Two-storey rear16 decided · more info asked 50%
94% · council 91%
Single-storey side14 decided · more info asked 14%
100% · council 97%
Attic or dormer29 decided · more info asked 24%
93% · council 92%
First-floor12 decided · more info asked 17%
100% · council 90%
Porch or front12 decided · more info asked 0%
100% · council 94%
New house in a garden or site24 decided · more info asked 29%
92% · council 81%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 132 nearby, 3,355 council-wide

Figure 3

Ballynerrin Lower, file by file since 2017

3 planning files on Ballynerrin Lower since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2017 · other work · approved · 1795No number · 2018 · other work · approved · 18253No number · 2020 · other work · approved · 201121New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Ballynerrin Lower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 4 is asked for more information, which adds about 50 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 102 days; Appeal window: 4 weeks; Building starts: 119 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 46–54 (n=132)49 daysIf more info asked (1 in 4)With further information: median 102 days (n=42)102 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 119 days after permission (n=64)119 days after permissionSigned off651 days after the start, for the few who file. 59% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated174 decided home extensions, 64 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 15 appealed refusals became permissions. 0 of 16 appealed approvals were reversed.

    Refusals appealed15 decided
    8 became permissions
    Approvals appealed16 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Wicklow Heights with 9 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesNo decision yetApproved
    1. 119 Saint Patricks Road, Wicklow Town 2660271Approved with conditions · 403 m
    2. 20.9 ha zoned for homesEmpty land zoned for homes · 108 m
    3. 32.7 ha zoned for homesEmpty land zoned for homes · 377 m
    4. 4Ballyguile More, Wicklow Town 26139No decision yet · 107 m
    5. 5No. 10 Halpin Court, Wicklow Town 2660225Approved with conditions · 310 m
    6. 625 Kilmantin Road, Wicklow Town 26176Approved with conditions · 330 m
    7. 725 Kilmantin Road, Wicklow Town 2646Approved with conditions · 330 m
    8. 8"Himmelstor" No. 9 Ballyguilemore, Wicklow Town 2660507Approved with conditions · 416 m
    9. 9Ballyguile Beg, Wicklow Town 2660521Approved with conditions · 439 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 48 permissions since 2016, 16 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    54 applications lodged within 500 m. Council: 48 approved, 6 refused. After appeals: 48 approved. Of those: 1 signed off, 12 built with the owner's opt-out, 3 started, 19 with no start notice found, 13 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT48: lodged → approved6: lodged → refused48: approved → approved6: refused → refused19: approved → no start notice found12: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off13: approved → ran out54 lodged54 lodged48 approved48 approved6 refused6 refused48 approved48 approved6 refused6 refused19 no start notice found19 no start notice found12 built, owner opted out12 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off13 ran out13 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured54 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2660271: CONDITIONAL — garage and outbuildingtoday21 Oct26 Oct31 Oct5 Nov10 Nov15 Nov2660271: CONDITIONAL — garage and outbuilding · 403 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 5 Nov 202620 days left
      12660271 · CONDITIONAL — garage and outbuilding
      €220 to An Coimisiún Pleanála (€110 observer) · 403 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 2 within 500 m

    Empty land zoned for homes 2

    • 20.9 ha zoned for homes · no homes built on it yet · 108 m
    • 32.7 ha zoned for homes · no homes built on it yet · 377 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 9 a year; busiest 2023. 89% of decisions were approvals.

    2017: 9, 2018: 6, 2019: 5, 2020: 3, 2021: 5, 2022: 2, 2023: 9, 2024: 6, 2025: 3, 2026: 605102017: 8 approved2017: 1 refused9’17*2018: 6 approved6’182019: 5 approved5’192020: 2 approved2020: 1 refused3’202021: 4 approved2021: 1 refused5’212022: 2 approved2’222023: 7 approved2023: 2 refused9’232024: 5 approved2024: 1 refused6’242025: 3 approved3’252026: 6 approved6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 2 in the last 12 months
    2 no sign-off needed
    • 25 Kilmantin Road, Wicklow, A67 DE68 · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 26/46 · 339 m
    • 102 Mount Carmel Avenue, Wicklow, A67 X296 · 20 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2560825 · 163 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Little Rascals Pre-school Wicklow · Crèche21 Nov 2024 · report · Tusla Early Years Inspectorate122 m
    Dee's Montessori Pre-school · Crèche10 Feb 2025 · report · Tusla Early Years Inspectorate258 m
    Jellytots Pre School · Crèche17 Sept 2025 · report · Tusla Early Years Inspectorate368 m
    Postman Pats Playgroup · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate449 m
    Balloons Pre-School · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate468 m
    Buttons Preschool Maria Forsyth · Crèche11 May 2026 · report · Tusla Early Years Inspectorate468 m
    The Cave Preschool · Crèche8 Apr 2025 · report · Tusla Early Years Inspectorate680 m
    A Place to Grow Montessori · Crèche1 Dec 2025 · report · Tusla Early Years Inspectorate797 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here191
    Council middle0
    Homes started
    Here205
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    5% of homes built before 1971 (council 26%). 86% owner-occupied (council 71%).

    Homes built before 1971
    5% · council 26%
    Homes built since 2001
    2% · council 32%
    Owner-occupied
    86% · council 71%
    Rented
    9% · council 24%
    Children under 15
    21% · council 21%
    Aged 65 and over
    12% · council 15%
    Households with 2+ cars
    58% · council 48%
    Work mainly from home
    15% · council 14%
    This small area (330 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257078016

    Bus
    288 m
    Convent Road · 131, 133, 183 · busiest stop within 500 m: 3 an hour at peak
    Nearest school
    487 m
    Padraig Naofa NS, 377 pupils
    Homes sold nearby
    140
    in 3 years, 96 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Padraig Naofa NS · primary · 377 pupils · 487 m
    • Dominican College · postprimary · 461 pupils · 539 m
    • Scoil An Choroin Mhuire · primary · 432 pupils · 544 m
    • Wicklow Educate Together Secondary School · postprimary · 404 pupils · 944 m
    • Glebe Ns · primary · 210 pupils · 960 m

    Stops 12

    • Convent Road · 131, 133, 183 · 3/hour at peak · 288 m
    • Convent Road · 131, 133, 183 · 2/hour at peak · 326 m
    • Rose Hill · 131, 133, 183 · 2/hour at peak · 374 m
    • Rose Hill · 131, 133, 183 · 3/hour at peak · 447 m
    • Grand Hotel · 131, 133, 740A, UM11 · 3/hour at peak · 651 m
    • Grand Hotel · 131, 133, 740, 740A, UM11 · 2/hour at peak · 685 m
    • Wicklow Village · 183 · 1/hour at peak · 708 m
    • Wicklow Village · 183 · 1/hour at peak · 713 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Padraig Naofa NS · 487 m+2.2% pupils (377)
    • Dominican College · 539 m-2.5% pupils (461)
    • Scoil An Choroin Mhuire · 544 m+1.6% pupils (432)
    • Wicklow Educate Together Secondary School · 944 m+7.7% pupils (404)
    • Glebe Ns · 960 m+1.4% pupils (210)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Council consultation portalsPublic16 Oct 2026, 01:34open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (23701) approved 2024, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Attic or dormer (171279) refused 2017: built anyway?
      Ask for: The seller's answer and your surveyor's check.
      Seller · solicitor
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballynerrin Lower
    Electoral division
    Wicklow Urban
    Electoral area
    Wicklow
    Council
    Wicklow County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest 23701, approved 2024, not started, runs out 2029.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 2 sites nearby could change: 2 empty zoned plots.
    • Convent Road (bus 131, 133) 288 m away: 3 an hour at morning peak; 11 from all stops within 500 m.
    • Here (2022 census): 86% owner-occupied (council 71%); 6% of homes empty (council 7%); most built 1971–1980; 56% drive to work (council 58%); population up 5% since 2016.
    • Around here the council decides in a median 56 days (about 8 weeks); 40% are asked for more information.
    • Homes started within 1 km: 55 in the last year, 12 three years before.
    • 10 applications nearby in the last 12 months; 100% approved (council 86%).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
    www2.courts.ie—© the publisher16 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 16 Oct 2026, 17:53 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.